設計洪水量 的英文怎麼說

中文拼音 [shèhóngshuǐliáng]
設計洪水量 英文
design flood
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
  1. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的特點,結合以往工程實際,對影響跨河橋梁高度的主要因素? ?及其相應位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和比降的確定原則,並介紹了三日降雨法。
  2. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流算出來的位比非恆定位具有一定的安全儲備;而對于灘地糙率的低估又會造成位的偏低,給防工作帶來隱患;如果利用改進斷面形式來降低位或彌補糙率增加帶來的位抬高,需要較大的工程,所以平時應注意灘面的減糙管理工作。
  3. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洞應用於高頭、大泄流情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大泄流( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋算方法,其算結果與實測值吻合良好;三、利用試驗與算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣估算方法,為導流洞排氣方案的提供了參考依據;六、在高頭、大流條件下,豎井空腔段下部流速很高,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  4. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同頻率的改正系數,使者只需在地形圖上獲取集面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用算器即可迅速算出,大大縮短了周期,且精度較高,一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  5. Measurements of rainfall and water loss as a result of evaporation are essential for various applications in connection with water resources planning, drainage design, water quality control, reservoir design and operation, irrigation as well as hydrological forecasting and flood control

    度雨及因蒸發作用而引致的損耗非常重要,所得結果可以應用於利資源策劃排系統質控制和管理灌溉文預報及防等。
  6. Hydrometeorology is concerned with the study of these atmospheric processes which affect the water resources of the earth and which are of interest to the meteorologist and the hydrological engineer. measurements of rainfall and water loss as a result of evaporation are essential for various applications in connection with water resources planning, drainage design, water quality control, reservoir design and operation, irrigation as well as hydrological forecasting and flood control

    文氣象的研究范圍包括所有影響地球利資源而氣象學家和文工程師又有共同興趣的大氣過程。度雨及因蒸發作用而引致的損耗非常重要,所得結果可以應用於利資源策劃、排系統質控制、和管理、灌溉、文預報及防等。
  7. By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood

    通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把施工導流風險定義為天然來(經過調蓄后,導流泄建築物的最大泄超過其最大泄能力的概率。
  8. When the water situation of any river or lake approaches the guaranteed water level or the safety flow capacity, or when the water level of any reservoir approaches the level of design flood, or when a great danger occurs to flood control works, the flood control headquarters under the relevant people ' s government at or above the county level may declare an emergency flood season

    當江河、湖泊的情接近保證位或者安全流位接近位,或者防工程施發生重大險情時,有關縣級以上人民政府防汛指揮機構可以宣布進入緊急防汛期。
  9. During the planning and designing of hydraulic, communication engineering, there is a lot of work about the design flood calculation of the middle or small drainage basin

    利、交通等規劃工作中,經常會碰到大的中小流域算問題。
  10. According to the instance of the arch dam built, take the discount quotiety, the verification flood water level, the frictional quotiety and, the agglomerate force and as stochastic variable quotiety, calculate the reliability index of the abutment with the calculational programme after the average value and variable quotiety is known

    對于所取的拱壩實例,以揚壓力折減系數,校核位,摩擦系數、 ,凝聚力、為隨機變,在已知其均值並定變異系數的前提下,利用電算程序算其壩肩巖體的可靠指標。
  11. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽電站右岸旋流內消能泄洞是國內第一個泄達1000m s 、頭超過100m ,即將修建的旋流式內消能泄洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建中泄建築物的高速流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展力學的研究與發展均具有重要的理論與實踐意義。
  12. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低頭,大單寬流,低佛氏數特點的低壩樞紐泄消能開辟了一條新途徑,可供有關低壩樞紐與試驗工作者借鑒與參考
  13. By use of many years ' hydrologic data, the max, water quantity dated from every day may be counted in every year ' s flood season, and the designed water quantity corresponds to the definite frequency

