調度方式 的英文怎麼說

中文拼音 [diàofāngshì]
調度方式 英文
cooperative scheduling
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • 調度 : 1 (調遣) dispatch (trains buses etc ) 2 (調度員) dispatcher 3 (安排) manage; control 4 (...
  • 方式 : way; fashion; pattern
  1. Study on flood control forecast operation model of biliuhe reservoir

    碧流河水庫防洪預報調度方式研究
  2. Under preemptive scheduling, the highest priority task executes until it enters the waiting or dead states or a higher priority task comes into existence

    採用搶先調度方式時,具有最高優先級的任務先執行直到它進入等待或僵死狀態,或者是有更高優先級的任務產生。
  3. A : under preemptive scheduling, the highest priority task executes until it enters the waiting or dead states or a higher priority task comes into existence

    採用搶先調度方式時,具有最高優先級的任務先執行直到它進入等待或僵死狀態,或者是有更高優先級的任務產生。
  4. Third, on the base of the improved architecture, two scheduling algorithms have been designed : acbs and cbstdm, which both are distributed traffic scheduling schemes and totally different from the traditional fabric scheduling schemes. the traditional fabric scheduling algorithms push the data towards egress ; however, acbs and cbstdm pull data from ingress. in acbs, ingress and egress transfer asynchronous control messages to finish distributed “ one - hop ” scheduling

    再次,在改進結構基礎上設計了兩種調演算法acbs和cbstdm ,兩種演算法均屬于流調演算法,採用分散調度方式,與傳統的用於多級結構的集中兩次匹配的調演算法有很大的區別,傳統演算法將輸入埠的數據包「推」向交換結構的輸出埠,而acbs演算法和cbstdm演算法是通過輸出調器將數據包從輸入埠「拉」向輸出埠。
  5. Finally, taking the panjiakou reservoir in the haihe river basin in china as an example, the paper analysis the reasonable adjustment scheme of the limited level of the reservoir during the flood season according to the design flood, the flood forecasting, the flood control operation under forecasting, the flood control standard of upstream and downstream of the reservoir, the immigrants range, and the benefits and the risk of the reservoir in a long period of the operation simulation

    最後以海河流域潘家口水庫為分析實例,從設計洪水、預報預泄、洪水預報調度方式、上下游防洪設計標準、上游移民淹沒及土地退賠線、水庫長期運行的風險和效益等多個面分析論證了水庫汛限水位的合理調案。
  6. This text has analysed load balancing method of existent especially lvs cluster system and recommended the net packet and netfilter ’ s frame structures in the linux operating system ; it has compared the cooperative - type - cluster with tradictional cluster in the net packets ’ queue ways and with active cluster in the load balancing dispatcher way, which has reflected the superiority of cooperation type cluster ; the three major parts of the cooperative - type - cluster have been designed and realized in this text, which includes sync packets ’ priority service for dmcs 、 “ priority and avoid sudden load unbalance ” dispatch way at the cooperation of nodal servers and director and active nodal server which ensure cluster normally running when cluster join or rduce node server ; the cooperative - type - cluster ’ s control frame controlled by homepage has been constructed ; the mulit - services cluster system has been realized ; this text has used the existing server pressure testing tools to test the cooperative - type - cluster and lvs cluster, then has comparaed and analysed the two

    本文分析了現有服務器集群特別是lvs集群系統的負載均衡法,介紹了linux系統下的報文和netfilter的框架結構;將所提出的合作集群與傳統集群在報文排隊上進行比較,與主動集群在負載均衡調度方式上進行比較,體現了合作集群的優越性;設計並實現了合作集群體系結構的三大部分:針對分散測控系統的加權服務、負載均衡器與節點服務器合作「加權防突」負載調、保證集群運行不受加減節點干擾的主動性真實服務器;構建了通過網頁界面控制合作集群的控制框架;實現了一個可運行的合作多服務集群系統,運用現有服務器壓力測試工具對合作集群和lvs集群進行負載測試,並對測試結果進行比較分析,同時通過壓力測試實現加權服務。
  7. The following three alternatives are used to assess the impact caused by the projects, ( l ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is to supply water for the project, ( 2 ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is hydropower generation and ( 3 ) the entrance of tunnel is at the upper of the huanren dam

    本文擬研究該調水工程的水源工程?桓仁水庫的調運行,使工程的正面效益較大,負面損失盡可能地小。桓仁水庫的調度方式有三個案: ( 1 )以供水為主的壩下取水案; ( 2 )以發電為主的壩下取水案; ( 3 )庫區取水案。
  8. 5. for frozen erosion the good measure is to cut slop and lining with coarse gravel ; meanwhile, adjust the canal operating to less the frozen

