護柱 的英文怎麼說

中文拼音 [zhù]
護柱 英文
bollard
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  1. Following this reference yields a pretty liberal license, except for the ominous footer : " information in this document is subject to change without notice. " the fact that the license is not written into the product, but is asserted by reference to a web page that can be changed at any time, raises the specter of a possible trojan horse play where cxml is spread through the industry and then its owner stated as ariba in the license can make a sly play for juicy profits, or cut down a competitor, by moving the licensing goalposts

    ( 「 information in this document is subject to change without notice 。 」 )許可證並未寫入到產品中,而是通過到可能會隨時更改的web頁面的引用進行維的這一事實,引發了對可能的特洛伊木馬活動的憂慮,那就是cxml在業界傳播,然後它的擁有者(就象許可證中所聲明的ariba )通過移動許可發放「門」來暗中想方設法獲利,或者削弱競爭對手。
  2. Dundrum, south, or sutton, north, both localities equally reported by trial to resemble the terrestrial poles in being favourable climates for phthisical subjects, the premises to be held under feefarmgrant, lease 999 years, the message to consist of 1 drawingroom with baywindow 2 lancets, thermometer affixed, 1 sittingroom, 4 bedrooms, 2 servants rooms, tiled kitchen with close range and scullery, lounge hall fitted with linen wallpresses, fumed oak sectional bookcase containing the encyclopaedia britannica and new century dictionary, transverse obsolete medieval and oriental weapons, dinner gong, alabaster lamp, bowl pendant, vulcanite automatic telephone receiver with adjacent directory, handtufted axminster carpet with cream ground and trellis border, loo table with pillar and claw legs, hearth with massive firebrasses and ormolu mantel chronometer clock, guaranteed timekeeper with cathedral chime, barometer with hygrographic chart, comfortable lounge settees and corner fitments, upholstered in ruby plush with good springing and sunk centre, three banner japanese screen and cuspidors club style, rich wine - coloured leather, gloss renewable with a minimum of labour by use of linseed oil and vinegar and pyramidically prismatic central chandelier lustre, bentwood perch with a fingertame parrot expurgated language, embossed mural paper at 10 - per dozen with transverse swags of carmine floral design and top crown frieze, staircase, three continuous flights at successive right angles, of varnished cleargrained oak, treads and risers, newel, balusters and handrail, with stepped - up panel dado, dressed with camphorated wax, bathroom, hot and cold supply, reclining and shower : water closet on mezzanine provided with opaque singlepane oblong window, tipup seat, bracket lamp, brass tierod brace, armrests, footstool and artistic oleograph on inner face of door : ditto, plain : servant s apartments with separate sanitary and hygienic necessaries for cook, general and betweenmaid salary, rising by biennial unearned increments of 2, with comprehensive fidelity insurance annual bonus, and retiring allowance based on the 65 system after 30 years service, pantry, buttery, larder, refrigerator, outoffices, coal and wood cellarage with winebin still and sparkling vintages for distinguished guests, if entertained to dinner evening dress, carbon monoxide gas supply throughout

    一截彎木上棲著一隻馴順得能停在手指上的鸚鵡它吐字文雅,墻上糊著每打價為十先令的壓花壁紙,印著胭脂紅色垂花橫紋圖案,頂端是帶狀裝飾一連三段櫟木樓梯,接連兩次拐成直角,都用清漆塗出清晰的木紋,梯級登板起欄桿和扶手,一律用板來加固並塗上含樟腦的蠟浴室里有冷熱水管,盆湯淋浴,設備俱全。位於平臺246上的廁所里,長方形窗子上嵌著一塊毛玻璃,帶蓋的坐式抽水馬桶,壁燈,黃銅拉鏈和把手,兩側各放著憑肘幾和腳凳,門內側還掛有藝術氣息濃厚的油畫式石版畫。另外還有一間普通的廁所廚師打雜的女僕和兼做些細活的女傭的下房裡也分別裝有保健衛生設備僕役的工錢每兩年遞增兩英鎊,並根據一般忠誠勤勞保險,每年年底發獎金一英鎊,對工滿三十年者,按照六十五歲退職的規定,發退職金餐具室配膳室食品庫冷藏庫主樓外的廚房及貯藏室等堆煤柴用的地窨子里還有個葡萄酒窖不起泡亮光閃閃的葡萄酒,這是為宴請貴賓吃正餐身穿夜禮服時預備的。
  3. On the basis of expound the theory of building exterior - protected construction energy consumption and the gene of influence the building energy, set up mathematics model, this article discuss the mechanism of dispelling the heat of the buildings " thermal bridge and the complication that influence it, and then synthetic analysis and calculate the influence range of building thermal bridge in exterior - protected construction column thermal bridge to the building outer wall get the conclusion that when the construction column can satisfy the building stress - area, in bulgy construction column dispel less heating than out bulgy construction column. but if the pole stuck out more than 100mm, in bulgy or out bulgy make no difference

