試驗樁 的英文怎麼說

中文拼音 [shìyànzhuāng]
試驗樁 英文
test pile
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 試驗 : trial; experiment; test
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用基設計規范中的難點? ?端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷四方面進行了深入討論;本文作者根據多年現場載荷的工程實踐,對深井荷裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注豎向承載力確定存在的問題,進行了5根的靜載荷,分析了區域地質條件下土的物理、力學性質的變化對橋梁基承載力的影響程度;地下水對承載力的影響程度;各種外部因素影響下,的施工工藝對承載力的影響程度;通過在體周圍土中注漿對承載力的影響程度。
  3. This paper describes the principle and method for testing pile bottom force - hearing layer and pile body force - bearing declivity, deals with results of standard component test and inclined model pile test under the condition of inclination, and also gives some practical examples of engineeing application

    摘要闡述了底持力層與身傾斜度測原理及方法,列舉了傾斜情況下的標準件及傾斜模型結果與工程應用實例。
  4. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速、十字板剪切、旁壓等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省基工程費用近5000萬元。
  5. First, the generalized elastic theory is employed into in single pile analysis. the degeneration solution is accordant with poulos " results. analyzing the load - displacement behavior of the battered pile, the results agree well with meyerhof ' s model experiments and zhanglm ' s centrifuge experiments

    對于直,退化為彈性理論的計算結果同poulos的結果一致,退化為荷載傳遞法與他人的結果基本吻合;然後研究了斜的荷載-變形特性,把公式用於計算meyerhof的模型以及zhanglm的離心機的荷載-位移關系,發現同結果吻合較好。
  6. The modified pdr method is used to design a practical projects. although the calculated average displacement of the building is less than the actual measurement. it is acceptable

    對某工程實例進行了現場,測了基底壓力和頂反力,並對該工程作了沉降觀測。
  7. Nowadays, the ways to detect the piles are various, and all of them are limited in some aspects. for instance, coring test do large scathe on the piles, and static load test will waste much time, money and energy, while some ways are hard to operate as the limitation of the length and the diameter of the piles, and the special condition on the spots, such as high - strain, low - strain, and so on. furthermore, the result can only be gained under the complex analysis of the collected wave, and under the validation of the coring test

    目前,工程中常用的基檢測方法很多,但都存在著一些弊端:有的對破壞性嚴重,例如抽芯檢測;有的耗時、耗財、耗力,例如靜載荷;還有的如低應變、高應變等檢測技術由於受到長、徑以及現場一些特殊情況的限制,操作很不方便,而且採集到的波形要經過比較復雜的處理分析方能得出結論,而這個結論卻還要輔助取芯手段加以證。
  8. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次施工工藝的檢測和身質量及承載力的檢,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基承載實表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測工作;數據表明側摩阻和支盤端阻起很重要的作用,端阻力所佔比例甚少。這與設計基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  9. The test research of pile foundation on nanjing underground railway

    南京地鐵研究
  10. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    本文首先對支盤的基本原理進行了闡述,對其施工過程以及成型過程進行了描述;然後對本次抗拔支盤現場進行了介紹,包括現場地質水文條件,目的、方案、設備以及過程,並對注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了身軸力傳遞規律以及支盤阻力和側摩阻力的荷載傳遞規律,並與普通抗拔進行了相關對比;最後,本文提出了本次尚未解決的一些問題,並對支盤的前景進行了展望。
  11. Experimental research in model dz60ks vibratory pile

    型振動錘的研究及改進措施
  12. On the basis of predecessor work, the thesis developed fem program of the pile under lateral load, which is based on winker ground model, and m method is introduced into fem program. the calculation values is closed to the results of field and laboratory model experiment, the finite elment method is verified

    在前人所做工作的基礎上編制了基於文克爾地基模型的有限元計算程序,將水平承載的「 m法」引入計算程序中,並用現場資料和本文的模型結果與數值計算結果進行了對比,結果表明較為吻合,證了程序分析pcc水平承載的正確性和可靠性。
  13. In this thesis, the technological way that prevent the anchorage pile and the concrete of anti - force beam from crazing, and the technological application of ultrasonic determine apparatus to detecting are introduced during engineering of trial pile by inducting prestressed technology to anchorage pile and anti - force frame

    論文還介紹了在試驗樁工程中,通過預應力技術引入錨及反力梁系統,防止錨和反力梁混凝土開裂的技術途徑,和超聲波側壁測定儀檢測技術的應用。
  14. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根身內埋設量測元件的單豎向靜載荷資料,分析了各試驗樁特別是常規沖孔灌注嵌巖在昔格達泥巖中的軸向力、側摩阻和端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注后注漿技術研究成果的基礎上,結合現場研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經,並為今後在該地層中合理選用型以及指導施工提供了依據。
  15. Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge, the construction process of deep cast - in - place pile under pebble geological structure, the limit load - bearing capacity of single pile, side friction stress and head drag are researched in this thesis deeply

    論文結合湖北省荊州長江公路大橋的試驗樁工程,深入研究了江漢平原地區卵石地基深鉆孔灌注的施工工藝、單極限承載能力、側摩阻力和端阻力。
  16. Set the lmrp on the test stump

    將隔水管下部插入總成放到試驗樁上。
  17. Test the bop stack on the stump

    試驗樁防噴器組。
  18. Set the bop stack on the stump and close the hydraulic connector, and then secure it

    將防噴器組吊坐到甲板試驗樁上、關液壓爪形連接器,並固定。
  19. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載進行了分析和研究,利用土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的身率定,對三組不同種類、不同施工工藝、不同持力層中的的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和身變位、撓曲變化規律,最終提供場地土層和的承載特性,為該工程合理設計型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  20. Abstract : the results of hi - lo strain - gauge test on 9 dead - load testing piles are analyzed. the bearing strength of single piles is evaluated preliminarily by using high strain and low strain process and conditions for correlating dynamic and dead loads and technical factors affecting the test accuracy are discussed

    文摘:通過對一組靜載試驗樁高低應變動測結果的分析,對高應變法、低應變法檢測單承載力的可靠性作出了初步評價,並對動靜對比成立的條件及影響其測準確性的一些技術因素進行了探討。
分享友人