試驗臺裝置 的英文怎麼說

中文拼音 [shìyàntáizhuāngzhì]
試驗臺裝置 英文
test bed plant
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 試驗 : trial; experiment; test
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. To eliminate the errors, the parallel double - sensor scheme which can eliminate the influence of the tooth space error of the measurement tooth - wheel and the contraposition double - sensor scheme which can reduce the influence of the installing eccentric error of the measurement tooth - wheel are demonstrated in detail and realized in this paper

    為消除這些誤差,詳細論證並實現了用並聯式雙傳感器方案消除測量齒盤分齒誤差的影響和用對式雙傳感器方案消減測量齒盤安偏心誤差的影響。構建了證了誤差研究和雙傳感器方案的正確性。
  2. According to the current report, never before was there the related testing system of vehicle braking ability with abs, or the patent of that therefore, the multi function testing system of combining the brake testing, vehicle axle weighing, speed meter testing and abs testing has much superiority and will supply a gap of abs testing in our country and it will help to promote the development of our country ' s inspecting techniques and instruments

    初步調查表明,國內尚未見到有關檢測abs汽車制動性能的技術設備及專利。所以本文研製的軸重、反力式制動、速度表和abs多功能及計算機測分析系統,不但具有多種優越性,而且還將填補我國在abs制動性能檢測方面的空白,對于推動我國檢測技術及設備的發展將具有十分重要的意義。
  3. According to the working principle of closed cycle diesel engine, the whole solution including charge intake system, seawater management system and monitoring system was put forward in this paper. test - bed of closed cycle diesel engine was established based on a conventional diesel engine with its type 4102bg

    針對本文的主要工作,提出了閉式循環柴油機進氣控制系統和監測系統的具體實施方法,並以4102bg型非增壓柴油機為主機,完成了閉式循環柴油機架建設。
  4. The influence factors of compressed air dryer ware analyzed. experiment system of compressed air dryer was built up. method of calculation and corredion was put forward

    摘要分析了影響壓縮空氣乾燥設備性能的因素,建立了壓縮空氣乾燥設備試驗臺裝置系統,提出了計算和修正結果的方法。
  5. The testing unit was used on experimental research of working performance and structural parameter of axial flow threshing and separating installation, scientific research and instructional system etc

    可進行軸流脫粒與分離工作性能和結構參數的與研究,可用於科研、教學和生產等部門。
  6. The test platform of anti - rolling tank on the ship is a kind of special complex system. so far the country has no test equipments in a large scale

    船舶減搖水艙架是?專用綜合系統,目前在國內還沒有如此功能規模的
  7. And concerning boundary conditions along piping system are properly set. futhermore, vertex sound is discussed in this paper. effect of the noise reduction about the mufflers is analysed, and a lot of trials is used to testify exist of valve noise and influence to pipe system. there kinds of mufflers are proved that they can reduce the fluid niose of pipe system by a large number of experimentation

    對噪聲的抑制? ?消聲器的降噪效果進行了分析,並結合實際工作建立了模擬海水管路架,通過一系列,說明閥門噪聲的存在,及其對管路流噪聲的影響,證明設計的三種結構消聲器對管路流噪聲的良好消減效果。
  8. Distributes wide range of high productivity equipment. includes inkjet printers, machines for laser marking, pad printing, hot stamping, heat transfer, and welding, and aluminum assembly and automated production systems

    -主要產品有大中小型液壓泵站液壓各種過濾管路油箱及液壓系統清洗真空凈油加註
  9. The object function and restriction conditions optimum design for amb ' s structures are set up. based on these results, the structural parameter design method of radial and axial amb is presented, and a test - bed of amb has been designed by the author

    根據磁力軸承結構優化設計目標函數和約束條件,推導了徑向、軸向磁力軸承結構參數設計公式,並設計了一套磁力軸承試驗臺裝置
  10. Test engineer is responsible for scheduling and conducting tests according to global test specification, analizing testing results and releasing test reports ; is responsible for maintenance of testing facilities and implementing 5s in test lab, troubleshooting of test stands ; is also responsible for designing testing jig to carry out the special test which can not be done on standard test stands