    滑動汛期位在多年資料基礎上,通過統汛期中每日為起點的最大來,求出固定頻率的,選擇合適的典型過程線進行調算后得到每天的汛限位。
  14. In the first part, we compute the site design flood of given design frequency ( 0. 01 %. 0. 1 %. 0. 2 % and 1 % ) using the design flood hydrograph. then we get the design reservoir inflow flood of the same design frequency by the resultant discharge method. according to the computing value we compare the site design flood and design reservoir inflow flood of different time interval

    本論文以廣西紅河龍灘電站為例,在第一篇中採用過程線法算了給定頻率為0 . 01 、 0 . 1 、 0 . 2和1的壩址,並利用合成流算了相應頻率的入庫
  15. All the method hare been proved in project to improve the accuracy of designimy rolume of fold when they are used in practice they will also improve the accruing of any desighmy river - crossing bridge

    上述方法經過工程實際驗證,表明可提高的精度,在工程中的應用將提高跨河橋梁的精度。
  16. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底利樞紐復雜的文、地質條件以及龐大的工程規模.該樞紐有3條排沙洞,擔負著泄、排沙、調節徑流和保證進口不被泥沙淤堵的任務.根據排沙洞的庫運用要求,灌漿帷幕下游排沙洞洞身段為混凝土后張預應力隧洞.通過大的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  17. The research of reservoir design flood is one of basic works in this subject. it is based on the reasons, and the actual conditions of baipenzhu reservoir are combined, the following contents are researched in this paper : 1. according to the actual conditions of baipenzhu reservoir and through the compare of parameters estimation methods, a objective and having fine statistic characteristics p - iii frequency curve distribution parameters estimation method of proximate baipenzhu reservoir is putted

    正是基於這種考慮,本論文結合白盆珠庫的實際情況,本著理論性與實用性相結合的原則,重點研究以下內容: 1 、根據白盆珠庫的實際情況,對各種參數估方法進行比較,提出一種客觀、有良好統特性、適用於白盆珠庫的p ?型分佈參數估方法; 2 、利用實測流資料推求過程; 3 、分析算可能最大( pmf ) ; 4 、對兩種方法算的過程進行調演算,推求庫特徵位。
  18. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低頭,大單寬流,低佛氏數特點的低壩樞紐泄消能開辟了一條新途徑,可供有關低壩樞紐與試驗工作者借鑒與參考
  19. The construction of middle and small - size reservoirs is impact - profound human activities. this paper aims to conduct flood - routing of designed inflow floods of downstream reservoirs under consider ation of existence of upstream middle and small - size reservoirs, quantitatively analyze the degree of impact of the upstream reservoirs " dam - break floods or flood - regulating functions on design inflow floods of the downstream reservoirs

    上游修建多個中小庫就是一種較大規模的人類活動,本文研究旨在考慮上游多個中小庫影響的條件下,對現有的下游入庫過程進行調演算,定分析上游中小庫的蓄泄對下游入庫過程調度的影響程度。
  20. Research on retrieval of gps water vapor and method of rainfall forecast are keen field which draws all attention from wide world. the dissertation is accomplished on the basis of sino - italy collaborative project - ' the integral system of flood risk programming, monitoring and real time forecasting " and the primary achievements and conclusion reached include : ( 1 ) a reasonable design has been made for gps water vapor monitoring network according to the theory of gps satellite signal propagation and vertical distribution of water vapor and local synoptic characteristic of binjiang basin, the effective area where water vapor can be detected by gps station has been determined under different cut - off angles. the conclusion has been reached that 3 ~ 4 gps receivers are enough for water vapor monitoring in binjiang basin

    Gps汽反演和降雨預報研究是當前氣象遙感應用的一個前沿探索領域,本論文依託于中意科技合作項目「風險規劃、監測和實時預報的集成系統」 ,主要成果體現在以下方面: ( 1 )提出了一個合理的gps汽監測網方案根據gps衛星信號傳播原理和汽垂直分佈規律以及流域天氣的地方性特徵,確定了不同高度截角下一個gps站所能測定大氣汽含的有效范圍,得出了濱江流域只需要3 4個gps接收機就足以反映流域汽變化的結論。
分享友人