試井分析 的英文怎麼說

中文拼音 [shìjǐngfēn]
試井分析 英文
well test analysis
  • : 名詞(古代占卜用的器具) astrolabe
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ動詞1. (分開; 散開) divide; separate 2. (分析) analyse; dissect; resolve Ⅱ名詞(姓氏) a surname
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷驗四方面進行了深入討論;本文作者根據多年現場載荷驗的工程實踐,對深驗裝置的核心部? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. By analyzing the production test data, we get the index production equation, bi nomial production, production degression equation and the single well control reserve

    通過該區的資料,得到了指數式產能方程、二項式產能方程及油產能遞減方程,同時計算了單控制可采儲量。
  3. Abnormal well head pressure of high productivity gas wells in luojiazhai

    羅家寨高產能氣口壓力異常
  4. The similar structure of pressure distribution in the homogenous reservoir

    均質油氣藏試井分析解的相似結構
  5. With the research object of overbank soft clay near the yiluo river, by means of pack drain to accelerate the consolidation of the soft ground and analysis of fourteen selected representative observation section, in the same time with the help of such testing apparatus as settlement plates, deflection inclinometer, piezometer, telescoping tube, my study not only evaluate the effect of pack drain ' s quickening up the consolidation of soft ground impersonalily and scientifically but also sum up the settlement disciplination of overbank soft clay after more than one years ? observation of settlement and stability continuously

    本文以伊洛河河灘相軟土為研究對象,利用沉降板、測斜管、孔隙水壓力計、層沉降標等多種測儀器,選取14個有代表性的觀測斷面,進行了一年多的沉降與穩定觀測。通過對觀測數據的,進而對袋裝砂加速河灘相軟土固結效果進行了客觀、科學的評價,同時推算了沉降系數m _ s和固結度參數,並對河灘相軟土的沉降規律進行了
  6. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過驗研究與理論對旋流式豎泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速佈及壁壓強等;二、提出了豎空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用驗與計算結果,對旋流式豎的消能機理進行了探討,對豎各部的消能能力有了總體認識;四、對豎下部消力的合理深進行了優化驗研究,發現消力合理深度為0 . 9d左右;五、通過驗研究,歸納出豎水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保壁壓強保持正壓,但空化數依然較低,因此豎的空化空蝕始終是工程界關注的重大問題。
  7. Through investigating and analyzing cave deposits samples at tuozidong of tangshan, nanjing, combining previous research results and geological history of the tangshan area, we discuss the geochronology, depositional processes and modes of the tuozidong cave deposits, and logically elaborates on its paleoenvironments, geomorphology, paleoclimate and biological evolution at tuozidong

    摘要通過對南京湯山駝子洞洞穴堆積觀察描述和樣品,結合前人研究成果和湯山地區地質地貌演化的歷史,討論了駝子洞堆積的時代、堆積過程和方式,對其蘊含的構造、地貌、氣候和生物進化等古環境信息進行了合理的挖掘。
  8. This article briefly introduces the theory, advantages and main function of crosswell technology, and the developing statues of it. in this article, the author elaborates the operation method of crosswell in block shen95, and detailed analyses the designing of layout, identification of complicated wave field, gained data, field quality control measures and data processing & interpretation method

    本文簡要介紹了間地震技術的原理、優勢、主要作用以及國內外發展概況,闡述了沈95塊間地震驗的施工方法,較詳細地對觀測系統的設計、復雜波場識別、獲得的數據資料、野外質量監控措施以及資料處理、解釋方法進行了
  9. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元程序( lscfea )中的小變形平面固結單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,別得出河灘相軟土地基在考慮砂和未考慮砂作用下的固結沉降曲線及杭甬高速公路驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了,得出各時間段曲線斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的線性回歸關系。
  10. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪驗和常規三軸剪切驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂邊坡室內平面應變驗,了沙漠場浸法施工中就基坑壁的破壞方式,推導出了基坑和樁孔容許開挖深度的計算公式。
  11. Based on corresponding relationship of gaussian curvature to macrofractures in coal seam and permeability, the classification criteria of gaussian curvature method for forecasting natural fracture zones is put forward

