豎設 的英文怎麼說

中文拼音 [shùshè]
豎設 英文
erected
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  1. Construction of retaining wall no. 36 near cheung sha

    鄰近於長沙豎設擋土墻編號36
  2. After a no overtaking sign and until the end of the ban. you must not overtake

    豎設了禁止超車的標志至禁制超車不再生效的一段路。
  3. Erection of temporary bridge crossing for stream 25 near pak kung au

    遴近於伯公坳豎設橫渡河流編號25的臨時橋
  4. Erection of a 432m long noise semi - enclosure and noise barrier ; and

    豎設432米長的半封閉式隔音罩及隔音屏障以及
  5. For example, before the commencement of construction works, the contractor of a project is required to carry out a tree survey to identify the number, condition and species of existing trees, and implement protective measures

    舉例來說,承建商須在施工前進行樹木調查,確定現有樹木的數目、狀況和品種,並須豎設保護措施,以及定期就樹木狀況提交監察報告。
  6. Erection of the temporary bridge crossing for stream 33 32

    豎設橫渡河流編號32和33的臨時橋
  7. Erection of the temporary bridge crossing for stream 26 near pak kung au

    鄰近於伯公坳豎設橫渡河流編號26的臨時橋
  8. Continuation of erection temporary bridge crossing for stream 25 near pak kung au

    繼續鄰近於伯公坳豎設橫渡河流編號25的臨時橋
  9. Erection of noise barriers and provision of associated civil, structural, electrical mechanical, geotechnical, utility, landscape and drainage works, fire services, waterworks, street lighting, traffic aids and directional signs

    豎設隔音屏障進行相關的土木結構機電土力公用施環境美化和排水渠工程,安裝消防備,並置街道照明施輔助交通備及方向指示標志。
  10. D erection of noise barriers and low noise road surfacing ; and

    D豎設隔音屏障,並鋪築減音路面以及
  11. Construction of retaining wall no. 37 near pak kung au

    鄰近於伯公坳豎設擋土墻編號37
  12. Construction of retaining wall no. 35 near cheung sha

    鄰近於長沙豎設擋土墻編號35的工程
  13. Erection of temporary safety fence at zone 1

    於1區豎設臨時防護網
  14. Continuation of construction for retaining wall no. 45 at cheung sha

    繼續于長沙豎設擋土墻編號45
  15. Continuation of construction of retaining wall no. 36 near cheung sha

    繼續鄰近於長沙豎設擋土墻編號36
  16. Erection of footing formwork for retaining wall no. 45 at cheung sha

    于長沙豎設擋土墻編號45的基腳模板
  17. Continuation of construction of retaining wall no. 01 near lung tseng tau

    繼續鄰近於井頭豎設擋土墻編號01
  18. The traffic sign waiting at yellow hatched marking area will be prosecuted without warning was first erected in late 1999 along laybys or sections of roads with very busy vehicular traffic and serious traffic congestion problems caused by illegal parking

    自一九九九年年底起,運輸署在交通非常繁忙而違例泊車引致交通嚴重阻塞的路段或停車處,豎設有在黃色影線區內停車等候將會被檢控而不予警告字眼的交通標志。
  19. Ancillary works including drainage, geotechnical, landscaping works, construction of watermains and installation of fire hydrants associated with the road widening works, and the construction of noise barriers and retaining walls and installation of traffic control and surveillance system

    進行附屬工程,包括進行渠務工程土力工程環境美化工程水務工程安裝消防栓和豎設隔音屏障和護土墻及配置交通控制及監察系統。
  20. Construction of retaining wall no. 36 near cheung sha is nearing completion

    鄰近於長沙豎設擋土墻編號36的工程將近完成
分享友人