負后電位 的英文怎麼說

中文拼音 [hòudiànwèi]
負后電位 英文
nagative afterpotential
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  1. The chip simulation network laboratory system this paper disguessed is a distribute network simulation system based on lan. the system ' s architecture is a c / s of three lays. the front platform are the chip simulation network system application program terminer ; the middle lay is a dcom server, it ' s duty is to deal with the communication and data transmission between the terminer and then database server, and to execute the logical operation. the application program just connect with the middle lay and get data from it, the connection and operation with database server will be managed by the dcom server. the duty of database server is to access and backup the final data

    具體是由於網路各個終端的晶元模擬網路實驗系統應用程序為前臺;中間層為dcom應用程序服務器,責處理前臺應用程序與臺數據庫的通信和數據傳輸,並執行業務邏輯,前臺應用程序只需要與應用程序服務器建立連接,在中間層操作數據即可,與臺數據庫的連接和操作由應用程序服務器來統一管理操作。臺數據庫只責數據的存取操作。本論文實施的晶元模擬網路實驗系統模擬了主要的邏輯路器件, 8088cpu ,存儲器,寄存器,數據總線,地址總線和控制總線,及其它相關晶元。
  2. The modified copolymer solution has lower surface tension than the unmodified one. by measuring adsorptive content, we find that the adsorptive content of fdn superplasticizer is higher than the modified copolymers, but their adsorptive shape on the surface of the cement particles is different. measuring of potential of cement particle indicated that higher potential leads to better dispersibility for used superplasticizer

    通過對減水劑的表面張力、吸附量、 5研究,發現改性的減水劑均比未改性的共聚物更能降低水的表面張力;茶系減水劑比合成的減水劑具有更大的飽和吸附量,但彼此的在水泥顆粒表面的吸附形態並不相同:減水劑一水一水泥體系具有雙層,加了減水劑的水泥膠粒的性顯著增加,改性產物的性與改性前相比明顯增加。
  3. When will the 5, 000 bonus membership rewards points for online statements activation to be deposited to my account ? after we have verified your activation, we will process the successful activation cardmembers in batch process in the following month. credit amount of 5, 000 points will be shown on online statement after two billing cycles

    當我們於後端驗證閣下的登記無誤,隔月將會將同月份的成功登記名單一起交由責單進行積分轉換,你將于兩個記賬周期子月結單上看見5 , 000積分轉換成功。
  4. First, suppose a source point and a sink point. second, draw a unilateral line from source point to every substation node. the line ' s capacity is set as corresponding substation ' s allowable load value and the line cost is set as the substation ' s unit load cost

    本文通過線性化處理將網架優化模型描述為一個最小費用最大流問題,虛擬一個源點和一個匯點,從源點到各變站節點各引一條單向弧,弧容量為變站允許的荷值,弧費用為變站單荷的費用。
  5. This product acquires engine crank corresponding phase signal and rotating speed signal, which after ecu treatment, are used together with signals collected from other load sensor ( such as shutter location sensor ) to achieve electronic control over engine ignition timing. compared with mechanical ignition timing control, this is more precise and reliable, resulting in optimized performance of engine in oil consumption, exhaust, output and torque

    Fdw465b型噴分器總成採集發動機曲軸相信號及轉速信號,同其它荷傳感器(如節氣門傳感器等)採集到的信號,經控單元ecu計算處理,實現對發動機點火正時的子控制,較之機械式點火正時控制更加精確、可靠,使汽車發動機系統的綜合性能得到較大提高,特別是發動機的燃油消耗率、排放、輸出功率、扭矩等方面都得到較大優化。
  6. This paper put forward the realization method of a kind of multi - function general use inverter system which added other functions based on the independent sine wave inverter, it not only can be used as independent inverter power supply but can be used as an in - support mode ups which realize synchronous with the phase of power grid voltage and realize to switch with power grid mutually, it also can realize three phase ac output by the combination of three synchronous inverters, experiment proved it in this way has a stronger ability of resisting three phase unbalance load

    本文提出了一種基於獨立正弦波逆變器的功能之上復合其他功能而成的多功能通用逆變源系統的實現方法,此系統不僅可以作為獨立逆變源使用,還可以與壓的相同步,作為備式正弦波ups使用,在逆變源和網的相互切換時能做到對載無影響,同時還可以由三臺逆變器進行組合自同步實現三相對稱交流輸出,實驗證明這種方式具有較強的抗三相不平衡載的能力。
  7. During unit startup and load is lower than 15 %, drum level is controlled by feedwater control valve, feedwater pump remains at minimum safety speed ; when load is between 15 % and 25 %, feedwater control valve is closing at fixed speed determined by function module, main motor - operated - valve is opened automatically, control mode of drum level is transferred to feedwater pump automatically and bumplessly ; when load is between 25 % and 50 %, control valve is closed fully, and main motor - operated - valve is open fully, drum level is controlled by one pump ; when load is more than 50 %, first pump is kept in operation, second pump is putting into operation automatically and