    高斯曲率與滲透率、煤層宏觀裂隙的對應關系的基礎上,提出了高斯曲率法的裂隙發育區類標準。
  12. Lithology should be determined by comprehensive analysis and judgment through chemical agents analysis method and microscope amplification description combined with outlook characteristics description, integrated with regional data and comprehensive logging data in the course of cutting logging in southern marine carbonatite

    摘要南方海相碳酸巖巖屑錄應以化學法、顯微鏡放大描述法為主,輔以外觀特徵描述法,結合區域資料、綜合錄資料、綜合、判斷,確定巖性。
  13. Considering the artificial fracture as the refracture upon the horizontal seam, putaohua oilfield is taken as the target and the following tasks have be done : define well and stratum selection method for refracturing ; determine the refracturing time with well test analysis and flow index method ; find out the main cause of refracturing failure

    摘要針對大慶油田長垣人工裂縫為水平縫的重復壓裂,以葡萄花油田為研究對象,初步界定了重復壓裂選選層工藝方法;應用試井分析和流動指數方法判斷重復壓裂時機;經過研究找出了重復壓裂裂縫失效的主要原因。
  14. This thesis predict profitable oil trap under the direction of the theory on searching for oil in faulty - step break, and select classy from them in terms of the style, scale, reservoir factor and shelter of the sedimentary sand - body distributing. take the low stand system of down - shasan formation for example, three favorable targets was put forth through synthesis analysis

    本文在斷階坡折找油理論的指導下,對研究區內的有利圈閉進行了預測,並根據沉積砂體的佈類型、規模、儲層物性以及封堵條件,再結合現有鉆情況,對其進行優選,以沙三下段低水位體系域為例,經過綜合,提出了3個有利的目標。
  15. The 1owing material balance method, a new method for reservoir engineering dynamic analysis, is presented and applied to the well test analysis of heavy oil steam stimulation, calculating the heating radius and formation contaminant factor in this paper

    摘要介紹了一種新的油藏工程動態方法流動物質平衡方法,並將該方法應用於稠油蒸汽吞吐試井分析,計算出加熱半徑和地層污染系數。
  16. The author puts forward using double pore model and two permeability model and triple medium models to represent its infiltrating fluid model and studies partly the infiltrating fluid. ( 2 ) various kind of test well curve form characteristic crevices - cave model on reservoir was studied. the test well curve of carbonate seam cave oil reservoir divides to 7 styles : homogeneity, double - pore, vertical - transmitting, compound, low - seepage, double - seepage and triple medium

    利用動態資料和靜態資料,結合塔河油田碳酸鹽巖儲層特徵,開展典型探試井分析研究,將碳酸鹽巖縫洞型油藏曲線劃為7大類:均質儲層油藏、雙孔介質油藏(包括孔隙?裂縫介質油藏、裂縫?孔隙介質油藏) 、垂直導流型油藏、復合油藏、低滲型油藏、雙滲介質油藏和三重介質油藏。
  17. New well test analysis method of the dense well - pattern

    加密網條件下的試井分析新方法
  18. Application of modern well test analysis in yaha condensate gas field, tarim basin

    現代試井分析在牙哈凝氣田的應用
  19. Draw down well test analysis of gas - condensate well considering the influence of adsorption

    考慮吸附影響的凝壓力降落試井分析
  20. Based on an actual project, tests and analyses the heat exchanging performances of the vertical u - shaped ground heat exchanger, and obtains the heat release in summer and the heat absorption in winter of ground heat exchanger for unit well depth and the optimal drilling depth

    摘要根據工程實際情況,對豎直u形地埋管換熱器的換熱性能進行了現場測,得出了單位深地埋管的夏季散熱量、冬季取熱量及最佳地埋管鉆孔深度。
分享友人