設計用水量 的英文怎麼說
中文拼音 [shèjìyòngshuǐliáng]
設計用水量
英文
designed duty of water- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 用 : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
- 用水量 : consumption of water
- 用水 : category:drinking water
-
During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer
近三年來主要從事機械行業工廠工程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施工圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計工作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為工廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實施設計工作,得到主管部門和用戶較高評價Considering the electrovalence, the curve of water consumption and the reliability of water supply, this paper respectively sets up the model based on the maximal flux and the model based on the expectation flux. it takes yearly expenditure converting value and yearly cistern converting value as target function and takes continuity equation, velocity of flow and compression resistance of cast iron pipeline as restrictions and sets up the pga model on optimal design of water supply networks
考慮到峰谷電價、用水量變化曲線及用水可靠性因素的影響,分別建立了以最高時流量設計管網的模型和以期望時流量設計管網的模型,以年費用折算值加上清水池年造價折算值為目標函數,以連續性方程、管中流速和鑄鐵管耐壓值等為約束條件,進行并行遺傳演算法對給水管網優化設計的實現。The watermark algovithm can resist the physical transfer of printing and scanning by applying techniques such as fixation normalization mutually which can secure the embedding position, chaotic encipher encryption, multipassage embedding and so on. what ’ s more, the watermark designed in this essay is binary image. it can bear a large amount of information
本文綜合運用了歸一化相關確定嵌入位置、混沌加密、多通道嵌入等技術,使得本文所設計的水印演算法能夠抵抗印刷和掃描的物理轉換過程,同時本文所採用的水印是二值圖像,能夠承載大量的信息。On this base, a more precise volume model of concrete is established and one conception of dry mortar volume is brought forward. at the same time the author absorbed the concept of the best ratio between paste and aggregates and used mathematical method to induce the formulas of water content and ratio between fine aggregate and coarse aggregate in concrete : ratio between fine aggregate and coarse aggregate : if the two formulas are connected with the classical rule of water cementitious materials ratio ( bolmy formula ), the contents of all materials in concrete can be determined completely by calculation and overall calculation proportioning is realized
在此基礎上建立了普遍適用的更精確的混凝土體積模型,提出了「干砂漿體積」概念,同時吸收國外關于最佳漿集比概念,用數學方法推導建立了混凝土用水量和砂率的計算公式:用水量公式:砂率公式:這兩個公式結合傳統的水膠比定則(保羅米公式) ,即可全面定量地確定混凝土的所有組成材料的用量,實現混凝土的全計算配合比設計。Furthermore, on the basis of consultancies, inquiries and evaluations from multiple sources, the model for predicting soil and water loss in dandong - zhuanghe highway construction is developed. moreover, considering the characteristics of the highway, the covering area of the project is divided into three parts such as main body area, soil - fetching area and soil - spoiling area. for these three preventive areas, the perfect precaution measures for preventing and curing the soil and water loss during the road construction in which a number of vegetal cover measures are taken
論文中詳細調查並介紹了項目情況及沿線自然、社會經濟狀況;收集研究了公路建設項目水土流失預測的基本內容和方法,在多方查詢、請教專家及分析研究的基礎上,提出了丹莊高速公路水土流失預測模型,針對項目不同區域進行了水土流失預測和分析,為水土保持措施的設計提供了定量依據;論文根據高速公路項目的特點,將丹東至莊河高速公路項目區分成了主體工程、取土場、棄土場三個水土流失防治區,並在初步設計文件的基礎上,針對三個水土流失防治區進行了較為完善的水土保持防治措施設計;論文在丹東至莊河高速公路水土保持方案設計中大量採用了植被防護措施,為了更有力地指導植被措施的施工,論文中還就植被保持水土的有效性進行了研究探討。The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design
試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩餘量、地下水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯砌型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲襯砌型式,即混凝土板下鋪設聚苯乙烯板和砂礫石換填層結構型式,加以優化設計,用於工程實踐。( 3 ) three methods of water yield - use balance, reversed operation and dispatch chart operation have been introduced for the operation of heiquan reservoir individually. the dynamic inquiry of dispatch of reservoir, and orperation information in figures and data revising in table or figures has been realized
( 3 )為該水庫設計了水量平衡調度、反運用調度、調度圖調度三種興利常規調度模式,並且實現了水庫調度圖和調度資料的動態查詢以及通過圖表聯動修改數據。Then some optimal models of water supply networks are enumerated and some factors which can influence the optimal results are analyzed such as the efficiency of pump station, the temporal value of fund, the curve of water consumption and the coefficient of water supply energy and so on
接著,列舉給水管網優化設計的數學模型,並分析影響目標函數優化結果的各種因素,例如泵站效率、資金時間效率、用水量變化曲線、供水能量變化系數等。2 hydrometeorological studies - return period analysis of extreme rainfall, estimation of probable maximum precipitation, determination of design storms
2水文氣象分析降雨回歸期分析可能最大降水量的估計設計用暴雨模式的訂定。Hydrometeorological studies - - return period analysis of extreme rainfall, estimation of probable maximum precipitation, determination of design storms
