護坡石料 的英文怎麼說

中文拼音 [dànliào]
護坡石料 英文
pitcher
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • 石料 : aggregaed rock; building stones; 修琢石料 dress building stones石料路面 stone pavement
  1. They have raised all kinds of engineering steps on roadbed against frozen disaster, for example, adopting the reasonable height of roadbed, building ventilative embankment, setting up the defense, burying hot metal stick, making use of stone to protect slope and laying thermal insulation and heat insulation material etc, laying eps is one of these special steps

    針對路基凍害問題,人們對路基凍脹、融沉和溫度場特徵進行了廣泛研究,提出了各種路基抗凍害的工程措施,如選用採用合理的路堤高度,修築通風路堤,設置道,埋設熱棒,利用片和鋪設保溫隔熱材等特殊工程措施。
  2. Such problems as desertification 、 soil erosion 、 debris flow 、 landslide 、 garbage disposal 、 changes in ecological and geological environment 、 dispose of radioactive nuke rubbish 、 protection of famous historic and cultural sites are researched in this field

    研究課題涉及到:沙漠化、水土流失、泥流、滑、垃圾填埋處理、生態和地質環境的變遷、放射性核廢的處理和名勝古跡的保等。
  3. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋壩損毀情況的現場調查資,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變水槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材(塊和卵兩種) 、底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的面層作為散拋壩的防沖毀措施,以期取得良好的工程效果。
  4. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊穩定、混凝土襯砌墻的結構與支研究;特大型水輪發電機組的科學研究。
  5. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊穩定、混凝土襯砌墻的結構與支研究;特大型水輪發電機組的科學研究。
  6. ( 5 ) through using value engineering to optimize the mining technology in the material field, this directly reduced the requirement of engineering geology condition of mining block stone, and raised mining rate of stone in the material field, and then reduced the cost of production of armor stone by 394. 4 thousand

    ( 5 )應用價值工程對場的開采工藝進行優化,降低了開采塊場的工程地質條件,提高了場的塊採取率,進而為的生產降低成本39 . 44萬元,取得了較大的經濟效益。
分享友人