豎墻 的英文怎麼說

中文拼音 [shù]
豎墻 英文
straight wall
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : 名詞(磚、石等築成的屏障或外圍) wall
  1. The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on

    報告給出了復雜斷面上波浪爬高和越浪量的計算公式,計算中考慮了前灘、邊坡糙率、邊坡坡度、平臺、波浪入射角以及豎墻等因素的影響。
  2. The regularities of pile - top reaction distribution, the carrying load ratio between pile and raft, the settlement and the imparity settlement of foundation in the frame - tube structure and the single wall are influenced by some factors such as the stiffness of the superstructure, the intensity of the soil under the piles, the length and radius of the piles, the distance between the piles, the thickness and the suspended width of the raft

    向荷載作用下的空間筒中筒結構、樁筏基礎和地基進行了三維有限元分析。研究整體結構和單片結構在上部結構剛度、樁端土強度、樁長、樁徑、樁距、筏板厚度、筏板外挑寬度等影響因素變化時的樁頂反力分佈規律、樁筏荷載分擔比、樁基沉降和差異沉降規律。
  3. Well, while things stood thus, suddenly the hispaniola struck, staggered, ground for an instant in the sand, and then, swift as a blow, canted over to the port side, till the deck stood at an angle of forty - five degrees, and about a puncheon of water splashed into the scupper holes, and lay, in a pool, between the deck and bulwark

    就在這種情況下,伊斯班裊拉號突然一震,搖搖晃晃沖上淺灘,船底擦到了沙地上,船身迅速地向左舷傾斜,直到甲板成四十五度角了起來,大約有一百加侖的水從排水孔涌進來,在甲板和舷之間形成了一個水池子。
  4. Construction of retaining wall no. 36 near cheung sha

    鄰近於長沙設擋土編號36
  5. The wave forms of the glass building are highlighted by a series of extruded aluminum brush finish mullions, following the vertical, curvilinear shape on the north and south facades

    波浪式的玻璃建築上是層層凸起的鋁刷框,緊接南北面的垂直曲線。
  6. I was so amaz d with the thing it self, having never felt the like, or discours d with any one that had, that i was like one dead or stupify d ; and the motion of the earth made my stomach sick like one that was toss d at sea ; but the noise of the falling of the rock awak d me as it were, and rousing me from the stupify d condition i was in, fill d me with horror, and i thought of nothing then but the hill falling upon my tent and all my houshold goods, and burying all at once ; and this sunk my very soul within me a second time

    完成圍后的第二天,我幾乎一下子前功盡棄,而且差點送命。事情是這樣的:正當我在帳篷後面的山洞口忙著幹活時,突然發生了一件可怕的事情,把我嚇得魂不附體。山洞頂上突然倒塌下大量的泥土和石塊,從巖壁上也有泥土和石頭滾下來,把我在洞里的兩根柱子一下子都壓斷了,發出了可怕的爆裂聲,我驚慌失措,全不知道究竟發生了什麼事,以為只不過像上回那樣發生了塌方,洞頂有一部分塌了下來。
  7. The study was focused on the deformation of the retaining wall and the internal forces in the reinforcements and the object of study included the effects of the vertical excitation, the reinforcement length, the reinforcement spacing, the weight of the facing blocks, the frictions between soil and facing blocks as well as those between two facing blocks

    研究內容包括向地震影響、加筋長度、加筋層間隔、面板預制混凝土塊重量、面板與填土界面摩擦角、預制混凝土塊之間摩擦角等對加筋土擋變形、加筋層內力等的影響。
  8. It was so like smith s work, so much more like the top of a strongly spiked wall than a head of hair, that the best of players at leap - frog might have declined him, as the most dangerous man in the world to go over

    那與其說是頭發,倒不如說像是某個鐵匠的傑作,更像是滿了鐵蒺藜的頂,即使是跳田雞的能手見了也只好看作是世界上最危險的障礙,敬謝不敏。
  9. He shall recount his worthies : they shall stumble in their walk ; they shall make haste to the wall thereof, and the defence shall be prepared

    亞述王召集他的權臣,他們碰碰跌跌而來,急急忙忙走上城起了防禦的擋牌。
  10. Though much progress has been achieved in previous study, there still remains a lot to be studied and perfected. the thesis is devoted to study on the multi - ribbed slab wall, the main bearing member in mrss, including its mechanism, failure mode, aseismic capability, mechanical models, ultimate bearing capacity and aseismic design based on control. the paper mainly accomplished such work as follows : 1 ) based on test research on multi - ribbed slab wall, the paper proposed the member ' s failure modes under horizontal loads, analyzed the co - performance between the inner frame and the infilled silica bricks and that between the slab and the outer frame, discussed the wall ' s bearing capacity, rigidity, deformation, ductility and energy dissipation ability in different modes, and put forward a simplified mechanical model of the slab wall under vertical loads

