試鉆 的英文怎麼說

中文拼音 [shìzhēn]
試鉆 英文
test drilling
  • : 名詞(古代占卜用的器具) astrolabe
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  1. The local directional drilling is just staring in terrane, the equipments and the technologies ca n ' t satisfy far and far the spot construction needs, according to current circumstance and considing the existed equipments, the author put forward drilling by air hammer in terrane, having designed compounded - drilling tools, and recommended technology parameters. producing experiments have obtained good achievements in economic and in techniques

    國內定向進鋪管技術在巖層只是剛剛起步,設備、工藝遠遠不能滿足現場施工需要,本文針對國內、外巖層定向進非開挖設備及工藝現狀,結合國內大多施工單位的已有設備,提出巖層空氣潛孔錘導向進工法,設計了適合巖層進的實用具,並提出具有針對性的工藝參數,生產性驗取得了良好的經濟技術指標。
  2. Testing method for the performance of full screw earth auger

    長螺旋孔機性能驗方法
  3. Under the guidance of theories of sedimentology, petroleum geology and sequence stratigraphy, and through the comprehensive analysis of outcropsrock, cores, well logs and testing outcomes of rock gas, this paper studies the depositional systems of neopaleozoic and the character of aeration zone in tabamiao area of ordos basin. the result indicates that the object layers are divided into two depositional systems, the barrier seacoast depositional systems are recognized on upper carboniferous taiyuan phase with tidal flat, lagoon and barrier bar sedimentary deposit

    本文根據沉積學、石油地質學和層序地層學理論,綜合利用地表露頭、井巖芯、測井曲線資料和氣成果資料,對鄂爾多斯盆地塔巴廟區塊晚古生代沉積體系及含氣層特徵進行了研究。結果表明,研究區內目的層段可以劃分為2個沉積體系: ( 1 )上石炭統太原期為有障壁海岸沉積體系,發育潮坪?瀉湖?障壁砂壩沉積。
  4. Increasingly complicated the need of the well drill and petroleum extraction busywork, the development direction of the drill and petroleum extraction tools is consummater capability, complexer configuration and high - effect working. the development of the drill and petroleum extraction tools bring forward higher request for research tester and experiment means at the same time

    為適應日益復雜的石油采作業的需求,采工具正向著性能完善、結構復雜、施工高效的方向發展,並對工具研製中的驗裝置和驗手段提出更高的要求。
  5. On the basis of having refered larg number of abroad test - well data and having investigated same local test - well, this dissertation have designed the drill and petroleum extraction tools test - well whole scheme to fit the well drill and petroleum extraction busywork characteristic and the demand of technique store for the dagang oil - field

    本文是在進行了大量的國外驗井資料查閱及國內驗井調研的基礎上,根據大港油田采作業的特點和技術儲備的要求進行了采工具驗井總體方案的設計。
  6. The drill and petroleum extraction tools test - well is made up of the multifunction test - machine system ( hydraulic system ), the calefaction system the circulation system, the testing system and the assistant system

    采工具驗井共由多功能驗機系統(液壓系統) 、加熱系統、循環系統、測系統和輔助系統組成。
  7. Loading test kentledge for pre - bored h - pile tab construction from landside towards sea

    孔h -型鋼樁壓樁測中的負重
  8. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個孔, 9個土芯孔, 178個探井,重整48個豎管測壓計及一系列的土壤和巖石樣本的實驗室驗。
  9. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個孔, 250個探井,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實驗室驗,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  10. Radial drilling machines - testing of the accuracy

    搖臂床.精度測
  11. Acceptance conditions for radial drilling machines with arm adjustable in height. testing of accuracy

    搖臂高度可調節的搖臂床的驗收條件.精確度
  12. Meixing electronics factory is major in the vacuum tube stereo power amplifier, which is located in the nanhai city , owned a workhouse over 1300 square meter, with five plant, they are box, seal and transformer circling 、 debugging & check, we also have the machine process, such as milling machine 、 punch 、 drill press 、 electric welding 、 matrix 、 incision machine, and radio tube test machine. we have realize the product line manufacture, the monthly whole output is over 200 sets

