負荷要求 的英文怎麼說

中文拼音 [yāoqiú]
負荷要求 英文
burden requirement
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 要動詞1. (求) demand; ask2. (強迫; 威脅) force; coerceⅡ名詞(姓氏) a surname
  • : Ⅰ動詞1 (請求; 要求) ask; beg; request; entreat; beseech : 求人幫忙 ask sb a favour; ask a favou...
  • 負荷 : [電學] load; charge; weight
  • 要求 : ask; demand; require; claim; requisition
  1. Engine load simulated control system was consisted of two unattached parts of work resistance simulated control subsystem and electric bow wave dynamometer control subsystem. with the mathematic models of engine load simulation controller, which transferred the work resistance ' s change to engine load change immediately, the system can met the need of the simulation control system

    發動機模擬加載控制系統包括彼此獨立的作業阻力模擬控制子系統和電渦流測功機控制子系統兩部分,應用發動機模擬控制器數學模型,使作業阻力的變化及時轉換為發動機的變化,能夠滿足模擬系統的控制
  2. Load box for building materials ; safety requirements

    建築材料用的箱.安全
  3. Boiler is the heat equipment in common use best of all, which can supply qualified steam for the requirement of steam quantity adapting to burthen

    鍋爐是最常用的熱工設備,其是供給合格的蒸汽,使鍋爐產汽量適應的需
  4. Subjects of two groups executed an same incremental ergometer exercise up to exhaustion. after exercise, compared with the natural recovery in the control group, somin hyperoxia ( 70 % oxygen ) was given to the experiment group

    20名體育學院健康男生隨機分為兩組(吸氧組和對照組) ,實驗全體受試者完成一次性遞增運動,運動至力竭,觀察運動即刻和恢復期各指標的變化情況。
  5. They meet the requirements for non - leaded heavy - duty gear lubricants of high load - carrying capacity, including the ux steel 224 gear oil specification

    適合於無鉛的重齒輪的潤滑,符合多種齒輪油標準包括美鋼224規格。
  6. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一情況本文對冶金輔傳用變頻輥道電機的設計進行了系統研究。首先對變頻器和變頻輥道電機的運行特性進行詳細分析,變頻器輸出的電壓波形諧波大,沖擊大,電壓上升率高達6600v / s ,是普通正弦交流電壓的20倍;軋機輔傳輥道對電機提出了十分嚴格的:其運行頻率很低,額定頻率在8 - 20hz ;調速范圍寬,最低運行頻率低到0 . 5hz ,起動次數相當頻繁,每小時高達600 - 800次,沖擊大,過載能力較高。
  7. Finally, we can not use electric power but the engine of bus or subsidiary engine to drive air compressors of bus air conditions. because the change range of turnaround speed of engine is very wide, that brings difficulties in controlling the rate of flow of cold - producing medium. in the control of bus air - conditions, preventing evaporator from freezing to make the air - conditions work with high efficiency and controlling the temperature of railway carriage are the basic tasks in air - condition control

    與一般的建築空調相比,汽車空調的工作環境惡劣,條件差,控制難度增加很多,主體現在以下幾個方面:一是車外熱變化大,難以確定控制參數;二是空調大,而且控制空調使其降溫迅速:三,不便於用電力作為動力源,必須用汽車發動機或輔助發動機來帶動壓縮機,當採用汽車發動機作為動力源時,由於汽車的車速變化大,發動機轉速的變化可從600r min到4000r min ,壓縮機轉速與發動機轉速成正比,其轉速變化高達7倍,給空調系統製冷劑流量控制帶來困難。
  8. Controlling total quantity of discharging of atmospheric pollutant is one effective and scientific management means, which takes controlled areas as one integrated system and adopts some effective means to reducing atmospheric pollutant discharged into the area to certain limitation, it aims at satisfying the quality requirement of atmospheric environment, it can resolve the problem of atmospheric pollution once and for all

    大氣污染物排放總量控制是將控制區域作為一個完整的系統,採取有效措施將排入區域范圍內的大氣污染物總量控制在一定的數量之內,以滿足該區域的大氣環境質量,為大氣污染控制提供了科學有效管理手段,從根本上解決大氣污染問題。
  9. It is discussed that the present harmonic analyzers do n ' t satisfy the requirements of china standard for harmonic measure of quick disturbance harmonic load. the measurement error brought about by the harmonic analyzers adopting ft or fft algorithm is analyzed. a cycle discrete fourier algorithm that should n ' t be effected by aperiodic component is presented, and the results of simulation show that it has higher accureacy

    本文對電力系統諧波的測量方法,數據處理及電力牽引對電力系統的影響進行了研究,論述了目前國內外生產的諧波分析儀用於快速波動諧波的測量不滿足國標的,分析了諧波分析儀普遍採用的ft或fft演算法所產生的測量誤差,提出了一種不受非周期分量影響的全周波離散傅里葉演算法,模擬結果表明精度好。
  10. Based on the theoretical analysis and design practice in successful development of allway desiel engine in china, the design concepts of key parts and components of engine, in particular the cylinder block and cylinder head, are analyzed for meeting the requirements for high performance and low emission as well as normal and reliable operation of diesel engine for medium and heavy commercial vehicle under high combustion pressure and high thermal load

