設閘室 的英文怎麼說

中文拼音 [shèzháshì]
設閘室 英文
escape lock
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : anchor gate
  1. Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough

    沿海地區船運發達,很多河道有通航要求,為克服潮汐造成的水位變化而置船。長期以來,由於缺乏對鹽水入侵內河河道產生影響的定量評估,在船運行過程中為防止高鹽度鹹水入侵內河,通常採用將內河淡水打入的方式來調節通航水位,船的這種運行方式不盡合理。
  2. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  3. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞群圍巖穩定的安全可靠性分析:被成都勘測計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河壩及地基的應力應變分析:被成都勘測計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞群圍巖穩定的安全可靠性分析:被中南勘測計研究院應用於初步計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃計院的靠船墩優化計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  4. The pier room being a sophisticated spatial structure system, conventional methods in material mechanics and structure mechanics find difficulty in describing the real burdening situation, which presents embarrassment in designing

    泄水屬於一種復雜的空間結構體系,傳統的材料力學,結構力學方法難以真實的反映其受力狀態,必然給計工作帶來一定的困難。
  5. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船的地理位置和營運現狀,說明了船在航道建和水資源綜合利用中的作用及東溝船改造的必要性;第二章東溝船改造的主要技術因素確定其中包括東溝船貨種和貨運量發展的預測,並確定東溝船計代表船型及營運組織;第三章東溝船改造工程計本章通過船改造工程主要技術參數:船規模、尺度、計水位和高程等的確定,計了二個船改造方案,包括鋼筋混凝土整體塢式首結構、門的計,並選定了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝船改造工程二個計方案進行全面綜合比較后,確定了推薦方案。
  6. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪道墩與堰體底板厚度相當,堰體為低堰且有廊道、堰體建基面「高低腳」及邊墩兼作擋土墻等具體特點,在計中采山口水利樞紐工程溢洪道三維有限元整體應力計算分析用三維有限元整體應力計算方法分析的受力狀態,分析在荷載不對稱。
  7. Mixture mixing : install and debug the mixing equipment before construction, take the trial mix according to the mixture ratio, and find out the turning on location of every hopper strobe as well as the relation among material flow of every kind, draw up the curve, and if there is adjustment because of factors like material batch, difference of moisture content and so on, it need to be confirmed by the laboratory so as to ensure the mixture ratio of construction meet the design requirement

    混合料拌和:施工前首先安裝、調試好拌和備,根據確定的配合比進行試拌,找出各料斗門開啟位置與各種材料流量的關系,並繪製成曲線,如因材料批次、含水量不同等因素而調整,須由試驗確定,以確保施工配合比符合計要求。
  8. At last the corresponding formulae was yielded. 4. the design scheme of jiangtang lake flood - intake sluice was systematically researched, including selecting the sluice location, calculating the height of the sluice soleplate, selecting of the sluice structure and bank wall, and then the reliable proof for determining rational structure scheme was provided

    4從址選擇、底板高程確定、結構和岸墻等方面,對姜唐湖進洪工程的計方案進行了系統的研究,為最終確定較為合理的結構方案提供了可靠依據。
  9. Air shower, a purifying equipment being abing able to clean the surface of human body and articles, preventing the unclean air invade into it. to meet the cleanliness requirement of clean room with the help of air ? conditioning system in the clean

    風淋是一種凈化備,可以清除人身和物品表面附著的塵埃,減少帶入潔凈空氣的灰塵量,同時兼有功能,可防止不清潔空氣侵入,以配合潔凈空調系統確保潔凈達到所需潔凈度。
  10. According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion

    根據福堂電站工程計的結構布置情況、地質參數及滲流計算成果,對和擋水壩穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。
  11. Based on structural design criterion of floodgates, a finite clement method is adopted to analyze and calculate deep - hole gate chamber. and based on space plank analysis theory, area stress is considered in the stress calculation of original laminose problems. the method is simple, convenient and manageable and reaches better precision

    本文在計規范的基礎上針對水的結構計,採用有限元對深孔進行了分析計算,根據空間板的分析理論,在原薄板問題的受力計算基礎上考慮了內力的作用。
  12. According to the conclusions and advices, the methods used in the system were determined

    系統據此採用結構計計算的方法。
分享友人