負荷系數 的英文怎麼說

中文拼音 [shǔ]
負荷系數 英文
load factor
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 數副詞(屢次) frequently; repeatedly
  • 負荷 : [電學] load; charge; weight
  • 系數 : [數學] coefficient; ratio; modulus; quotient; factor
  1. Engine load simulated control system was consisted of two unattached parts of work resistance simulated control subsystem and electric bow wave dynamometer control subsystem. with the mathematic models of engine load simulation controller, which transferred the work resistance ' s change to engine load change immediately, the system can met the need of the simulation control system

    發動機模擬加載控制統包括彼此獨立的作業阻力模擬控制子統和電渦流測功機控制子統兩部分,應用發動機模擬控制器學模型,使作業阻力的變化及時轉換為發動機的變化,能夠滿足模擬統的控制要求。
  2. Finally, with caparisons of that three parapets properties cantilevered parapets has been adopt to the steel structure of light - weight buildings with gabled frames, numerical simulations have been carried out with that buildings, results of simulations show that device can also significantly reduce the area - averaged coefficient of wind pressure and high negative suction peaks on zones susceptible to wind pressure. formula has been proposed about the height of that parapet

    最後通過三種女兒墻的性能比較確定對門式剛架設置懸挑女兒墻進行值模擬,結果同樣表明懸挑女兒墻能明顯地降低門式剛架屋面風載敏感區的壓峰值及屋面風載體型,並給出了女兒墻高度限值公式。
  3. In the research, a set of simulation equipment is developed to examine the drivers " static and dynamic fatigue. recur to the apparatus, contrast and control experiment are made among different ages, workload intension and workload factors group. the endings summarize as following : ( 1 ) driving sensation fatigue investigation ( investigation of psychological and physiologic index and contrast investigation of fatigue ) ; continuous driving load and discrete driving load investigation of fatigue

    ? ?門)駕駛疲勞平衡穩定性是通過在力檢測臺上描繪人體重心軌跡的方法,提出檢測駕駛員疲勞平衡穩定指,在不同狀態下(傾斜度15 30 『以及閉目等狀態下)對不同、不同年齡分別進行測試,建立駕駛疲勞客觀測試評價體; n )經實驗室研究與現場調查,通過對駕駛疲勞與駕駛時間、駕駛速度等關的研究,提出了不同年齡、不同條件下的最大連續安全駕駛時間標準,日駕駛時間標準,最大安全行車速度標準等。
  4. In addition, curves of energy margin ( em ) calculated at different load shedding show the numerical relation between em and shedding power

    研究了修正能量函裕度與切量的相互關
  5. The main hardware is the collection equipment, the software is the windows dna framework, distribute calculate resolves the problem of data server down because of heave calculate mission. system provides the mis sub - system base on ie, which make data - query and report forms not limited by the special network. the new module, standard interlink module is aimed at the problem of not pluralize between different system, can make system utility in administrative levels

    統有硬體和軟體組成,硬體的基礎是採集裝置;軟體採用windowsdna構架,使用分散式計算,解決了原來統的計算任務過于繁重造成據服務器不能承擔的問題;服務方面提供基於ie的mis統,使據查詢和報表服務擺脫了原來的專用網路的限制;新增加模塊「標準互連」模塊是針對目前各種自動化統不兼容的問題而產生的,可以實現電力自動化在更高層次上的實現,在這個模塊中,有意識的採用
  6. This paper also tested each model and system - the second loop of qinshan nuclear power station ( the second term ) , computed the balance point , tested the performance of step disturbance and runback loads for system ( no adding adjustment system ) , analyzing the factors effecting the first tiptop rotate speed of turb and time which the rotate speed reach the tiptop

    在模擬模型上,完成了穩態計算、統階躍擾動試驗、甩試驗(未加調節統)等測試,主要監控和分析了汽輪機動態特性中兩個重要參:汽輪機第一飛升轉速、飛升時間。
  7. In consideration of multitype risk in the operation of insurance companies, this paper studies some important variables in insurance business and then comes to the conclusion that the surplus process is related to safe load and individual claim amount distribution when the preliminary reserve is zero while the surplus process is related to adjustment coefficient when the preliminary reserve is beyond zero

    摘要考慮到保險公司同時經營多種不同質風險的情況,本文從保險業務中需要研究的幾個重要變量出發,研究了初始準備金為零時,盈餘過程與安全及個體索賠額分佈有關;當初始準備金大於零時,盈餘過程與調節相關等情形。
  8. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  9. Suction gas pressure goes up as the compressor run at the lower speed in the lower burthen, and this is beneficial to lower systems energy - consume. when the system is controlled by wvf, the discharge change of the evaporator is not linear ; the electronic expansion valve is adopted to regulate the system superheat degree, and the controlled object is parameter time varying, accordingly, the time varying controller should be adopted

    較小時,壓縮機採用低速運轉,吸氣壓力升高,這對統降低能耗是有利的;變頻控制時,蒸發器製冷劑流量的變化並非線性;統中採用電子膨脹閥進行過熱度控制,被控對象具有參時變的特性,相應地宜採用變結構的控制器。
  10. Using the opened thermosiphon of 38x3 as experimental element and water as working fluid, the characteristics of dynamic low load boiling, stable severe boiling heat transfer coefficient and critical heat flux are gotten for the opened thermosiphon at the pressure of 0. 02 - 0. 1mpa and 0. 1 - 0. 8mpa respectively, which makes up the drawback that the opened thermisiphon has not yet accurate boiling heat transfer relationship formulas. by means of experimental results, an opened thermisiphon waste heat recovery boiler is designed for the high temperature gases that the positi e electrode copper refining furnace exhaust, which overcomes effectively the drawback of short life, little capacity and unable to inspect that the closed steel - water thermosion has