    工程師負責按照全球規范,根據本地和全球的要求,計劃和執行各種,分析結果並撰寫報告;負責制訂設備的維護保養計劃和負責室的5s管理,解決故障;負責設計來完成標準無法完成的特別
  11. The design and test of the test bed of air source purification plants for df 4 locomotives are presented

    介紹了東風4型機車風源凈化的設計與情況。
  12. The successful development of this test bed guarantees the maintenance quality of air source purification plants and the reduced failure of air systems

    的研製成功,對提高風源凈化的檢修質量和降低空氣系統故障起到了保障作用。
  13. At the same time, it detailed demonstrate and carry out the way, which apply housing electric spindles at generation state to carry out housing toque loading in the joint testing and indirectly estimation housing torque loading by the electromagnetism torque of inner tube electric spindles. thus, the technical problem that the high speed shafting torque loading device and torque sender are difficult to ins tall is solved. and it saves a set of expensive high speed shafting torque loading and measuring device

    同時,詳細論證並實施了採用外套電主軸工作在發電狀態實現接合的外套扭矩加載和通過內套電主軸的電磁轉矩來間接估算外套加載扭矩的方法,從而解決了高速軸系扭矩加載和扭矩傳感器不宜安的技術難題,並且節省了一套昂貴的高速軸系扭矩加載和檢測,該成果填補了國內高速單向軸承扭矩加載領域的空白,達到了國內領先水平。
  14. In order to provide data reference for ships equipped with anti - rolling tank, based on the item the anti - rolling tank test equipments on the ship among the country 211 key construction projects, the paper goes on deep analysis and research on test platform of tank and motion of rolling and swaying

    為了給實船備減搖水艙提供數據參考,結合國家「 211 」工程重點投資建設項目「船舶減搖水艙」的研製工作,本課題對水艙架及橫搖、橫蕩運動進行了較深入的分析和研究。
  15. In order to satisfy the customer ’ s more strict command to the inertia brake, changsha sanzhan inertia brake co., ltd. and hunan university allied to develop a set of equipment of inertia brake test rigs, which can test and research the property of starting torque, braking torque, vibration of axis and so on to all kinds of models and specification of inertia brake to improve the property and quality of product

    為了滿足用戶對慣性制動器產品提出的更高要求,長沙三占慣性制動有限公司和湖南大學合作開發一套慣性制動器試驗臺裝置,對各種型號及規格的慣性制動器的起動力矩、制動力矩、軸向振動等特性進行測和研究,以改進產品性能和提高產品質量。
  16. Aiming at the structure characteristics of the pipeline system of the existing boiler combustion equipment, the paper work out the new - style air speed measure components via the theory analysis of the existing measure components of all kind of forms and measure theory. and then the paper designs and builds the wind tunnel test - bed to process the test and research of the air speed measure components in order to realize it ' s structure and each characteristic parameter

    針對現有的鍋爐燃燒設備管路系統的結構特點,論文通過對現有的各種形式、測量原理的流量測量的理論分析,設計出新型的風速測量元件,並且設計、建立滿足所需的風洞,對風速測量元件的結構及各項特性指標進行研究,完成一次元件的開發工作。
  17. General method for test bed testing of air heaters and circulators

    空氣加熱器和循環一般方法
  18. Abstract : this paper introduces effect, structure and w orking principle of equipment making conveying belt change groove angle

    文摘:介紹了上輸送帶可變成槽的作用、結構及工作原理。
  19. The paper is based on the project " anti - rolling tank test equipments on the ship " among the country " 211 " key invested projects. the design and realization of test platform and related theoretical questions are analyzed and further discussed

    本文是結合國家「 211 」工程重點投資建設項目「船舶減搖水艙」的研製工作進行的,對船舶減搖水艙架的設計和實現及相關的理論問題進行了深入分析和研究。
  20. There are four devices installed in the test - bed and therefore four different types of testing for rotary sealing rings can be conducted synchronously and separately as well. each device can be driven with its own motor for a long - time testing. each device also can be used for a single testing

    在主機上設有四個獨立的,同時可供四種不同規格的密封環,其中每個均由單獨的電機驅動,進行長時間的回轉,也可單獨控制每個進行
分享友人