水文氣象分析降雨回歸期分析、可能最大降水量的估計、設計用暴雨模式的訂定。For the mixing proportion design of marine engineering high - performance concrete, the strength and durability, as well as raw material performance, water - binder ratio, sand ratio, and water quantity shall be designed synthetically
海工高性能混凝土的配合比設計應充分考慮強度和耐久性,並對原材料的性能、水膠比、砂率、用水量等進行綜合設計。The grade composite, road performance and its mechanism are systemically studied. 1 ) the aggregate grade of ogfc is studied through the volume method base on the analysis of the aggregate grades. then the grade is verified and the relation between the grade and pore rate is studied statistically, the typical grades of ogfc are developed ; 2 ) the reasonable pore rate of ogfc is studied on the basis of the balance of mechanics and function performance ; 3 ) the mineral fiber is added to the ogfc mixes to increase asphalt content, thus the anti - water performance of ogfc mixes are improved ; 4 ) high viscous asphalt fit for the preparation of ogfc is prepared through composite modification by sbs and rubber powder ; 5 ) the mechanics mechanism of ogfc is studied in the paper, it shows : asphalt paste, as well as the coarse aggregate skeleton, is essential to the mechanics of ogfc
在分析各國ogfc級配的基礎上,運用礦料體積法進行ogfc級配設計,用正交實驗對礦料級配進行了優化設計,運用數理統計方法分析礦料級配和孔隙率之間的關系,並回歸出礦料關鍵篩孔通過率與ogfc骨架空隙結構關系的數學方程,進而提出了ogfc的合理級配;通過對不同孔隙率典型級配混合料的性能研究,綜合力學和功能性能,得出了ogfc的合理孔隙率范圍:針對高速公路面層對ogfc力學性能方面的要求,本文從瀝青膠結材料、纖維穩定劑兩方面對ogfc的性能進行改善:通過sbs和橡膠粉復合改性的方法開發出了適合ogfc的高粘度改性瀝青,摻加聚合物纖維,提高ogfc的最佳瀝青用量,進而改善了混合料的高溫性能和抗水損害性能,優化設計出能滿足高速公路路用性能,車轍動穩定度達5000次/ mm以上,動融劈裂強度比90 ,透水系數31ml / s ,並具有防滑降噪功能的開級配瀝青磨耗層( ogfc )混合料。It takes use of pseudo - random technology, dynamic adaptive technology, multi - channel technology, random position embed technology and so no. so the digital watermarking can resist the physical process of printing and scanning. at the same time, the watermark is binary image which includes a great deal of information, such as personal id, secret information, even a piece of map
本文特別針對印刷和掃描給數字圖像帶來的誤差的問題,設計了一種新的水印演算法,綜合運用了偽隨機處理技術、動態自適應技術、不同應用選擇不用頻帶處理技術、隨機位置嵌入技術、多通道嵌入等技術,使得本文所設計的水印演算法能夠抵抗印刷和掃描的物理轉換過程,同時本文所設計的水印是二值圖像,能夠承載大量的信息,例如個人id 、機密信息、商標標識,甚至可以是一幅地圖。In the first part, we compute the site design flood of given design frequency ( 0. 01 %. 0. 1 %. 0. 2 % and 1 % ) using the design flood hydrograph. then we get the design reservoir inflow flood of the same design frequency by the resultant discharge method. according to the computing value we compare the site design flood and design reservoir inflow flood of different time interval
本論文以廣西紅水河龍灘水電站為例,在第一篇中採用洪水過程線法計算了給定設計頻率為0 . 01 、 0 . 1 、 0 . 2和1的壩址設計洪水,並利用合成流量法計算了相應設計頻率的入庫設計洪水。All the method hare been proved in project to improve the accuracy of designimy rolume of fold when they are used in practice they will also improve the accruing of any desighmy river - crossing bridge
上述方法經過工程實際驗證,表明可提高設計洪水流量的精度,在工程中的應用將提高跨河橋梁設計的精度。In the mode using constant rate water pump, pumps are put to run atfull capacity in all operation cycles, with no means for water flow rateregulation attached, incurring significant waste of electric power
高位水箱造價較高,並且需要增加樓房的設計強度,增加了投資成本。恆速泵打水總是滿負荷運轉,不能根據用水量的多少調整泵流量,因此浪費電能。Main contents for studying of the paper is : ( 1 ) analysing the outcome, characteristic and the problem of the hot water supplydesign second flow method in the europe and the usa. ( 2 ) it is determined that value frequenly of different fixture use in the period of using water high peak. ( 3 ) the relation between the n and the hot watersupply design second flow is got by applying program to computer under the different probablity
本課題研究的主要內容為: ( 1 )分析對比歐美主要國家熱水設計秒流量計算方法的結果、特點及存在的問題; ( 2 )根據我國居民生活用熱水特點,由用水量標準推算出各類型水用戶用水高峰期的衛生器具使用概率; ( 3 )編制計算機程序,計算不同使用概率情況下,給水當量與熱水設計秒流量的關系表; ( 4 )建立熱水設計秒流量q _ g和給水當量n與使用概率p之間的相關關系; ( 5 )繪制《建築給水排水設計規范》中有關熱水設計秒流量計算方法的計算用圖表。In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges
本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。Only the flux being decided properly, the design will match the fact well, which met the demand of user and saved the material. this paper analyzed the formulas of calculation of design flow per second and maximum flow per hour used in water supply
而是介於最大日瞬時用水量和最大時平均秒流量之間,只有合理的確定給水流量的大小,才能使得設計與實際情況能比較好的符合,既滿足了小區用戶的實際需求,又節省了管材、設備等的造價。Many experts and designers hold that the design flow provided by the normal formal is a lot of lack, everybody consistently thinks that the probability method is reasonable and viable in calculating the water supply by many expert, scholar, professor ' s research
許多國內專家及設計人員反應我國現行規范公式給出的設計秒流量應用於實際中存在很多不足,通過許多專家、學者、教授的研究,大家一致認為用概率論方法計算給水流量是比較合理及可行的。分享友人