試驗開采水量 的英文怎麼說
中文拼音 [shìyànkāicǎishuǐliáng]
試驗開采水量
英文
test yield- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 采 : 采名詞(采地) feudal estate
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 試驗 : trial; experiment; test
- 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
-
The specific capacity obtained from pumping teat generally does not reflect the water abundance of aquifer and so cannot be taken as the basis for the selection of the exploited horizon of groundwater
用抽水試驗獲得的單位涌水量一般不反映含水層的富水性,不宜依它來選擇地下水的開采層位。This paper evaluates the underground water resources and its safe levels of miming, and then studies the availability of molepipe drainage, a kind of practical underground water regulation technique. starting with the elevation of underground water resources and a safe level of mining through variable system theory, this paper analyzes the conditions of underground water resources based on the well - studied determination method of determining the two hydrographical coefficients : rainfall infiltration replenishment rate and irrigation replenishment rate. then considering irrigation, rainfall, drainage and other related factors, a mathematical model is set up for the calculation of underground water storage, exploitation on water regulation
論文從灌區的地下水資源及其可開采量評價分析方面入手,在對兩個主要的水文地質參數即降雨入滲補給系數、灌溉入滲補給系數確定方法研究的基礎上,對灌區的地下水資源狀況進行分析,依據灌區的灌溉、降雨、排水條件及各種現狀因素,建立了地下水資源量計算的數學模型,西安理工大學工程碩士專業學位論文計算得到青銅峽灌區地下水的最大補給量和可開采量;另外對在開發利用地下水資源過程中的地下水位的調控進行了初步的探討,在銀北灌區開展對暗管排水調控地下水位的試驗研究。Take middle - east district of taipusi banner as study area in the paper, combining field observation test ( pumping test and field survey ) with indoor experiment ( granule analysis and organic matter analysis etc ), based on the relationship between hydrological parameters and physical - chemistry characteristic parameters of formation, the variability of aquifer parameters and physical - chemistry parameters of unsaturated zone have been also analyzed. the aquifer system of the taipusi banner is identified and analyzed by using the internal and outside information. on the basis of real pumping of ground water, the water resources evaluated by the water balance method
本文以太僕寺旗中東部地區為研究區域,採用野外試驗(抽水試驗、實地調查)和室內實驗(顆分、有機質等實驗)相結合的方法,推求了研究區含水層系統的水文水利參數,在系統模擬含水層水理參數與巖性物理化學特徵參數之間的關系基礎上,進一步分析了含水層參數及其包氣帶的物理、化學特徵參數的空間變化特徵,並利用其內外部信息對太僕寺旗含水層系統進行了辯識與分析;以現狀地下水開采量為依據,採用水均衡法評價了研究區水資源總量,並利用有限單元法來模擬分析驗證。Based on conclusion of practical experience from polymer flooding pilot test, and in combination with theoretical calculation and analysis of numerical simulation, the varying range of main production index by polymer flooding is determined, varying mode of liquid production, comprehensive water cut, oil production and incremental oil by polymer flooding is set up by adopting reservoir engineering method, forming simplified, fast and feasible method for calculating production index by polymer flooding, which provide practical and theoretical basis for making polymer flooding programe
本文在總結聚合物驅礦場試驗實踐經驗和結合數值模擬理論計算分析的基礎上,研究確定聚合物驅主要開采指標的變化范圍,採用油藏工程方法建立聚合物驅采液量、綜合含水、採油量和增油量的變化模式,形成簡便、快速、實用的聚合物驅開采指標測算方法,為編制聚合物驅規劃方案提供了實踐和理論依據。Abstract : based on conclusion of practical experience from polymer flooding pilot test, and in combination with theoretical calculation and analysis of numerical simulation, the varying range of main production index by polymer flooding is determined, varying mode of liquid production, comprehensive water cut, oil production and incremental oil by polymer flooding is set up by adopting reservoir engineering method, forming simplified, fast and feasible method for calculating production index by polymer flooding, which provide practical and theoretical basis for making polymer flooding programe
文摘:本文在總結聚合物驅礦場試驗實踐經驗和結合數值模擬理論計算分析的基礎上,研究確定聚合物驅主要開采指標的變化范圍,採用油藏工程方法建立聚合物驅采液量、綜合含水、採油量和增油量的變化模式,形成簡便、快速、實用的聚合物驅開采指標測算方法,為編制聚合物驅規劃方案提供了實踐和理論依據。Leng 43 block was developed in 1993 and since then conventional fracturing conduction, water flooding test, steam soaking were successively carried out, but exposing several inconsistencies such as high decline rate of output, water flooding fingering, low potential of steam soaking etc. among them the physical properties is an important factor that affecting the result of development
該塊從1993年投入開發以來,先後進行過先期壓裂常規開采、注水開發試驗、蒸汽吞吐開采,但是暴露出常規開采產量遞減快、水驅指進、蒸汽吞吐潛力小等矛盾,其中儲層特徵是影響其開發效果的一個主要因素。分享友人