試探鉆孔 的英文怎麼說

中文拼音 [shìtànzhēnkǒng]
試探鉆孔 英文
trial bore hole
  • : 名詞(古代占卜用的器具) astrolabe
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • 試探 : sound out; feel out; probe; explore
  1. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個, 9個土芯, 178個井,重整48個豎管測壓計及一系列的土壤和巖石樣本的實驗室驗。
  2. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個, 250個井,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實驗室驗,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  3. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規取樣驗成果的使用應當慎重,對重要工程宜採用坑、豎井取樣,或採用雙筒薄壁取土技術。
  4. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件樁的單樁豎向靜載荷驗資料,分析了各驗樁特別是常規沖灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,討了在昔格達泥巖層中的沖灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  5. Based on the results of vertical static loading test and stress test for longhole bored pile in loess foundation, by analysing the transferring law of axial force and the action of lateral friction resistance and bottom resistance, the paper discusses the influences of two types of holing technology on bearing capacity behavior

    本文通過黃土地基中旋挖灌注長樁和泥漿護壁灌注長樁靜載荷驗和樁身應力的測,分析了黃土地基中兩種成工藝灌注長樁樁身軸力的傳遞規律、樁側阻力及樁端阻力的發揮性狀,討了兩種成工藝對灌注長樁承載力的影響。
  6. Subsoil - field testing - part 2 : borehole dynamic probing

    心土.現場測.第2部分:動態
  7. Someone think it must use permeating theory to design, the others think it must use permeating theory to design. the building ministry made out the working standard of the later pressure grouting of pour pile, but it stand at the industry standard, is n ' t enough perfect and comprehensive. in this paper, the author put forward the design principle by analyzing the reasons that affect the bear load ability of the drilling hole pour pile and the principle that improve the bear load ability of single pile by later pressure grouting, put forward th e working technology and requirement of check before acceptance by analyzing and summarizing several models such as the chinese railway 11 office residential high building

    本文通過分析影響灌注樁承載力的因素以及灌注樁后壓漿提高單樁承載力的機理提出了設計計算的原則;通過中鐵十一局高層住宅樓灌注樁低壓力后壓漿工程對6根樁的壓漿對比驗及揭露確定了低壓力后壓漿所適用設計理論和方法;確定了低壓力后壓漿的壓漿壓力、壓漿量等參數;經過實驗及經驗總結確定了壓漿材料的選取原則及方法,列出了低壓力后壓漿在不同土層適用的壓漿材料。
  8. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場驗、力學數值分析和有限單元分析,對巖溶地段灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面作一些討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  9. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工驗及力學、有限元分析,對巖溶地區灌注樁的施工工藝、荷載傳遞機理、持力層厚度及嵌巖深度等方面做一些討性研究。
  10. Exploitation on pressure detective method for coal gas by prospect drilling

    煤層瓦斯壓力測方法
  11. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內驗及原位測指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷驗或少做靜載荷驗的情況下通過剪切波速和靜力觸驗指標以及施工工藝修正系數等預測黃土地基中灌注樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  12. In this paper, depending on the enormous 356 pile testing date detailed with soil and pile parameters and p ~ s curves, covering xi ' an and adjacent areas, we analyzed the load transmission mechanism of pile in loess foundation, and proposed a kind of hyperbolic load transmission function between pile and it ' s neighboring soil. meanwhile, we created a mathematical model to predict p ~ s curve and bearing capacity of single pile. by analyzing the compacting effect caused by pile - sinking of pressed pile in loess and it ' s influence on bearing capacity and settlement, two parameters, kc and ke are introduced to modify the soil cohesive c and deformation modulus es

    本文利用現己收集到的西安及其周邊地區356根打入樁、靜壓樁、灌注樁的現場樁資料(其中打入樁67根,靜壓樁121根,灌注樁168根,並有詳細的地層勘資料,樁深資料,荷載沉降?曲線)對西安黃土地基中的打入樁、靜壓樁、灌注樁的荷載傳遞機理進行了分析研究,認為用雙曲線型的荷載傳遞函數模擬樁土之間的荷載傳遞函數是合適的,並用荷載傳遞分析的方法建立了計算p s曲線的數學模型及極限承載力的確定方法。
  13. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場驗、理論計算和有限單元分析,對巖溶地區灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  14. In section five, in accordance with the drill prospecting, the paper applies the developed rayleigh wave method to detecting the ground of the navy scientific experiment building, the result is also very well. all of these prove the applicability of rayleigh waves method in engineering field and the feasibility of ultrasonic ct method to detect the weathering degrees of stone relics

    第五部分把改善後的瑞雷波勘方法結合應用於海軍科研驗樓工程勘察中,效果較好,進一步證實瑞雷波勘方法在工程領域的適用性,同時也說明了超聲層析方法應用的可行性。