    美星電子是一個專業製造真空管身歷聲功率放大器的加工廠,位於廣東南海市黃岐工業區,擁有廠房一千三百平方米,工廠分機箱加工、焊接組裝、變壓器繞制、煲機老化、調檢測五個車間,機械加工設備擁有銑床、沖床、創床、床、電焊、模具製作、切割等二十多臺,電子管及整機檢測調儀器十餘臺,該廠實現了配套設備、流水作業,每月可生產膽機二百臺以上,可謂中國專業生產膽機最大規模的工廠。
  13. Modeling experiments and studies on retractable flanging device for shaftwalls

    井井壁可縮性接頭模型驗研究
  14. This article is directed by the conformation - geology, petroleum - geology, formality stratum, logging and sedimental theory. it uses many research methods such as geology digging, logging and production data to evaluate the huan - 23 oil trap of the west sag in liaohe. it also researched the formation, sediment, production - zone of huan - 23. it provides the well - location after the comprehensive trap evaluation

    本文以構造地質學、石油地質學、層序地層學、測井地質學、沉積學等理論為指導,綜合地質、井、測井、地震及油、采等資料,採用多學科、多種技術相結合的綜合研究方法對遼河西部凹陷歡喜嶺油田歡23井區進行了圈閉綜合評價;詳細研究了歡23井區杜家臺油層構造、沉積、儲層及圈閉特徵,在圈閉綜合評價基礎上提出了井位部署建議。
  15. Lab. and field test of hunan sepiolite drilling mud

    湖南永和海泡石的石油井泥漿
  16. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測工作;驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  17. The first sample of ore from the trial boring is very promising, but we should remember that one swallow doesn ' t make a summer

    試鉆的第一決礦石樣品來看那是很有開采價值的,不過我們應該記住不可光憑偶然現象就下斷語。
  18. What exam of grade of numerical control machine wants to see you learn is which kind of machine, numerical control machine includes numerical control car specificly, mill, auger, grind, machining center is waited a moment, you need study machine of the system to add knowledge, be familiar with a machine tool, return practice of the machine on need, the most important is the person guidance that need knows, self - study is very difficult, the knowledge on book needs to combine practice a little, the proposal has gone ability school learns a few the basiccest knowledge ( 2 to 3 years ), there can be relevant grade letter after ability school graduates next ( from primary labour, intermediate class, senior worker worker, technician, senior technician, hind two kinds obtain the hardest, want knowledge not only even relevant experience, its wage scale is equal at the engineer, chief engineer one kind ) remain be about to rely on oneself to get

    數控機等級考要看你學的是哪一類機器,數控機器具體的包括數控車,銑,,磨,加工中心等等,你需要系統的學習機加知識,熟悉機床,還需要上機實踐,最重要的是需要懂的人指導,自學很難,書本上的知識有些是需要結合實踐的,建議去好一點技校學習一些最基本的知識( 2到3年) ,然後技校畢業后會有相關的等級證書(從初級工,中級工,高級工,技師,高級技師,后兩種最難取得,不僅要知識還要相關經驗,其待遇級別等同於工程師,總工程師一類)剩下的就要靠自己了。
  19. Even if the underground electricity cable seems to be disconnected and abandoned, do not attempt to drill or cut into it, or to dismantle it until approval has been given by the electricity supplier

    即使地下電纜看來已經截斷供電及已被廢棄,在未獲得供電商的批準之前,不得嘗試鉆穿、切開或拆開地下電纜。
  20. The working stress of the rc compression member in existing structures can be calculated through measuring strain change before and after drilling the hole, determining the compressive strength and elastic modulus of concrete through the drilled sample and combining the calculating results of the finite element method

    該方法通過測試鉆孔前後孔邊應變的變化,利用取的芯樣推定混凝土的抗壓強度和彈性模量,再結合有限元計算分析,得到已建結構中鋼筋混凝土受壓構件的工作應力。
分享友人