    在機組啟動、沖轉及機組並網至15 %荷階段,給水泵維持在最低安全轉速下運行,汽包水由低荷給水調節閥自動控制; 15 %至25 %荷階段,給水調節閥由函數模塊按照一定的速率自動平滑關閉,主給水動門自動打開,汽包水控制方式自動無擾切換為給水泵自動控制;荷在25 %至50 %階段時,給水調節閥已完全關閉,主給水動門已完全打開,水控制已全由單臺給水泵承擔;荷大於50 %,在第一臺給水泵運行的同時,第二臺給水泵自動無擾投入。
  8. This product acquires engine crank corresponding phase signal and rotating speed signal, which after ecu treatment, are used together with signals collected from other load sensor ( such as shutter location sensor ) to achieve electronic control over engine ignition timing, resulting in enhanced performance of engine in oil consumption, exhaust, output and torque

    該產品採集發動機曲軸相信號及轉速信號,同其它荷傳感器(如節氣門置傳感器等)採集到的信號,經控單元ecu處理,實現對發動機點火正時的子控制,使發動機系統的綜合性能得到較大提高(如發動機的燃油消耗率、排放、輸出功率、扭矩等) 。
  9. The 1982 world cup winner was appointed following the calciopoli scandal and was said to be responsible for the complete departure of roberto bettega ? the last surviving member of the now - infamous triade

    1982年的世界盃冠軍成員在話門在尤文任職,同時也被報道說對貝特加(僅存的功勛卓著的尤文三巨頭之一)的離開有主要責任
  10. After load fiow study in each sample, distance to static voltage stability boundary is calculated. when static voltage instability will occur, load curtailment with optimum location and amount is executed

    在每個抽樣樣本執行潮流計算,判斷系統距離靜態壓失穩的距離,當可能發生靜態壓失穩時,執行切荷控制措施,尋找最優切置及切荷量。
  11. Chengdu telecom, the most important telecommunication hub in the southwestern china, has encountered many problems such as redundant personnel, shortage of new business that can grow very fast, low productivity, and rigid operation mechanism that cannot respond to the ever - changing competition, due to the fierce competition, delayed reform and restructuring, and poor administration and management systems

    這些問題的解答已是迫在眉睫。作為西南地區重要通信樞紐? ?成都信,面對紛繁復雜的激烈競爭態勢,由於改革和重組到晚、機制和管理體制相對滯,面臨著人員多、擔重、業務增長點缺乏、勞動生產率低、經營機制不夠靈活,難以適應瞬息萬變的市場競爭形勢等諸多難題。
  12. In the training organized in beijing, shanghai and guangzhou, business manager and senior engineers of vdi department give an in - depth and professional explanation, dozens of business managers from the partners participate in the training. schneider electric and channel partners have conducted a detail communications and discussions on the cabling system and the market cooperation, a great number of partners arrange related person to attend the following cabling training courses to earn more technical knowledge

    在此次三地舉行的培訓上,來自施耐德氣vdi事業部的責人和高級工程師提供了深入、專業的講解,數十合作夥伴業務責人參加了培訓。施耐德氣和渠道夥伴對綜合布線系統和市場合作進行了充分的溝通和探討,相當一部分合作夥伴還紛紛安排相關人員參加了隨的技術專題課程,為向用戶提供梅蘭日蘭infra +這一優質的綜合布線產品以及工程系統服務,建立了很好的業務基礎。
  13. Added rhizobia increased the amount of negative charge and metallo - ion specific adsorbing sites of solid compositions such as mn oxides and organic matter etc. the influences of adsorbing rhizobia by soil on the speciation of heavy metal varied with the metal and the soil and were closely related to the mechanisms of metal fixation by soils

    土壤吸附根瘤菌荷量增加,某些組分如氧化錳和有機質等吸附重金屬的專性吸附點有所增加。土壤吸附根瘤菌對土壤中重金屬的形態影響隨重金屬種類和土壤類型而不同,與重金屬在土壤中的吸持機制有直接關系,當重金屬以沉澱機制為主被土壤吸持時,其形態分佈受根瘤菌的影響不顯著。
  14. As long as all of the low pressure gas and draft switches are satisfied the fuel gas trip system will be unaffected when the 125 vdc power is restored

    應翻譯為只要所有低壓氣體和壓開關保持正確置,當125伏特直流源恢復燃料氣跳車系統不會被影響。
分享友人