    結合我國自主開發的「奧威」發動機在設計工作中的理論分析與實踐,就低排放中重型商用車柴油機在開發工作中為滿足高性能、低排放的及在高燃燒爆發壓力和高熱下正常可靠地工作,對發動機的關鍵零部件,尤其是缸蓋與缸體的設計概念進行了分析。
  11. ( 3 ) it is known that load effect is not consistent with the section resistance incommon section continuous composite beam. a kind of composite beam with itsrational section size is suggested, which is consist of the t shape concrete beam andsteel girder. this kind of composite beam not only has enough carrying capacity, almost has same positive and negative resistance moment, but can decrease theamount of the steel

    ( 3 )分析可知連續組合梁的跨中、支座截面處載作用效應及截面抗力規律不匹配,本文提出了採用t形混凝土梁和工字鋼代替一般的混凝土板和工字鋼的組合梁截面形式,並給出了截面尺寸比例,能使正截面抵抗矩接近,符合組合梁受力特徵,減少了材料用量,滿足承載力和剛度等
  12. Since the air leakage rate of the air preheaters in waigaoqiao 900 mw units is too high, and the opening of the primary fan stationary blades can not meet the requirement of the unit loads, a retrofit was carried out for the air preheater sealing system in according to the scheme proposed by alstom germany

    針對外高橋900mw機組空氣預熱器漏風率偏高、一次風機靜葉開度不能滿足機組負荷要求這一影響機組運行的安全性和經濟性的問題,依據alstom德國公司提出的改進方案,對該空預器密封系統進行了改造。
  13. To co - ordinate with the management for conducting the sales power according to the manufacturing workload needs for the both satisfaction of the customers and the company

    根據生產與公司管理層協調合理調配銷售力量,同時滿足用戶與公司的
  14. The server is underpowered and cannot handle the workload

    服務器動力不足且不能滿足工作負荷要求
  15. According to the required load characteristic of the power system or the owner ' s demand, the load demand of the hydroelectric plants group is proposed

    根據電力系統的特性或業主的直接,提出對水電站群的負荷要求
  16. The regulation goal and its corresponding regulation method of the hydroelectric plants group are given by analyzing the water inflow characteristic and the load demand to meet the load demand as much as possible

    分析水電站群的來水特性和負荷要求,在盡可能滿足負荷要求的前提下確定水電站群的調度目標,並給出相應的調度方法。
  17. To validate the performance of the system, a series of experiments are made on a 200mw unit simulator of max1000 dcs. the results of these experiments indicate : by following certain physical principles, for each real component of the control system, the mathematical model which is constructed to reveal its characteristics reflects exactly the work and message transfer process ; by considering the load demand to the unit and the electricity net ' s frequency difference, also combing with the real capacity that the unit can stand, the ccs and deh models, which are contrived by using simulation blocks, can exactly harmonize the control of the turbine and the boiler and can also control the load.

    為驗證模型的性能,本文在基於max1000dcs系統的200mw機組模擬機上進行對建立的控制系統模型進行了一系列模擬試驗,試驗結果表明對控制系統的每一實際組件按照一定的物理規律所建立的反映其功能特性的數學模型,正確地反映了其工作過程及信息傳遞過程;利用模擬模塊開發的協調控制系統及功頻電液控制系統模型能夠根據對機組的各種負荷要求和電網的頻率偏差,結合機組所能承擔的實際能力,正確地協調對汽輪機和鍋爐的控制,並對加以控制。
  18. Through analyzing the present operation condition and heat supply respect of the beihai heat power plant which is the largest heat and electricity cogeneration and concentrated heat supply corporation in dalian, a scheme is settled to install a climax load adjustment boiler in the plant

    針對日益增加的熱,對大連市最大的熱電聯產、集中供熱單位?北海熱電廠目前狀況和發展進行了分析,並制定了新增調峰鍋爐房的方案。
  19. The unit coordinated control of coal - fired power plant is essential to the automatic generation control ( agc ). in order to get the fast load response characteristic and the stable main parameters that the power network dispatching center required, we must reconsider the existing unit coordinated control schemes by analyzing the specialty of the coal fired power plant

    燃煤電廠的機組協調控制是機組投入自動發電控制( agc )的基本條件,為了機組能夠迅速響應電網的負荷要求,同時保證機組各主參數保持相對的穩定,必須在進一步分析機組被控對象的特性的基礎上,重新研究現存機組協調控制方案。
  20. Size is too small, the system processing could be too occupied with autogrowing the database to support your workload requirement every time that you start sql server

    的大小太小,則每次啟動sql server時,系統處理可能忙於數據庫的自動增長,而不能支持工作負荷要求
分享友人