    本文在闡述建築圍結構耗熱原理以及影響建築能耗因子的基礎上,採用數值模擬方法,探討了建築熱橋傳熱的基本機理和影響建築熱橋傳熱的因素,進而對建築熱橋在圍結構傳熱中的影響范圍進行了綜合分析和計算,研究了構造熱橋型式對建築外墻能耗的影響,得出了構造在滿足建築受力面積要求的情況下,內凸構造較外凸構造略能減少散熱量的結論,但是凸出過大( 100mm )無論內凸還是外凸對建築耗熱都沒有大的差別。
  4. The peri - operation nursing of 10 cases for top - centrum displace though forward to rectify the spinal - tuberculosis with post - projection patients

    10例前路后凸頂椎前移方法矯正脊結核伴嚴重后凸畸形病人的圍手術期
  5. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為、冷彎薄壁c型鋼背靠背高頻焊接組成工字型梁、壓型鋼板上現澆築混凝土組成組合樓板並與梁一起構成組合梁作為承重構件,以輕質節能保溫型墻體作為圍結構組成。
  6. Ipr protection : pillar of a robot economy

    智慧財產權保:健全經濟的支
  7. Repair, installation and adjustment of zbs - h915f axial plunger pump

    軸向塞泵的維安裝調試
  8. More than 300 prismoid concrete specimens with calcareous aggregate were made. three factors, temperature in fire, standing time and cooling type and cure methods after cool, were considered to simulate possible appearance in fire and after fire. many test schemes were planned for different purposes

    設計製作了300餘個鈣質骨料混凝土稜體試件,為了模擬火災時及火災后可能出現的情況,分別考慮了不同的火災受火溫度、靜置時間和冷卻及冷卻后的養方式三種影響因素,根據試驗目的的不同,設計了多種試驗方案。
  9. The 2 riflemen should protect your tiberium spike from buzzer attacks

    兩隊機槍兵應該保你的礦免受蜂群的襲擊。
  10. Specification for marine guardrails, stanchions, etc - storm rails exterior

    船舶欄立等規范.第3部分:風暴扶手
  11. Using individual hydraulic prop in thin coal seam face is better than the others in the aspect of support strength, premary supporting force, shrink amount and safety

    在薄煤層工作面中使用單體液壓支,在支強度、初撐力、可縮量、安全保障及操作人員安全上,都優于其它單體支材料。
  12. The thesis consists two parts : failure analysis of hydraulic axial piston pump and maintenance of hydraulic system

    論文主要有兩個部分的內容:液壓軸向塞泵的故障分析和工程施工企業液壓設備的管理和維
  13. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿法」做承臺梁, 「抗彎抗剪錨筋法」強化加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  14. Narrow coal pillar support technology used at isolated island workface

    孤島工作面窄煤錨桿支技術探討
  15. 1 the spacing of 2 - column is 910mm. it can suppress concrete curb bricks and slope bricks of 750 x 500 x 150mm

    1二工位立間距910mm ,可壓制750500150mm的混凝土路緣磚坡磚等
  16. 2 the spacing of 4 - column is 780 780mm. it can suppress concrete curb bricks and slope bricks of 600 x 600 x 150mm

    2四工位立間距780780mm ,可壓制600600150mm的混凝土路緣磚坡磚等。
  17. Present thermal bridge influence area to the building out exterior - protected construction. for the construction column thermal bridge, the influence area increase 100mm along the thermal bridge. the position of maximum heat - flux is between the thermal bridge and the outer wall

    給出了熱橋對建築外圍結構的影響區域,對于構造熱橋其影響范圍為熱橋邊沿向外100mm ,熱流量最大的位置在於熱橋與外墻交界處。
  18. Handrails and footrails at masts, posts and walls on ships

    船上的扶欄和桅桿上的腳部欄樁墻壁
  19. The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor

    樁錨支擋結構體系是重慶地區經常採用邊坡支形式之一,長期以來,人們認為樁錨支擋結構體系的傳力途徑是:土壓力先作用於擋板上,通過擋板再傳到兩邊立,然後再通過錨桿把力傳遞給穩定地層。
  20. The device of loading coal and protecting pillar in conventionally - mechanized coal winning technology face

    普采工作面裝煤護柱裝置
分享友人