    本文以工程上常用的38 3的開口封底為實驗元件,以水為工質,對開啟式熱管內的動態低沸騰、穩態旺盛沸騰及臨界沸騰特性進行統的可視化實驗研究,實驗壓力為0 . 02 0 . 8mpa ,實驗得出了38 3的開口封底管在工作壓力為0 . 02 0 . 8mpa和0 . 1 0 . 8mpa下的管內沸騰傳熱及臨界熱計算關聯式,彌補了開口封底管? ?這一新型傳熱元件尚無準確的沸騰換熱關聯式的缺陷。
  11. When cooling load is less than ice - melting ability, optimal control strategy is just ice priority, optimal control saves 24 - 45 % operating cost compared with chiller - priority. when cooling load is more than ice - melting ability but still less than ice - melting ability plus half of chiller cooling ability, optimal control is to keep chiller load to half of chiller cooling ability and tune ice - melting to meet load, optimal control consumes 13 - 20 % more power but saves 9. 2 - 11 % operating cost compared with chiller - priority. when cooling load is more than ice - melting ability plus half of chiller cooling ability, optimal control is just ice - priority again, optimal control is to keep ice - melting to maximum and tune chiller to meet load, optimal control consumes 0 - 13 % more power but saves 0 - 9. 2 % operating cost compared with chiller - priority

    在冷大於融冰供冷最大功率時,又分兩種情況:總冷小於融冰供冷最大功率加一半的單主機滿時,優化控制是保持主機供冷負荷系數為0 . 5 ,通過調節融冰來改變冷,此時與主機優先比較增加能耗13一20 % ,節約運行費達9 . 2一11 % ;在冷大於融冰供冷最大功率加一半的單主機滿時,優化控制就是融冰優先,通過蓄冰槽滿運行,調節製冷主機來調節冷,此時比主機優先控制僅增加能耗o一13 % ,但能節約運行費o一9 . 2 % 。
  12. The numerical results indicate that the deformation within the solid inner core is very small. however, in the fluid outer core, the changes of the displacement with relatively low spherical harmonic degree ( n < 10 ) is very complicated via the radius, due to the resonance near the eigenfrequenies of the core long - period oscillations. while the spherical harmonic degree of the loading is larger than 10, the deformation and the gravitational perturbation in the core are very small, and the earth ' s deformation response is dominantly represented as the radial displacement in the elastic mantle

    研究了地球在日月引潮力和表面作用下的形變特徵,值計算結果表明,在固體內核中的形變很小,由於在長周期核模本徵頻率附近的共振,液核中低階( n 10 )位移隨半徑的變化非常復雜,當超過10時,地核中的形變和擾動位都很小,地球的響應主要表現為彈性地幔中的徑向位移,且隨深度增加急劇減弱,地表love與信號頻率的依賴關很弱,給出了體潮love計算的一種有效的近似處理方案。
  13. Influence of preload factor on the stability of three - lobe journal bearing

    負荷系數對三油楔徑向滑動軸承穩定性的影響
  14. The model of fujian power grid and models of generators, excitation systems, governor systems and loads are established, the tested excitation system models of large hydro and thermal units, the model of wind turbine are established as well in this paper with pss / e, a new software imported from pti of u. s. a. recently. some key points are proposed on data convertion from psasp and bpa to pss / e. the transient and dynamic characteristics between separate excitation system and transformer - fed excitation ( self excitation ) system are compared with pss / e

    本文完成了pss e的福建省電力統的基本框架以及發電機、勵磁統、調速統、學模型和參,實現了大型水、火電廠發電機組勵磁統實測模型和風電機組的pss e建模,提出了pss e與bpa 、 psasp據互轉的部分要點,比較了福建電力統現有大型水、火電廠發電機組它勵與自並勵勵磁方式的動態和暫態性能的差別。
  15. The optimization model of gas supplying / delivering load coefficients and the optimization model of gas supplying / delivering loads proposed in the article can provide the reference to make the gas marketing plan

    文中提出的供用氣負荷系數優化模型和天然氣供用優化模型可為制定天然氣銷售計劃提供參考依據。
  16. It is suggested the gas supplying / delivering load coefficients are used to measure the gas supplying / delivering load features, which has important guiding significance for the engineering design, the gas transmission price making, operation and management etc. of gas pipelines

    提出用天然氣管輸供用氣負荷系數來度量天然氣管輸的供用氣特徵,對一般天然氣管道項目的工程設計、管輸費制訂、經營管理等都有重要參考意義。
  17. Load factor the load factor is the ratio of the average load to the generator set power rating

    負荷系數負荷系數指的是機組的平均與額定功率之間的比率。
  18. The contractor will liaise with the electromechanical contractor and the civil works contractor to confirm tile ( the ) appropriate power rating due to the actual load list. that may be different of ( from ) the value here above

    總承包商應與機電分包商和土建分包商聯核實相應電功率與實際表相符.值可能與上述值有異
  19. The contractor will liaise with the electromechanical contractor and the civil works contractor to confirm [ red ] tile [ / red ] ( the ) appropriate power rating due to the actual load list [ red ]. [ / red ] that may be [ red ] different of [ / red ] ( from ) the value here above

    總承包商應與機電分包商和土建分包商聯核實相應電功率與實際表相符.值可能與上述值有異
  20. In most situations, cooling load calculated by traditional methods is larger than the actual one. concerning with this deviation, coefficient method based on transfer function was investigated in this thesis. the result was used to develop a program for calculation of cooling load

    2 、針對目前國內設計採用的建築物冷計算值比實際冷大、甚至相差成倍之多的問題,對建立在傳遞函上的冷負荷系數法進行了研究,編制了計算程序,計算程序有估算與詳細計算兩種方法。
分享友人