負載分佈 的英文怎麼說

中文拼音 [zǎifēn]
負載分佈 英文
load distribution
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • 負載 : [電學] load
  1. It is indicated in the test that the influence of loading to strain in the grout was about in the range of 5 ~ 6m, and very weak beyond 4m. the distributions of strain and bond stress in the grout are attenuated in the minus exponential rule

    試驗結果表明,加對錨固段內的應變影響范圍大致在5 6m左右, 4m以外很微弱;錨固段注漿體內的應變與粘結應力按照指數規律衰減。
  2. However, the distributed components architecture provides high scaling by distributing the whole load to many hosts. this paper, in aii effort to overcome the weaknesses of the traditional b / s architecture, adopts the com + technology of windows 2000 and uses three - layer architecture to improve the performance of the whole system

    本文針對傳統b s體系結構的弱點,利用windows2000中的com +技術,設計三層體系結構,將整個系統的合理到多臺主機,從而提高了系統的整體性能。
  3. So they can not be used in on - line fault detection and condition monitoring. and the explanation of the time - frequency analysis is not easily accepted by the engineers. the experimental factors, such as rotational speed and measured position and fault distribution a

    文中還針對轉速、測點位置、故障(位置) 、等因素對頻譜析、包絡析、時延相關解調等方法的診斷效果進行了大量的實驗研究。
  4. Fire protection, and surveillabce works as follows : electrical : 22. 8kv ; 27, 800kva ; three loading centers located in the power house, factory, and office building ; generator 2 800kw

    電氣: 22 . 8kv供電設備容量三處及配電中心於動力室與廠房發電機容量2800kw ,供緊急使用本配電系統處使用數字式電驛及電表,符臺現代化之電力監控新潮流。
  5. In this dissertation, the beijing downtown area distribution system capability is evaiuated based on fuzzy theory according to the present condition of beijing distribution system. factors considered in this dissertation affecting the capability are including as follows : feeder load rate, voltage offset, network 1oss and n - l analysis. the load allocation in beijing distribution system of downtown area is got, and conclusion of the whole fuzzy distribution capability is reached

    本論文根據北京城區配電供電網現狀,應用模糊數學的方法,對影響配電網的供電能力的各個因素:線路率、電壓偏移、網損和n - 1校驗析進行了評估,得到了北京城區配電網的情況和整個北京城區配電網供電能力的模糊水平。
  6. The numerical method based on the coupling of the finite difference method in time domain with the discrete fast fourier transform is applied to calculate the first four eigenfrequencies and eigenfunctions of the six - cavity with open boundary. the absorbing boundary condition for tem wave is tested numerically, and it is applied to writing the code. the cold testing of the cavity is done and the results are good agreement with the numerical results

    計算x波段六腔開放腔前四個模式的場;根據第二章公式別計算x波段六腔開放腔前四個模式的電子電導並總結了這四種工作模式渡越效應的規律,基於這種小信號理論析了x波段渡越輻射振蕩器,得到了工作模式及可能產生的模式競爭。
  7. This innovation can greatly balance the load of system and dramatically decrease the communication between the distributed checkpoints in the detected network and the central management point

    這種性能夠很好地平衡系統,明顯地減少大型網路入侵檢測系統中散的檢測點與管理點之間的通信量,顯著提高系統運行效率。
  8. No matter with or without flange, the longitudinal strain in limbs roughly coincides with bernoulli ' s principle. 5 based on strain distribution status found in experiments, the internal force evaluation approaches are suggested. then, the structural behaviors are investigated in detail, and the concepts of pl and leffr are introduced

    從墻肢應變研究入手,建立了截面內力計算模型,深入研究了短肢墻結構內力大小及其規律,建立了土墻肢及主墻肢荷效應率等基本概念。
  9. Based on strain distribution acquired in experiment, the internal force evaluation model is set up, then, the structural behavior of slw are investigated in detail. combined with the nonlinear fem results, the structure behaviors are expressed in the concepts of " principal limb " ( pl ) and " load effect bearing ratio " ( lebr ), and the function for lebr determining is put forward, which may be used in the practical section design

    本文進行了國內首例短肢墻結構體系低周反復試驗;基於試驗實測的墻肢應變,擬合了墻肢截面的應變規律,並進行了短肢墻結構內力大小及其規律的析,建立了墻肢荷效應率的數學模型,為實際工程的截面設計創造了條件。
  10. For optical - layering approach, we propose an ant - based algorithm, which uses the ants " capability of finding shortest or near - shortest paths between a food source and their nests, to solve the logical topology reconfiguration problem. we give the ants routing formula based on dynamic load balancing and short path on the assumption that some conditions hold

    前者適合於業務矩陣變化不是太頻繁的網路,提出利用螞蟻演算法解決業務的再路由問題,即利用螞蟻具有找到最短徑及不同種類螞蟻具有互斥的天然特性來進行邏輯拓撲重配置,從而保證了鏈路負載分佈的平衡性。
  11. They are used to control the load distribution system, which is able to perform an active simulation of the weight distribution of several hundred passengers using water tanks

    它們被用來控制負載分佈系統,此系統用來對數百名客戶的重量情況進行實際模擬。
  12. The network nodes will be reconfigured when the algorithm converges to a new pattern. simulation results show that our algorithm has a good effect

    計算機模擬結果表明,利用該演算法進行邏輯拓撲重配置后,鏈路負載分佈的平衡性得到了大大提高。
  13. The goal of " load distribution " is high efficient usage of resources in distributed systems

    負載分佈( loaddistribution )的目標是有效地利用散式系統中的資源。
  14. The workload distribution algorithms used in websphere mq clustering have been extended for more varied configurations

    Websphere mq集群中使用的工作負載分佈演算法已針對更多不同的配置進行了擴展。
  15. The digital interface of tecsis pressure sensors ensures a perfect hook - up to the bus system of the load distribution system

    Tecsis壓力傳感器的數字化介面保證了與負載分佈系統的總線系統構成一個完美的連接。
  16. The subsystem only does one open on the device, but the driver distributes the workload across as many ica devices as are in the system

    子系統僅在設備上打開一個,但是驅動程序將負載分佈到系統中每個ica設備上。
  17. Typically, routing in ip over wdm networks has been separated into ip and wavelength routing sub - problems and have been resolved separately, which result to a bad network load balancing

    基於此,為了在網路中出現單鏈路故障時100地保護受影響的業務,同時保證鏈路負載分佈的平衡性。
  18. If your application architecture prevents you from using the service provider interface or if you need to distribute the database processing load to another machine, you can use derby with the network server

    如果應用程序架構使您不能使用服務提供程序介面,或者需要將數據庫處理負載分佈到另一臺機器上,那麼可以結合network server來使用derby 。
  19. Process management and scheduling, inter - process communication, storage management, parallel control, file systems, transaction, clock synchronization, security mechanism, etc. the research topic of this thesis is " load distribution ", a destination of distributed process management and scheduling

    散式操作系統涉及到多個方面的工作,如:進程管理和調度、進程間通信、存儲管理、並發控制、文件系統、事務處理、時鐘同步、安全機制等。本論文的研究范圍是針對散式進程管理和調度的目標之一: 「負載分佈」 。
  20. Participants declare their qos requirements, including performance and reliability, authorization of requests, encryption decryption of message contents, automatic auditing of service interactions, and how their requests should be routed such as to available implementations based on workload distribution criteria

    :參與方聲明其qos要求,包括性能和可靠性、請求的授權、消息內容的加密/解密、服務交互的自動審核以及如何對請求進行路由(如根據工作負載分佈標準將請求路由到可用的實現) 。
分享友人