負荷容量 的英文怎麼說

中文拼音 [róngliáng]
負荷容量 英文
load capacity
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 負荷 : [電學] load; charge; weight
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    電力預測是供電部門的重要工作之一,準確的預測,可以經濟合理地安排電網內部發電機的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。
  2. Though there are a certain level of counteractive impacts to the market power from the price - differentiation agreement and dynamics of demand, the influence of market power cannot be eliminated ; 3 ) in the electricity market, the market power size is greatly influenced by the supply - demand relationship, extent of concentration, and market collusion

    雖然差價合約和需求彈性對市場力有一定的抑制作用,但並不能消除市場力的存在。 ( 3 )電力市場的供需關系、市場的集中度以及市場共謀的有效性極大地影響著市場力的大小;發電企業的成本和發電的限制在某種程度上也影響著市場力的實施效果。
  3. Should the dba increase the short heap or tune the workload

    Dba是應該增加不足堆的還是調整工作
  4. The overburdened heart may be carrying an extra pressure or volume load.

    過重的心臟,可能承擔額外的壓力
  5. And a solve scheme is presented, controlling the voltage of 220kv power network in chongqing under 232kv during low load period. with the increase of load and power supply, the reasonable positions and capacitance of reactive power compensation become reasonless

    隨著的不斷增加,電源亦隨之大幅度增加,使得原網路中本來合理的補償位置、補償變得不合理,因此有必要重新選擇補償點。
  6. 2 ) linking the classical control theory with practice, it tries drawing a sententious and practical conclusion by optimization. correctness is proved by emulation with robust toolbox of matlab. 3 ) in view of the complicacy of the circuits, it optimizes reactive compensation by equivalent area theorem and programs by c. it has been used in practice and gets good benefit

    2 )結合多年工作經驗和一些經典控制理論對幾種典型網路的補償、補償位置進行優化,尋求比較實用、可行的結論,並對其進行基於matlab的模擬,證明其正確性、可行性,使其具有更廣的應用性。
  7. The vascular bundle has a similar spikelet number load and sink load in the hphr and shanyou 63

    重穗型組合的維管束穎花、總庫均與汕優63相當。
  8. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川電網的二灘水電站和500kv輸變電系統投入運行后,由於二灘水電站的大電力遠距離輸送至中心,迫使中心的火電機組在豐水期大停機,使中心失去電壓支撐,大大降低了電網的電壓穩定水平;同時,因為四川電網中的無功補償裝置全為靜態無功補償電器(或電抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和電壓支撐的作用,而在電網出現事故時,不但不能起到電壓支撐作用,反而會促使電網電壓崩潰事故的發生。
  9. Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district

    鼎湖區主要依靠廣東省大電網供電,全區擁有4個11萬伏輸變電站和一家首期3000千瓦的火力發電廠,總供電能力超過7500萬千瓦,日達1 . 5萬千瓦時。區內代電網路齊全,供民線路覆蓋城鄉。
  10. This paper, based on the electric policies of some city, compares in aspects of the capacities and electric powers of main equipment, initial investment, annual operating power costs and the economic analysis of ice storage air condition with normal air condition in different quantity of the storage - ice

    本文鑒于某市的電價政策,通過計算某工程的設計日及全年空調,得出各自所需的設備及電功率大小,分析比較了初投資及年運行電費等,並按不同的設計日對此工程進行了不同蓄冰時的經濟分析比較。
  11. The axial flow type turbines are available for hydrauric power resources of medium and low heads. ganfa manufactures both the propeller type fixed blade type and the kaplan type adjustable blade type turbines. the propeller type turbines are suitable for hydropower stations with small or medium capacities and heads, and relatively stable loads. the kaplan turbines are suitable for hydropower stations with medium or large capacities and heads, and relatively unstable loads

    軸流式水輪機適應于開發中低水頭水力資源。我公司生產的軸流式水輪機按轉輪結構分為定槳zd轉槳zz兩種,定槳式一般適用於中小及水頭變化較小的的水電站轉槳式多用於大中型電站及水頭變化較大的水電站。
  12. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,抽水蓄能電站的效益與電網的水平、曲線形狀和常規水電的比重有關,而節煤效益除與水平、曲線形狀有關外,還與電網的電源結構、火電機組的動力特性有關。
  13. Now the affect and the measure of hypo _ harmonics is in the research. the influence of negative sequence is almost eliminated along with the enlargement of the system ' s capacity and the alternate connection of traction substations. the fixed parallel compensate equipment applied in traction substations consist of a constant capacitor and a constant inductance, so its output is constant

    序電流的問題已經因系統的增大、牽引變電所採用輪換接線方式而基本解決,電力部門實行的「反轉正計」 ,使採用對無功功率固定補償方式由於牽引變化頻繁而出現補償不足或過補償現象,難以達到滿意效果。
  14. Application of high - voltage explosion fuses is very abroad. in addition to protecting the electrical equipment by melting itself, disjunction or close of its tube can also be manipulated by a high - voltage insulative stick under some circumstance, for example, to switch on or off no - load overhead transmission line, no - load transformer and little burden current

    跌落式高壓熔斷器的應用極為廣泛,不僅能保護電氣裝置,在一定條件下還能直接用高壓絕緣鉤棒來操作熔管的分合,以斷開和接通空載的架空線路、小空載變壓器和小電流。
  15. Building non - point source pollution spatial database of the three - gorge reservoir area can not only know about the background, status and rule of non - point source pollution and assessing non - point source critical area and calculating pollution load but also provide the scientific dependent for bringing forward quantity control goal and establishing control stratagem of non - point source pollution of the three - gorge reservoir area

    建立三峽庫區農業面源污染空間數據庫不僅可以查清三峽庫區農業面源污染的背景狀況、現狀、規律和三峽水庫水體污染現狀及其,進行危險性評價,確定三峽庫區水體的污染,而且可以為提出三峽庫區面源污染物總控制目標並制定三峽庫區農業面污染控制戰略提供科學依據。
  16. Represents solutions to air conditioning system demand of rooms with different functions at the same time, and to the request for cooling capacity and continual operation in air conditioning system of the telecom industrial room, and takes into account the emergency ventilation after gas extinction

    設計解決了多種功能房間對空調系統的需求問題,滿足了電信工藝機房對空調系統負荷容量及不間斷運行方面的要求,同時考慮了工藝用房在氣體消防后的事故通風問題。
  17. Under certain soc, the inner pressure will increase non - linearly with the increase of the ratio of positive capacity to negative capacity

    在相同電態下,隨著ni / mh電池正比的增大,電池內壓會逐漸上升,但是非線性的增大。
  18. Under certain ratio of positive capacity to negative capacity, the inner pressure presented linear relation to soc after 30 cycles. based on this conclusion, the inner pressure can be a parameter or behavior the soc of ni / mh directly

    研究發現d型ni / mh電池在正配比確定的情況下,電池循環30次之後, ni / mh電池的內壓與電態間是存在著一定關系,隨著電池電態的增大,電池內壓線性增加。
  19. Load capacity overload point

    負荷容量
  20. With the broad application of the electrical and electronic technology in the industry branches and the power apparatuses, the number of non - linear loads is much more and more, and the capacity of them is biggish, so a mass of harmonic is injected into the power system, which produces the waves of voltage and current in power system to be aberrant seriously

    隨著電力電子技術在各工業部門和用電設備上的廣泛應用,非線性越來越多,也越來越大,諧波大注入電網,使電力系統電壓、電流波形發生嚴重的畸變。由於大多數儀器、儀表是針對工頻正弦波設計的,因而造成指示數據不正確。
分享友人