    本文針對密肋壁板結構的主要受力構件? ?密肋復合體為研究對象,就其受力機理、破壞模式、抗震性能、三階段力學模型、極限承載能力以及基於控制的抗震設計方法等進行了較為詳細的研究,完成的主要工作有: 1 )通過對密肋復合體在水平低周反復荷載和單調荷載作用下的試驗研究,提出了體的主要破壞模式;分析了框格與內部填充砌塊、板與外框的共同工作的受力特點;探討了不同破壞模式情況下體的承載能力、剛度、變形、延性、耗能等抗震性能,並給出了向荷載作用下密肋復合體的簡化力學模型。
  11. The wattle wall was set up in a semicircle to give shelter from the north, propped up by stakes, and before it was built a camp - fire

    八連拖來的籬笆朝北面立成半圓形,用槍支撐住,前生起了火堆。
  12. Between " raising the frame " and " building the walls " you might need to insert " adding the insulation.

    譬如,在「起框架」和「建造壁」這兩個任務之間可能需要插入「添加隔離層」任務。
  13. Tracing it to its source, he discovered it to be caused by a sudden extraordinary rising and stiffening of all the risen and stiff hair on mr. cruncher s head

    說到這兒羅瑞先生發現上出現了一個奇特的魔影,順眼看去卻發現是克朗徹先生。他的頭發全都倒起來了。
  14. The vertical spread of fire along the external wall is affected not only by the building - height and window dimensions, but also by the protrude components such as balcony, windowsill and fireproof eave, etc. the balcony is an important part of buildings and used widely

    火焰沿外直向上的傳播速度,不僅要受到建築高度、開窗尺寸的影響,而且還受到外凸出構件,如陽臺、窗臺、防火挑檐等因素的影響。陽臺是建築物的重要組成部分,運用普遍。
  15. It ' s an ideal structural system and has multi - earthquake resistance ability because of a great deal of slabs removed in floors above the transfer - story amended the lateral stiffness of the stories near the transfer - story. based on the available references, the five - spring line element, the three - spring line element and the multiple vertical - line - element model are introduced to model special column, beam and shear - wall, the relevant stiffness matrixes are deduced and the restoring - force models are gaven to deep into the elasto - plastic seismic characteristics of the structure. acording to the results of shaking table test and elastic finite element analysis, a new making model melhod is presented in which uses the linear and the nonlinear element and the assumption that the floor is infinitely rigid in different areas

    為進一步研究這種復雜高層建築結構的彈塑性性能,本文在國內外現有研究的基礎上,提出利用五彈簧桿元、三彈簧桿元及多線單元模型分別模擬空間柱、梁和剪力,推導了相應的剛度矩陣並給出了恢復力模型;結合試驗研究和精細有限元分析的結論,提出線性和非線性單元相結合,剛性樓板假定和彈性樓板相結合的建模方法,較好地解決了空間結構彈塑性分析中佔用計算機資源較多的問題;接力大型有限元分析程序? ? ansys ,在上述建模思路的指導下建立了結構的空間非線性分析模型,進行了空間三維彈塑性時程分析。
  16. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續是一種歷史較短的施工方法,目前,砼防滲的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續與樁在向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲的應力、位移進行有限元分析,並與普通混凝土防滲計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲的安全程度。
  17. A quarter of an hour later he stopped before a large cabin, adorned with several clusters of streamers, the exterior walls of which were designed to represent, in violent colours and without perspective, a company of jugglers

    一刻鐘后,他來到一個很大的馬戲棚門口。棚上著一排排花花綠綠的旗子,壁外面畫著一些雜技演員的肖像,這些畫像都毫無立體感覺,但是色彩卻非常鮮明醒目。
  18. It is necessary to carry on abnormal design, that is to disposal transfer floor structure where vertical structure changes. upside smaller room and downside larger room to stagger axes of high - rising buildings. or upside shear - wall and downside frame to meet difference of structure systems

    當高層建築下部向結構體系或形式與上部樓層差異較大,或者下部樓層向結構軸線距離擴大或上、下部結構軸線錯位時,就必須在結構改變的樓層布置水平轉換層結構,進行「反常規設計」 ,將上部布置小空間,下部布置大空間;上部布置剛度大的剪力,下部布置剛度小的框架柱,以滿足建築功能的要求。
  19. When the deviation between the placing position and construction reference line of caisson for gravity wharf is big enough, the verticality of upper structure, i. e. crest wall will be affected, and furthermore the visual quality of the wharf will be influenced

    摘要重力式碼頭沉箱安裝的位置與施工準線的偏差過大,會影響上部結構胸直度,進而影響到碼頭觀感質量。
  20. Here, mr. lorry perceived the reflection on the wall to elongate, and mr. cruncher rose and stepped forward. his hair could not have been more violently on end, if it had been that moment dressed by the cow with the crumpled horn in the house that jack built

    此時羅瑞先生看到上的人影拉長了,克朗徹先生站起身子走上前來,頭發筆直地聳起,即使他那時叫傑克造的屋裡的那頭母牛下垂的角頂了個跟頭,他的頭發也不會得比現在更直了。
分享友人