豎向分區 的英文怎麼說

中文拼音 [shùxiàngfēn]
豎向分區 英文
vertical division block
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : 區名詞(姓氏) a surname
  1. In this paper, using the program ( epagpll ), the bored testing pile group of the chinese architecture science and research institute at luokou area are analysised. the comparisons among analytical results of four constitutive models of soil are made, and the deformation of piles and soil, the soil resistance of the piles, the friction beneath cap, the aclinic displacement of the ground soil before piles and the failure pattern of pile group are discussed in detail

    本文利用所編的程序,對上海地荷載作用下的單樁的流變效應進行了析,並通過樁體位移?時間關系曲線,確定軟土地基上直受力樁的承載力,析了直受力樁的最終沉降量的大小,並結合《上海地地基基礎》地方規范就程序計算結果進行了對比。
  2. The paper also advise that the design of pile vertical bearing capacity in the west of coteau area of yunnan province taking advantage of the experience formula which adopt subentry safety factors, and come up with the value range of the parameters preliminarily

    論文建議滇西山溝谷地段樁基承載力設計使用採用項安全系數的經驗公式,並初步給出了各參數的取值范圍。
  3. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山大直徑灌注樁承載力確定存在的問題,進行了5根試樁的靜載荷試驗,析了域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  4. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近域的作用,在其兩端面上施加了由平面桿系結構析所得的端面內力,另外,索力和預加力(梁縱、橫隔梁橫、斜腹板)也施加在相應的位置,析了箱形主梁在自重、索力和預應力作用下的空間應力效應。
  5. According to the types, height and fireproof grade of the buildings, four basic ringed arrangements are brought up, namely the ringed arrangemensts of branch lines, the ringed arrangements of cross mains, the ringed arrangements of feed mains and the ringed arrangements of fire waterhead. on the basis of analyzing the means, characteristic and applicability of the four basic ringed arrangements, several practicality ringed arrangements are brought up, namely the ringed arrangements of branch lines and cross mains, the ringed arrangements of cross mains and feed mains, the ringed arrangements of branch lines and feed mains, the vertical ringed arrangements of feed mains and the ringed arrangements of sprinkler system in the abnormity buildings

    根據建築物的類型、高度和防火等級等因素,提出配水支管環狀、配水幹管環狀、立管環狀和消防水源環狀這四種基本環狀形式,析了四種環狀管網的環狀布置方法、特點和適用性。在此基礎上又提出了支管與干管環狀、干管與立管環狀、支管與立管環狀、立管環狀以及不規則域環狀等幾種實用的環狀形式。
  6. At the same time, the main feature of structure on atria is a floor opening or series openings connecting two or more stories. this structure feature has challenged the traditional smoke control technology, which is the concept of floor - to - floor compartmentation, adopted in tradition buildings

    但是中庭建築在直方上連續貫通數層的結構特點,卻傳統建築設計中所採用的水平、垂直隔的防排煙措施提出了挑戰。
  7. The synthetic operation of engineering pipelines of a residential area is to collect designed and existing information of each kind of engineering pipelines in the layout space of the residential area, to analyze and investigate the information, to find out and solve the conflict in the constructing process of the engineering pipelines, to synthetically arrange the plane and vertical location of the engineering pipelines, to provide the foundation for the engineering pipelines " designing, construction and management the leading content of this dissertation is how to make use of the vertical space under roads in the residential area and rationally locate every underground engineering pipelines

    工程管線綜合就是搜集包括現狀的小規劃范圍內各項管線工程的規劃設計資料,加以析研究、綜合安排,發現並解決工程管線在規劃設計中的矛盾,合理地安排各管線的平面位置和高度,為各工程管線的設計、施工和管理提供依據。由於架空敷設方式很難保持環境的完整和美觀,有礙小進一步發展,且存在諸多不安全隱患,正被逐步替代,因而,如何利用小道路下的空間,合理設置各專業埋地管線,成為本文研究的主要方
  8. And, the applicable conditions and the merits and shortcomings of every kind of subarea forms are compared according to the plane and vertical arrangements of buildings, water supplying pressure of cities, water tanks or pressure stabilization devices installed in buildings, working states of fire pumps and working pressure of the vertical systems and sprinkler numbers

    同時,根據建築物的平面和布置、城市管網的供水壓力、水箱或穩壓裝置的設置情況、水泵工作狀態、系統工作壓力要求和噴頭數進行各種系統,討論各種形式的適用條件、優缺點。
  9. Based on the assumed vertical displacement of the unit cell and the assumed distribution on the pile - soil interface of the pure friction pile, and using the boundary conditions that there was no relative slipping between pile and soil, the pile decrement was equal to that of soil on the pile - soil interface and that the vertical sheer stress of the unit cell ' s outer edge was equal to zero, the formula for the frictional distribution of the pure friction pile and the formulas for the displacement of pile and soil in the treated area were deduced

    通過假定的單元體位移模式和純摩擦樁樁側摩阻力佈模式,利用樁土間無相對滑移、樁土界面處樁土壓縮量相等和單元體邊界處切應力為零等邊界條件,推導出復合地基純摩擦樁樁側摩阻力佈的具體表達式,以及加固樁土壓縮量的計算公式。
  10. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值析程序ansys別對採用土釘支護的一階邊坡、二階邊坡進行析,重點是研究各排土釘的軸力佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力析對朗肯、庫侖兩種經典土壓力理論的別與聯系、坡面傾斜及墻背有摩擦時的坡面應力佈、面板背土壓力的佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  11. 2. in order to meet the real - time simulation and guarantee specified ratio of precision, this paper had simplified and supposed some thermal process in module and use the lumped parameter way to model. for some special components, such as furnace cavity or water screen, had been reached good ratio of precision of simulation by divided into three parts ( upper area, intermediate area and lower area ) to model separately because of the huge difference of heat loading in vertical direction

