谷岸 的英文怎麼說

中文拼音 [àn]
谷岸 英文
tanigishi
  • : 谷名詞1 (兩山或兩塊高地中間的狹長而有出口的地帶) valley; ravine; gorge 2 (姓氏) a surname 3 ...
  • : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜腦組二段大理巖和三疊系雜腦組三段的砂板巖。在勘探過程中,發現左壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. Start the day as we derive across golden gate bridge and reach mount tamalpais. enter muir woods national monument and stand before a over 200 ft tall, 1200 year - old redwood tree while you take a walk through the paths surrounded by natural. enjoy a deliciously seafood buffet lunch

    通過舊金山著名的金門大橋,前往位於太平洋邊上海拔2604英尺的海灣山,進入紅木峽內的紅木國家公園muir woods national monument ,觀賞聳直參天高達200多英尺,年近800歲的海紅木巨樹。
  3. This parlour is not his sphere, i reflected : the himalayan ridge or caffre bush, even the plague - cursed guinea coast swamp would suit him better

    「這間客廳不是他的天地, 」我沉思道: 「喜馬拉雅山或者南非叢林,甚至瘟疫流行的幾內亞海的沼澤,才是他用武之地。
  4. There are many trees on both sides of the dell

    的兩有許多樹木。
  5. Its quay, broken or interrupted in many places, ran along the seine, from the tour de billy to the tour du bois ; that is to say, from the place where the granary stands to - day, to the present site of the tuileries

    沿河的堤,雖然沖垮了,或者說有幾個地段中斷了,還是沿著塞納河而下,從比利炮臺一直延伸到樹林炮臺,換言之,從今日豐登倉所在地直至杜伊勒里宮所在地。
  6. It is a rather well - known fact that bank - slope deformation and failure result from the coupling of earth ' s endogenic and exogenic geological processes, in which different dynamic - force factor has a different correlation to the evolution of bank - slope

    摘要河谷岸坡的變形與破壞是地球內外動力耦合作用的結果,並且每一種動力地質作用對于坡變形失穩的貢獻程度不同,造成坡變形破壞頻率和規模的空間差異。
  7. Flowing into streams, i ' ve been flying spring stream and waterfall to freshen ridges and peaks up. mingling in rivers to be fleecy waves with songs for smiles of rocks along the side banks ; walking into lakes to gentle waves with green montains for the coming of sun, up and down. finally, i came to you, waiting for your embracing, for you ' re my longing sea, so you ' ll certainly not repudiate me

    我流經山,看過鳥語花香;我走過草地,聽過蟲鳴蛙鼓;我走過籬落,看過枝頭的第一抹新綠;我匯入泉源,化作飛泉瀑布,給峰巒梳洗打扮;我匯入江河,化作浪花朵朵,給邊的巖石唱起動聽的情歌;我匯入湖泊,化作溫柔的碧波,和青山一起,共同迎接日出月落;最後,我來到你面前,等待你的接納,我想你是海,你一定不會因我的渺小而拒絕我的到來。
  8. You may take an optional cruise on lake powell, with a shoreline of 1960 mile to navajo indian reservation. arrive at the mountain valley in the afternoon. mammoth monoliths and immense rock spires stretch heavenward from the desert floor

    早上驅車前往參觀位於大峽上游科羅拉多河上的榕林峽水壩,偉大的水利工程,造福了三百萬亞利桑那州的居民同時,可以自費乘船游覽包偉湖,其湖線長1960英哩,其中有96個峽,猶如將大峽搬到湖上一般。
  9. Deep bays and sounds, in the shape of river valleys, cut inland on the coasts.

    深海灣和海峽,呈河的形狀,在邊切割內陸。
  10. The expedition of about 30 individuals sailed from the town of hoorn under the leadership of captain peter heyes in the ship de walvis the whale. their settlement, called zwaanendael, meaning valley of swans, was located near the present town of lewes on the west bank of the lewes creek, today the lewes and rehoboth canal

    Peter heyes船長帶領de walvis號船隻上的30位船員從小鎮hoorn出發遠航來到特拉華,在lewes creek西的lewes鎮現在的lewes and rehoboth canal建立了一個名為zwaanendael天鵝山的居留地。
  11. They clung to the purple moors behind and around their dwelling - to the hollow vale into which the pebbly bridle - path leading from their gate descended, and which wound between fern - banks first, and then amongst a few of the wildest little pasture - fields that ever bordered a wilderness of heath, or gave sustenance to a flock of grey moorland sheep, with their little mossy - faced lambs : - they clung to this scene, i say, with a perfect enthusiasm of attachment

