試驗發電機組 的英文怎麼說
中文拼音 [shìyànfādiànjīzǔ]
試驗發電機組
英文
testing generator set- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 發 : 名詞(頭發) hair
- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 機 : machineengine
- 組 : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
- 試驗 : trial; experiment; test
-
Acceptance tests for combined - cycle power plants
聯合循環發電機組驗收試驗Efficiency test study on unit 2 of gongzui hydropower station by ultrasonic method
水輪機發電機組超聲波法效率試驗研究Pss parameters setting and field test on tubular turbine unit
發電機組的電力系統穩定器參數整定試驗Reciprocating internal combustion engine driven alternating current generating sets - part 6 : test methods
往復式內燃機交流發電機組.第6部分:試驗方法Reciprocating internal combustion engine driven alternating current generating sets. part 6 : test methods
往復式內燃機驅動的交流發電機組第6部分:試驗方法In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value
第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式水輪機的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算出ms的軸向水推力與模型試驗值大小相當;同時論證了對于下機架承重的混流式水輪發電機組可採用其推力軸承負荷作為水電站廠房振動的最大垂直激振荷載。Staru - up test code for hydraulic - turbine and generator units
水輪發電機組啟動試驗規程Start - up test code for bulb turbine and generator units
燈泡貫流式水輪發電機組啟動試驗規程Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value
本文對國內外眾多水電機組增容改造資料進行了認真研究和實地考察;通過對水力發電機組增容改造技術的研究,結合葛洲壩電站實際情況提出了葛洲壩電站機組增容改造的基本途徑;針對葛洲壩電站機組改造方案,進行了大量的試驗,認真分析了試驗數據,用試驗結果充分證明了葛洲壩電站機組增容改造的必要性和可行性;本文還就該工程項目管理的必要性、組織結構、管理方法進行了闡述,並對該項目進行了項目評估。Off - grid wind turbine generator system part 2 : test method
離網型風力發電機組第2部分:試驗方法Gearbox of off - grid wind turbine generator system part 2 : test method
離網型風力發電機組用齒輪箱.第2部分:試驗方法Off - grid wind turbine generator system part 3 : wind tunnel test methods
離網型風力發電機組第3部分:風洞試驗方法Controller of off - grid wind turbine generator system part 2 : test method
離網型風力發電機組用控制器.第2部分:試驗方法Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。This dissertation is on the basis of iran steam and developing project for 12 units in five power plants. this project is epc project ( i. e. engineering, procurement, construction ) and includes the finance and local manufacture. the value of this project is huge and the works related to this project are very complicate
本案例基於伊朗蒸汽發電機組項目,該項目是對5個電廠的12臺機組的系統設計、土建、設備采購、設備組裝、設備試車、現場驗收和買方人員培訓等工作,即epc (工程、采購、土建) ;該項目還涉及到項目融資和地方製造。The test results showed, that the test method accorded with the requests in engineering tests, that bearing vertical and horizontal loads can be tested in real - time
試驗結果表明:該方法滿足工程測試要求,能實時測試各支承負荷及其變化,可運用於現場進行汽輪發電機組軸承負荷在線監測。Analysis on vibration of turbine generator unit and test on dynamic balance of rotor
水輪發電機組振動分析及轉子動平衡試驗The testing hall is equipped with 1, 800kv impulse voltage generator, 2, 000 4, 000kw 50 100hz frequency conversion generator group and 30, 000kvar capicitor compensation device and so on
試驗大廳安裝有2400kv沖擊電壓發生器2000 4000kw 50 100hz變頻發電機組及30000kvar電容補償裝置等。Msts ( multifunctional supervision & testing system for generator ) has such advantages as multi - path acquisition, high computing speed, high - precision testing and suitability for on - site operation, it completely meets the needs of start - up and hand - over tests of newly installed units and electrical tests prior to release of power generation sets after overhaul
本課題發電機綜合監測試驗系統msts ( multifunctionalsupervision & testingsystemforgenerator )的開發研製完全符合目前的急需,它具有採集通道多、計算速度快、測試精度高以及適合現場使用等優點,完全滿足發電機組整套啟動交接試驗和機組大修投產前電氣試驗的需求。分享友人