試驗車 的英文怎麼說

中文拼音 [shìyàn]
試驗車 英文
laboratory vehicle
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • 驗車 : validate the car
  1. Gunagzhou panyu rongxiang faucet co., ltd. was opened in 1998, the new factory locates in shiji town panyu district guangzhou city, the area is 1, 5000 square meters. it has more than 800 staff and 18 professional workshops now. they are founding workshop, forging workshop, punching workshop, cnc workshop, claming workshop, soldering workshop, polishing workshop, assembling workshop, mould workshop, polishing workshop, electroplated workshop, test workshop etc. we have the ability to work in pineline from casting, forging machining step to polishing and plating step

    廣州市番禺榮祥水暖器材有限公司創建於一九九八年,廠區位於廣州市番禺區石基鎮,佔地15000平方米,主要以生產陶瓷閥芯和水暖器材配件為主,現有員工八百多名,擁有鑄造間(分為引鑄和砂鑄) 、鍛壓間、沖壓間、數控間、鉗工間、焊接間、拋光間、彎管間、模具間、新產品間、電鍍間、試驗車間、檢測間、裝配間等十八個專業間,具備了從鑄造、鍛沖壓、機加工到外表層拋光電鍍一條龍的生產能力。
  2. Verification regulation for force measuring system of fraction power test car of railway

    牽引試驗車測力系統檢定規程
  3. Htv hybrid test vehicle

    混合動力試驗車
  4. Test car method

    試驗車
  5. Elastic rope is used to speed up the test vehicles in the vehicle mpact laboratory of tsinghua university

    摘要清華大學汽碰撞實室利用橡皮繩彈射加速試驗車進行碰撞
  6. By forecasting the length of the elastic rope with linear regression anslysis, test vehicle ' s speed can be controlled acctrately

    用線性回歸統計的方法預測橡皮繩拉伸長度,精確地控制了開環狀態的試驗車的碰撞速度。
  7. Tuesday british pilot andy green put the pedal to the middle in an experimental car and shattered the world land - speed record for a car powered by diesel engines

    周二,英國飛行員安迪?格林在一輛試驗車里油門只踩到一半,以一輛用柴油機供能的汽打破的世界陸地速記錄。
  8. Tuesday, british pilot andy green put the pedal to the middle in an experimental car and shattered the world land - speed record for a car powered by diesel engines

    周二,英國飛行員安迪.格林在一輛試驗車中將腳踏板放在中間,並以這輛柴油發動機助力的汽打破了機陸地行駛的世界紀錄。
  9. Site experiment were carried out on the testing vehicle for ahs and the magnetic markers road in national intelligent transport system center. also, study on multi - sensor information fusion and control model by using neural net system, fuzzy logic and genetic algorithm were carried out. the work completed are as follows mainly : ( 1 ) hardware system for lane keeping system including magnetic marker, magnetic sensor, control system and executor machine were designed

    本文以國家智能運輸系統研究中心的自動公路系統試驗車和專用的磁軌釘道路為工作平臺,在大量的現場實基礎上,針對基於磁軌釘導航的道保持技術中的若干問題展開研究,運用神經網路、模糊邏輯、遺傳演算法等方法在多傳感器信息融合、控制模型等方面進行了系統的研究,主要完成了以下幾方面的工作: ( 1 )對道保持系統硬體平臺進行了設計,論述了導航設施? ?磁軌釘的設計過程和載工控機、步進電機等的選擇。
  10. Adopt two kinds of match ways now : one send instruction carriage come to our company, we match in gui lin ; another is that we match the vehicle according to whole factory. there are the following several kinds of our match technological schemes mainly 1 tech. scheme

    為了降低摩托的尾氣排放污染物,我公司根據整廠的需求,及各型的具體排放狀況,現採用兩種匹配方式:一種是整廠發試驗車來我公司,我們在桂林進行匹配另一種是根據整廠所要匹配輛各零部件的配置情況,我們沿用已有的成功匹配方案進行匹配。
  11. The following works are carried out in the dissertation : the study of meter - gauge freight car intensity design and accreditation test specifications ; the structural design of meter - gauge covered car of 14t axle - load ; the finite element analysis of car body structure of meter - gauge covered car of 14t axle - load ; the structure optimization of meter - gauge covered car of 14t axle - load. specification of intensity design for meter - gauge freight wagons is a combination of the theoretical calculations, long - term tests and the data of the application and maintenance of the rolling stock

    本文主要進行以下工作:米軌貨強度設計與鑒定規范的研究14t軸重米軌棚結構設計14t軸重米軌棚體結構有限元分析14t軸重米軌棚的結構優化設計米軌貨強度設計與鑒定規范是集理論計算、長期輛運用及檢修數據累計分析的結果。
  12. With a private testing line, testing train and detecting equipments

    有一條專用鐵路線,試驗車輛及測設備。
  13. Rolling stock. specific terms for rolling stock. working and test vehicles

    鐵路輛.輛專用術語.工作和試驗車
  14. In this task, a test _ bed for engineering vehicles was developed based on virtual instrument. the whole system comprised 5 parts : the checking of running velocity, which was gotten on the test bed through the vehicles simulating real road running ; the temperature checking of the important points on the transmission system ; the temperature checking of the circling cooling water on the exit port of dynamometers ; the control of the loading power. which was given to vehicles by the power measuring machine ; the control of the total test - run time

    本課題開發的基於虛擬儀器的工程機械跑合臺,其測量和控制參數有:行駛速度檢測(輛在跑合臺上模擬路面的行駛速度) ;傳動系溫度檢測(試驗車輛傳動系主要部位多點溫度) ;冷卻水溫度檢測(測功機循環冷卻水出口溫度) :加載功率控制(測功機施加給輛的載荷) ;跑合時間控制(試驗車輛在臺上加載跑合的總時間) 。
  15. Passenger cars - test track for a severe lane - change manoeuvre - obstacle avoidance

    乘用.道急劇改變演習用試驗車道.故障免除
  16. Acoustics - specification of test tracks for the purpose of measuring noise emitted by road vehicles

    聲學.道路輛噪聲測量用試驗車道規范
  17. Passenger cars - test track for a severe lane - change manoeuvre - double - lane change

    .急劇改變道的操縱用試驗車道.第1部分:兩道變換
  18. On this test track, the standard production cars will be subjected to rough treatment deliberately

    在這個試驗車道,標準汽成品將接受有意的毀壞性測
  19. He continued his career as a manager of the technical division at hazemag belonging to the preussag - noell enterprise where he headed the design and project management division as well as the local test plant

    然後,他成為了隸屬于普魯士薩格諾爾preussag noel集團的哈澤瑪格hazemag公司的技術部主任。在那裡,他負責著設計和規劃部門以及試驗車間。
  20. The test simulation system include simulation cabin, air inlet system, exterior ambient simulation system, indirect pneumatic pressure regulator and data acquisition system

    整個內容包括壓力調節器阻力特性外壓力為負壓時的靜態內壓力為正壓時的靜態外壓力變化的動態
分享友人