    ( 5 )對于凍融和凍脹較為嚴重的渠段則宜採用削坡后鋪碎石護岸;為減輕凍融侵蝕,同時採取適當的調度方式
  9. The system possesses the real time correcting function, which can avoid error accumulation and highly increase the forecasting accuracy ; ( 3 ) the flood control system can be multiple - scheme designed, that is, the control schemes can be designed in terms of different control ways for hydro - projects. simulated computation can be carried out to obtain multiple schemes that can be used by the leaders for decision making after risk and consequences estimation, so as to scientifically enhance th

    系統具有實時校正功能,可以避免誤差累積,極大地提高了預報精; ( 3 )防洪調系統可以進行多案設計,即可以根據水工建築物不同的調度方式來設計調案,並進行模擬調計算,最終生成多個案,供領導決策,提高了防洪決策的科學性; ( 4 )系統採用的數據均建立在實時雨情、水情、工情和天氣預報等數據庫基礎上,預報、調均能做到快速及時。
  10. The algorithm tries to schedule each task node at its earliest start time to obtain good performance of the whole task

    演算法力求保證每個節點的最早開始時間,通過這種調度方式獲得整個任務的優化調結果。
  11. Then, we analysis its performance, mainly discuss the effect of traffic load and different scheduling mechanisms under this model

    之後討論了在這個模型下多點實時通信的性能,著重分析了不同調度方式和不同網路負荷對實時數據的時延影響。
  12. Round robin would distribute connection attempts evenly among the channels, while hashing would use the client s ip address to determine the destination channel

    輪流調度方式會將連接嘗試均勻地分佈到各個通道上,而散列法則使用客戶機的ip地址來確定目標通道。
  13. A standardized method of describing the grid service will help give structure to this area, as it will enable grid implementations to specify how work needs to be scheduled

    描述網格服務的標準化法有助於給出這一面的結構,因為它允許在網格實現中指定任務的調度方式
  14. The hydrologic forecasting is the basis of the economic dispatching of multi - reservoir system. precise prediction is the key to ensure the success of optimal dispatching

    徑流預測作為水電站優化調的基礎,其預報結果的準確與否,將成為水電站的最優調度方式能否發揮作用的關鍵。
  15. With the analysis, the paper designed the system framework and data structure. it is necessary to compress the data before its storage and transmitting because data used in the system is huge

    傳統的試驗與測試系統在綜合顯示面存在著數據顯示單一,系統管理及調度方式復雜、異地管理困難等不足。
  16. Based on the simulation software witness, two schemes of the quay container cranes scheduling ways and vessel berthing ways are simulated. according to the statistics analyzing of the simulation results, some conclusions are achieved for the reference of the real operation of the container terminal

    並藉助witness模擬軟體,對集裝箱碼頭前沿的岸邊集裝箱起重機調度方式以及船舶沿岸線靠泊兩種案進行了計算機模擬,並通過對模擬結果的統計分析,得出了可供集裝箱碼頭實際操作用的參考結論。
  17. The singlepoll scheme and the multipoll scheme are applied to realize polled txop. the simulations validated that polled txop can offer good parametered qos service. moreover, the advantage of multipoll scheme is proved by comparison of polling efficiency

    對polledtxop ,分別利用singlepoll和multipoll兩種調度方式實現,驗證了其能夠有效支持參數化qos ,並通過調效率的比較,證明了multipoll調的優越性。
  18. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進行以上四面內容深入探討的基礎上,論文針對丹江口水利樞紐運行任務、運行的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發電效益減少值;合理地核算水源的供水成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化量;提高預報水平,減少棄水量,爭取增發季節性電能;研究新的調度方式,提高電站調峰能力,提高電站的容量效益;在適當的地點修建抽水蓄能電站,提高電站的調峰能力。
  19. Abstract : the processes concept is introduced in monolithic processor control system. date structure design and system scheduling for using processes scheduling to manage system sources are described in this paper

    文摘:將多進程概念引入8098單片機控制系統中。重點描述了採用進程調度方式管理資源的數據結構設計及系統調流程。
  20. Combining with case study, the application conditions of hydrologic meteorology forecast information and flood forecast information in dynamic control of the limit water level during flood seasons are also illustrated. ( 3 ) in order to relieve the contradiction between water discharge in flood seasons and water shortage after flood seasons, the manner of flood operation with fixed limited water level during fixed time should be adjusted

    ( 3 )為改變水庫汛期棄水而汛后又缺水的矛盾局面,調整現行水庫固定時間固定汛限水位的調度方式,利用短期氣象預報和洪水預報信息,在不改變現有防洪標準的前提下研究防洪預報調度方式,實現防洪與興利效益的轉換,提高洪水資源的利用率。
分享友人