    她們眷戀住宅後面和周圍紫色的荒原一眷戀凹陷的溪。一條鵝卵石築成的馬道,從大門口由高而低通向那裡,先在蔽樹叢生的兩之間蜿蜒著,隨后又經過與歐石南荒原交界的幾個最荒蕪的小牧場。一群灰色的荒原羊和苔蘚般面孔的羊羔,都靠這些牧場來維持生命嗨,她們熱情滿懷地眷戀著這番景色。
  12. The mechanical genesis of the complicated rock mass is because several times of tectonism in pro - period made the structure of rock mass in the right dam foundation damaged seriously and rock mass alteration made its mechanical character more anisotropy. after that the fractures in the right dam foundation slope were stretched at the beginning of the quaternary period because in the period yakouhoushan mountain quaquaversal dome was blowups quickly. at the same time, the valley trenching of lancang river reach to 800 - 1000 meter in altitude at the right bank in nuozadu dam site

    導致右巖體復雜化的成因是,右巖體在早期遭受了多期構造作用和巖體蝕變的基礎上,第四紀早期丫口後山穹隆的快速隆起與當時河下切至800m 1000m高程這一特殊因素組合引起了右巖體沿原有的斷裂(裂隙)張開,使地下水等風化營力能夠到達坡體較深部位,經過長期的風化卸荷作用,形成了右復雜巖體。
  13. Tenant farmers in the south, for example, moved to industrial centers in the mississippi valley, the midwest, and the pacific coast

    例如,南部的佃農前往密西西比河、中西部以及太平洋沿的工業中心。
  14. From heather covered mountains to dense wooded glens, dramatic coastline scenery to windswept bog lands, there is a breathtaking sight around every corner

    從石南花覆蓋的山巒到樹木茂密的幽,從壯麗的海風光到大風肆虐的沼澤之地,嘆為觀止的景緻遍及每一個角落。
  15. ( 2 ) according to the forming model of the deep pull cracks, they can be divided into three classes pulled cracks -, pressed cracks and sheared cracks. ( 3 ) based on the two - dimensional and three - dimensional finite element methods. the following results can be affirmed : in the slope excavating process, the base surface will rebound in the direction of the excavating surface ' s excerior normal. the maximal displacements of the left and right bank are + 3. 6cm and + 2. 4cm ; the arch abutment will rebound in the direction of the river valley, the maximal displacements of the two bank are + 3. 5cm and + 2. 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction. the maximal displacements are + 2. 1cm and + 1. 7cm. ( 4 ) the natural slope is stable

    ( 3 )通過二維及三維有限元分析得知,左右拱肩槽邊坡在開挖過程中,開挖底面主要表現為朝開挖面外法線方向發生回彈,左右最大位移量分別為+ 3 . 6cm 、 + 2 . 4cm ;拱端面主要表現為向河方向發生側向回彈,左右最大位移量分別為+ 3 . 5cm 、 + 2 . 2cm ;上下游坡面主要表現為向臨空方向的回彈,左右最大位移量分別為+ 2 . 1cm 、 + 1 . 7cm ;開挖使巖體產生由卸荷回彈導致的傾倒拉裂現象。
  16. To the north, sahara is bordered by the atlas mountains and the mediterranean sea ; in the west by the atlantic ocean ; in the south, the desert zone reaches 16 ? northern latitude ; in the east it is bordered by the nile

    撒哈拉沙漠北部以阿特拉斯山脈和地中海為界,西從大西洋沿開始,南部到達(北緯16度) ,蘇丹和尼日河河,東部直抵紅海, (尼羅河) 。
  17. The ecological resources recorded within the assessment area include shrubland, stream ravine, coastal backshore and reservoir pond marsh

    在研究區內所錄得的生態資源包括灌木叢河溪河后灘和水塘蓄水庫沼澤。
  18. Please drive me to royal benja hotel ( jomtien plam beach hotel )

    我住在曼賓佳酒店(芭堤雅春天海度假酒店) ,請送我回去。
  19. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽區地應力場多階段的特徵和演變規律,進而對左、右地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。
  20. On basis of the concrete character of the whole reservoir bank, the reconstruction of reservoir bank is valuated and forecasted by means of analogy method, which means to acquire the ultimately stable slope angel of zone being affected by reservoir water after reservoir storing water by analogy to the slopes " configuration parameters of the yangtze river before the reservoir storing water

    針對庫區的具體情況,採用現代長江河谷岸坡形態參數類推水庫蓄水后相應水位作用帶的最終穩定坡角,對145m和175m兩種庫水位條件下的庫再造進行了預測和評價。預測和評價結果表明,再造強烈的庫段累計總長4 . 05km ,占整個庫總長( 10 . 352km )的39 . 1 。
分享友人