試注水 的英文怎麼說
中文拼音 [shìzhùshuǐ]
試注水
英文
pilot flooding-
Experimentations have indicated that the method saved affusion work and approached actual project ' s requirement
試驗表明,此法節省注水試驗工程量,接近實際工程要求。I am shipping and marine project major there are a few problems to did not figure out in study recently the hand that hopes professional personage can extend aid 1, in hydraulic experiment, the cabin of photograph adjacent why cannot at the same time affusion
我是船舶與海洋工程專業的最近在學習中有幾個問題沒有弄明白希望專業人士能夠伸出援助之手1 ,水壓試驗中,相鄰的船艙為什麼不能同時注水Test of grouting and water injecting technology and its application to extinguishing spontaneous combustion of oil shale foundation soil
灌漿注水處理油母頁巖矸石地基自燃的試驗與應用The basic procedure of an interwell radiotracer test is, to inject a proper radioisotope tagged tracer material into the injector together with the injected fluid ; the tracer material will follow the injected fluid and go through the same path of injection fluid penetrating the formation ; finally the tracer material will be produced at the producer ; then, collecting samples at well head of producer, tracer response can be observed ; by analyzing the response of tracer, the information on dynamics of injection fluid and reservoir geology can be obtained
放射性井間示蹤測試的基本過程是:將一定量合適的放射性示蹤劑介入注入流體,使其通過注入井進入地層並跟隨注入流體穿越地層,最後被採油井采出;通過跟蹤監測示蹤劑在採油井上的響應,獲得注水井-採油井之間流體和地層的信息。Infusion test in coal seam and its effect analysis
煤層注水試驗及效果分析Specification for injection test
注水試驗規程The peak production can be reached at the 4th to the 7th months after water injection, and the production would decrease after the 8th month
先導性注水試驗表明,注水開發可以使青平川油田產量在較短時間內得到大幅度提高,在注水后的第4到第7個月達到產量高峰期,第8個月後進入穩產期。Recommended practice for performance testing of cementing float equipment
注水泥浮標設備性能試驗的推薦規程In this paper, technology for water injection by long bore hole in fully mechanized mining face was studied, relevant experience and some parameter were acquired, which provide a reference for using this method in similar faces
以鄭州礦區典型的「三軟」煤層綜放工作面為對象,試驗研究了長鉆孔注水防塵技術,取得了「三軟」煤層長鉆孔注水經驗和參數,為鄭州礦區類似條件的工作面推廣該方法提供了參考。Abstract : in this paper, technology for water injection by long bore hole in fully mechanized mining face was studied, relevant experience and some parameter were acquired, which provide a reference for using this method in similar faces
文摘:以鄭州礦區典型的「三軟」煤層綜放工作面為對象,試驗研究了長鉆孔注水防塵技術,取得了「三軟」煤層長鉆孔注水經驗和參數,為鄭州礦區類似條件的工作面推廣該方法提供了參考。Install sight tube in test cock 4 and fill with water as before
在測試旋塞4號安裝觀察管,並如前所述注水。Based on a thorough investigation of the engineering geological condition for the reservoir region of the huizhou pumped storage power station, the in - situ trial pit water injection test, boring water injection test, and water pressure test were performed to study the permeability of rock and soil mass
摘要在對惠州抽水蓄能電站庫區工程地質條件進行詳細調查的基礎上,採用現場試坑注水和鉆孔注水、壓水試驗等方法了解巖土體的透水性。Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation
文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝作業的主要井下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。This article takes hanging off and wide fluctuation of transmition velocity of adsl as example, then analysis centers on the discerte multiple tone and the principle of channel load assignation. from analysis above article points out the root of adsl being sensible of noise signal. at last, reserches effects that window function and barrier effect on frequency and adopts fft to work out the noise power of adsl
本文以電信現在推出的adsl傳輸中鏈路經常掉線和傳輸速率經常大范圍波動為例,重點分析了adsl所使用的dmt調制方式和注水演算法分配通道載荷方式原理,由此指出adsl對噪聲信號敏感的根源,在得到問題的根源之後,分析了窗函數和柵欄效應對頻譜的影響,採用fft方法計算adsl線路的噪聲功率譜,為adsl線路測試提供了可靠的理論依據。Apply ann ( artificial neural network ) in optimizing control system based on the optimized water flooding equipment ; test the control system using the industrial data
以注水機組優化為系統優化的基礎,將神經網路引入優化控制系統,利用工業現場記錄的歷史數據進行了測試,取得了令人滿意的效果。On the basis of integral study of core data, testing and geology in es3 of huzhuangji oilfield both before and afater water injection, the major factors inducing reservoir changes are analyzed in the area after water injection, a model is established for interpreting physical properties of the reservoir, by which the study of reservoir heterogeneity turns to dynamic development from static one, by which basis is laid down for precision study of remaining oil distribution at the high water - cut stage
在綜合研究胡狀集油田沙三段注水前後巖心、測試、地質等資料的基礎上,分析該區儲層注水后容易變化的主客觀因素,建立儲層物性解釋模型,使儲層的非均質研究由靜態向動態方向發展,為精細研究高含水期剩餘油分佈規律奠定基礎。Method for efficiency testing and unit energy consumption calculation of oilfield water - injection surface system
油田注水地面系統效率測試和單耗計算方法Leng 43 block was developed in 1993 and since then conventional fracturing conduction, water flooding test, steam soaking were successively carried out, but exposing several inconsistencies such as high decline rate of output, water flooding fingering, low potential of steam soaking etc. among them the physical properties is an important factor that affecting the result of development
該塊從1993年投入開發以來,先後進行過先期壓裂常規開采、注水開發試驗、蒸汽吞吐開采,但是暴露出常規開采產量遞減快、水驅指進、蒸汽吞吐潛力小等矛盾,其中儲層特徵是影響其開發效果的一個主要因素。In the multiple - layered test for injection wells, a lot of pressure falloff curves in the single layers are hard to show a radial flow straight line due to the perturbative phenomena of multilayer reservoir, low permeability or short test time
摘要在注水井分層測試中,由於油藏的低滲透性或者測試時間相對較短等原因,各層的壓力恢復曲線難以出現徑向流直線段。Analysis on trial results of water infusion technique by adding penetration stick in taoyuan coal mine
添加滲透棒注水技術在桃園煤礦的試驗效果分析分享友人