    2 、為滿足實時模擬的要求而同時要保證有一定模擬精度,本文對模型做出了一定的假設和簡化,並且主要採用集總參數法進行建模,對於一些特殊部件,比如爐膛和水冷壁,由於其直方熱負荷差異較大,本文將其為上、中、下三個域,別採用集總參數建模,達到比較好的模擬精度。
  12. Lastly, two axially loaded bored piles in some building site near xichang city was calculated with the method and some useful data and curves including load - settlement curves and distribution of friction resistance etc. are presented. the accordance between the results of calculation and in - situ test verifies the validity of the method developed in the paper

    通過計算,得到相應的荷載?沉降曲線、軸力圖、樁側阻力圖、塑性、土的位移等值線、樁的滑移過程等結果,並與現場試驗結果吻合較好,說明用本文方法計算析樁基的工作特性是可行和有效的。
  13. At the same time it has the shortcoming of complex mechanics analysis. in this thesis we mainly discuss the structure behaviors of the mega structure. firstly considering the differences between mega - frame and normal - frame, that is the influence of rigid zone and shearing type deformation are considered. a computer program for calculation of mega - frame structures based on element stiffness matrix to members with rigid zone considering shearing type deformation has been written and some of mega - frames have been calculated by using the program

    首先,根據巨型框架與普通框架的主要別,採用帶剛域桿件考慮剪切變形時的桿單元模型,利用fortran語言編制了巨型框架結構線彈性有限元靜力析程序,並利用該程序對多個巨型框架結構進行了計算,析了巨型框架結構的靜力性能,深入研究了結構在荷載和水平荷載作用下的傳力機理、力學特性和變形特點。
  14. Because of the abundant upright texture characteristics of the plate area, the algorithm of improved image difference and the algorithm of finding the lowest error limit data are employed as first disposal

    基於車牌域具有豐富的直紋理的特點,本文首先採用了改進的橫法和最小誤差閾值法對去除過背景的多車牌圖像進行預處理。
  15. At first, this thesis analyzes the main causes in theory, which have effects on the redistribution of internal force and modulation of moment for the bonded post - tensioned partially prestressed concrete frame ( for short prestressed frame ), including the relative height of compressive zone of section ( ), secondary moment and types of load applying. then, this thesis analyzes the test of prestressed frame. then, a method, called curvature - force method, for nonlinear analysis of prestressed frame is put forward

    本文首先從理論上析了影響后張有粘結部預應力混凝土框架(簡稱為預應力框架)內力重佈和彎矩調幅的主要因素,即相對受壓高度、次彎矩和加載方式等,並初步析了兩榀只加荷載和兩榀既加荷載又加水平荷載的單層單跨預應力框架靜力加載的試驗。
  16. This paper discusses on the necessity of making the vertical division for the high - rise buildings, probes into some key problems in the vertical division of the water - supply system, and discusses on the features of three kinds of water - supply modes

    論述了高層建築進行豎向分區的必要性,探討了給水系統進行豎向分區的關鍵問題,並對3種給水方式的特點進行了論述。
  17. The paper gave 10 basic modes of water supply according to vertical division block and the key equipment in the block division, and it also discuss the performance of every mode. the modes can be expanded and fit together in the practice of engineering according to the difference of buildings " construction

    豎向分區採用得的關鍵設備將給水方式成了10種基本形式,討論了每種形式的性能,在實際工程中可根據建築物結構的不同進行組合和擴展。
  18. The comparisons of the results in the analysis of the ii devised program and the ansys software and the code gbj7 - 89 show that the finite numerical method used in the paper can combine the analyses of the bearing capacity and the settlement of the foundation at the same time and can obtain the nonlinear settlement of the foundation under different load grade and the development of the soil plastic zone and the ultimate bearing capacity of the foundation and can imply the practical mechanism of loaded soil below the shallow foundation under the vertical load

    在兩類地基情況中均對本文程序、 ansys有限元軟體、規范gbj7 - 89的計算結果進行了比較,結果表明,本文的有限元數值析方法可將地基的沉降及承載力析結合起來,可求得各級荷載下地基的非線性沉降變形、地基土體塑性的開展情況和地基的極限承載力,能反映荷載作用下淺基礎地基的實際工作機理。
  19. 2. for frame supported double - short - pier shear wall under vertical loads, the non - noding area of transfer beams turns into a member of flexure and tension with small axial force, and bending stress dominates in the stress distribution on the cross - section. in the nodding area, the axial force increases while the bending effect is small

    2 、框支雙肢短肢剪力墻在荷載作用下,轉換梁的非節點為一拉彎構件,軸拉力較小,截面的應力佈以彎曲應力為主;在節點,軸拉力效應增大,而彎曲效應很小。
  20. Analyses of horizontal and vertical alignment options for the cwb conclude that the extent of reclamation for the cwb under the criii is the minimum required. - the cwb within the criii satisfies the court of final appeal s " overriding public need test "

    -中環灣仔繞道橫定線方案析的結論是,中填海第三期工程中供興建中環灣仔繞道的填海范圍是所需的最小范圍。
分享友人