試車期間 的英文怎麼說

中文拼音 [shìjiān]
試車期間 英文
running in
  • : 名詞(古代占卜用的器具) astrolabe
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 試車 : [機械工程] test run; trial run
  • 期間 : time; period; course; duration; term
  1. 2. you should attend the scheduled appointment at the driving services section, 19 pui ching road, homantin, kowloon for a simulator test to determine your fitness to drive

    請你于指定日及時前往九何文田培正道19號運輸署駕駛事務組接受模擬駕駛測,藉以確定你是否適合駕駛輛;
  2. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪站大跨度地下空dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空支護結構的參數選擇、地下空的開挖方法、支護體結構的應力量測方法及測手段;分析了支護體初支護工字鋼拱應力、錨桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  3. Made some test cars during 1964 - 196, and carried on the test

    在19641967年製造了一些驗臺架,並進行了驗。
  4. In the period of performance test, operation and maintenance of the contract equipment the seller ' s technical personnel shall explain in detail the technical documentation, give necessary demonstrations and answer technical questions raised by the buyer

    在合同,運行和維護,賣方技術人員應詳細解釋技術文件,進行必要的示範並對買方提出的技術問題進行解答。
  5. Passengers who travel or intend to travel to lo wu using octopus when the quota system is in operation shall obtain the proper authorization for travel to lo wu from the ticket office before entering or attempting to enter the paid area and shall not travel unless such prior authorization is obtained

    當羅湖配額管制實施:乘客以或欲以八達通乘列前往羅湖,而當時正實施配額制,必須獲得售票處票務處發出的羅湖核準才可進入或嘗進入已付費區域,而且除非獲得此預先羅湖核準,否則不可乘搭列
  6. Dry cycle time

    空料
  7. Some automobile manufacturers have already announced their plans to introduce some high technology devices such as abs ( anti - lock braking system ), asr ( acceleration slip regulation ) and vdsc ( vehicle dynamics stability control ) on all their models, which are developed to improve vehicle - handling stability under different emergency situations by the fundamental principle that adhesion coefficient between tire and road varies as wheel ' s slip

    而基於汽輪胎與路面之的附著性能隨輪滑動率改變而變化的機理所開發的、旨在改善輛在不同工況下操縱性穩定性的一些高技術系統包括防抱制動( abs ) 、防滑驅動( asr )及輛動力學穩定性控制( vdsc )系統,更是受到汽製造商的青睞和厚愛,都在積極地加緊制,以更快更早地佔領市場。
  8. The test runs will be kept to an absolute minimum

    每次試車期間,列只會上下行各二次。
  9. The test runs will only involve about six trips in both up and down directions

    試車期間,列只會上下行各六次。
  10. The test runs will only involve about four and five trips in both up and down directions

    試車期間,列只會上下行各四至五次。
  11. The test runs will only involve about four to five trips in both up and down directions each night

    試車期間,列只會上下行各四至五次。
  12. The test runs in each early morning will only involve about four and five trips in both up and down directions

    每次試車期間,列只會上下行各四至五次。
  13. If there is no race & rent out on fri 、 sat & sun, the track will be opened for paid practice

    如賽場無賽事及出租,星五、六、日亦招待以上
  14. Easy use counts as it s second advantage : preparation time before every flying is 10 - 30 minutes including inflating, fuel filling, advertising strips hung, remote controller adjustment, it can be fixed to a stool during flying time, stored at warehouse, carpot or big house with big door at night, very convenient and shortcut

    使用簡便是它的第二大優點:遙控飛艇每次飛行前的準備工作為10至30分鐘包括充氣加油掛廣告條幅遙控設備,飛行可用繩索固定於凳子上,多日飛行晚可存放在倉庫庫或有大開門的大房內,非常的方便快捷。
  15. The t - 34 was developed during the 1936 - 37 period, the prototype was completed in early 1939, and in september 1940 t - 34 was put into series production mounting a 76mm gun

    T - 34於1936 - 37年被研製出來,原型在1939年製造出來,並且在1940年9月裝了第一門76毫米炮。
  16. We have noted the problems encountered during the trial operation of west rail and asked for detailed reports from kcrc on the causes of the problems and rectification measures

    我們已得悉西鐵列遇到的問題,並已要求九鐵提交詳細的報告,交代問題的原因及解決方法。
  17. Over this period, non passenger trains run in both directions between hung hom and lo wu stations during non - peak hours. two trains also run two nights every week after the close of operations. notices will be posted in stations to inform passengers of the test runs

    的列將不接載乘客,于非繁忙時在紅?至羅湖站之行走;此外,測,于每星的兩個晚上收后,會有兩列列來回行走各站進行測,以確保日常的服務不受影響。
  18. East rail is now carrying out test runs until mid december 2002 to make certain its trains will run smoothly under the new ato system. over this period, non passenger trains run in both directions between hung hom and lo wu stations during non - peak hours. two trains also run two nights every week after the close of operations

    的列將不接載乘客,于非繁忙時在紅?至羅湖站之行走;此外,測,于每星的兩個晚上收后,會有兩列列來回行走各站進行測,以確保日常的服務不受影響。
  19. In the jerez test prior to france ferrari tried out numerous developments for forthcoming races, but only a few were adopted for magny - cours

    法國站前在赫雷斯的測,法拉利隊為接下來的賽事嘗了許多新的發展,但是其中只有少部份會在梅尼格斯使用。
分享友人