負荷測量裝置 的英文怎麼說

中文拼音 [liángzhuāngzhì]
負荷測量裝置 英文
load-measuring device
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 負荷 : [電學] load; charge; weight
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. 2d - cad, 3d - cad cae, injection molding machines, 3dmeasurement machines, ultrasonic welding machines, high - frequency electromagnetic welders, hot stamping machines, silkscreen printing devices, caulking machines, automatic screw machines, det raw material - exclusive dryers, load testers

    2d - cad , 3d - cad cae ,射出形成機, 3維機,超聲波焊著機,高頻電磁電焊機,熱沖壓機,絲印刷,鉚合機,自動打釘機, det原料專用乾燥試驗機。
  2. It satisfies the requirements of china standard ( gb / t 14549 - 93 ), the harmonic and negative sequence component leaded by the input of electrified railways traction load are measured in si yan qiao substation. this thesis mainly analyzes the effects on the electric elements, feeding system losses, protection system and automatic device, and proposes corresponding schemes according to the problems occurring in si yan qiao substation

    本文實了瀘州石燕橋變電站電氣化鐵路牽引注入電網的諧波和序分,著重分析了電力系統中電氣設備、供電網線損、繼電保護和自動受電氣化鐵路諧波和序的影響,並針對石燕橋變電站出現的問題提出了對策。
  3. It is necessary to study the mechanism of harmonics generation, make sure the content and distribute of harmonics current in order to alleviate their harm to traction power system ' s component, equipments of protect and measure as well as other customer ' s electronics equipments

    為了從根本上抑制電力牽引諧波帶來的影響,削弱諧波對牽引供電系統主元件、保護和其他用戶電子設備的影響,有必要研究電氣化鐵道牽引諧波產生的機理,確定饋線電流諧波的含與分佈狀況。
  4. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 2 - 24 : tests - screen testing of ceramic alignment split sleeve by stress application

    光纖互聯和無源部件.基本試驗和步驟.第2 - 24部分:試驗.對陶瓷校直夾板套筒加的篩析試驗
  5. Railway equipment in general. measurement of the static loads per each wheel of the vehicles. weighing installations and control

    鐵路通用設備.車輛每個車輪靜態.稱重設備和控制
  6. The automatic real load error measuring equipment is divided into two parts : the one is a chip microprocessor controller which is the core of the measuring equipment and which controls and manages the whole system ; the other is controller case. it accepts orders of the chip microprocessor controller and functions as the performing system

    互感器誤差自動在結構上分為兩部分,一部分為單片機控制器,它是整個的核心部分,責完成整個系統的控制以及管理功能;另一部分為控制櫃,它接受單片機控制器的命令,完成執行機構的功能。
  7. Standard test method for deflections with a falling - weight - type impulse load device

    落重型脈沖彎曲性的標準試驗方法
分享友人