負載組合 的英文怎麼說
中文拼音 [fùzǎizǔgě]
負載組合
英文
load combination- 負 : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
- 載 : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
- 組 : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
- 合 : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
- 負載 : [電學] load
- 組合 : 1 (組織成為整體) make up; compose; constitute 2 (組織起來的整體) association; combination3 [...
-
Till now most evs adapt such methods as ocv ( open ciruit voltage detective ), lv ( load voltage detective ), ir ( inner resistance detective ) and ec ( energy cumulation detective )
目前大多數電動汽車採用的電量預測技術包括了開路電壓法、負載電壓法、內阻法、電量累積法以及以上述方法的組合等。The products is of high water hydrophobe device usedin suitable and has the characteristics of aging resistance, resistance, tracking resistance, and corrosive resistance. it can withstand high bent load, strong impact force fn12 - 12 series indoor use high voltage load switch fn12 - 12 and fn12 - 12r is of three phases indoor use ac high voltage load switch for breaking and making the circuit of 50hz, 12kv system under rated loading
Fn12 - 12和fn12 - 12r組合電器是額定電壓12kv額定頻率50hz的三相高壓開關設備用於分合負荷電流閉環電流空載變壓器和電纜充電電流關合短路電流配裝接地開關的負荷開關,可以承受短路電流Finding a feasible and efficient load balanced strategy for the ultra - scalable multi - plane multi - stage switch architecture is a top of nowadays research. the dissertation proposes a two - stage load balanced scheme for the ultra - scalable multi - plane multi - stage switch architecture based self - routing and non - blocking permutation benes network. the approach uses reasonable and efficient logical queueing strategy and schedule scheme in ingress traffic managers and switch planes to realize the two - stage load balancing of ip traffic which for different destination addresses
本文提出一種適用於基於完全可重排無阻塞benes拓撲構建的多平面多路徑(多級)超大容量交換結構的兩級負載均衡策略,通過在輸入流量管理器和benes交換平面內部實施合理而高效的隊列組織調度方法,有效實現了基於不同目的地址的ip流量在兩個層次上的負載均衡,較好彌補了ciscocrs - 1系統在平面選擇和中間級選擇時所採用的簡單隨機或輪循方案的不足。Based on the study of transferring characteristics of the lcc - type resonant voltage, the parameter combinations, which make widths and magnitudes of voltage pulses of resonant network adjustable, arededucedo when the following requirements are met : fn > 3, k > 3 or cp / cs > 8, the above circuit is of natural voltage - stabilized characteristics, thus open - loop control method for bucking voltage is presented and the experimental results verify that the method is feasible.,
實測整機在額定負載時效率達到88以上。在研究lcc諧振網路電壓傳輸特性的基礎上,推導出滿足可變寬度和幅度的諧振網路輸出電壓脈沖列的參數組合。設計f n 3 、 k 3或c _ p / c _ s 8時,諧振網路具有自然穩壓特性,因此本文提出並實驗驗證了一種整機為降電壓時的開環控制策略。Because traffic flow greatly increases in recent years and the rank of actual driving load enhances, causing this bridge to be at the excess load the service condition, so in order to guarantee the bridge ' s transport security, the main body structure of the bridge should be reinforced
摘要長沙市八一路跨線橋由於近年來交通流量大增,實際行車荷載等級提高,使得該橋處于超負荷的營運狀態,為了保證大橋營運安全,需要對此橋的主體結構進行加固,在選擇加固方案時對比了三種加固方法:鋼混凝土組合結構加固方法、混凝土結構擴大截面加固方法、粘鋼加固方法。( 3 ) it is known that load effect is not consistent with the section resistance incommon section continuous composite beam. a kind of composite beam with itsrational section size is suggested, which is consist of the t shape concrete beam andsteel girder. this kind of composite beam not only has enough carrying capacity, almost has same positive and negative resistance moment, but can decrease theamount of the steel
( 3 )分析可知連續組合梁的跨中、支座截面處荷載作用效應及截面抗力規律不匹配,本文提出了採用t形混凝土梁和工字鋼代替一般的混凝土板和工字鋼的組合梁截面形式,並給出了截面尺寸比例,能使正負截面抵抗矩接近,符合組合梁受力特徵,減少了材料用量,滿足承載力和剛度等要求。And then, the error matrixes of location and kinemics of the end point, and the on - line error compensation method are given based on robot ' s dynamics. finally based on puma robot, three simulation examples are given respectively ; the first is about the location error and on - line location error compensation, the second is about the kinetic error and on - line kinetic error compensation, the third is about location and kinetic errors causing by robot ' s dynamics and the on - line error compensations. the simulation results show that : a ) location error of the end point based on elastic deformation of the sensor will be about millimeter ' s degree under the permitting load, b ) the on - line error compensation methods given are available
第三章首先概括了目前機器人連桿慣性參數識別的四種方法,總結這些方法的優、缺點;指出這些方法存在的問題是:或者需將機器人解體,不能在線進行參數識別,或者不能給出機器人連桿獨立的慣性參數值,只能獲得慣性參數的組合值,而這些方法的共同問題是:不能考慮機器人連桿的關節特性;本章提出了一種基於腕力傳感器的機器人末端連桿慣性參數在線識別方法,給出了該方法的理論計算和推導;研究提出了以腕力傳感器輸出為前提的、基於newton - euler動力學的機器人動力學正向、逆向遞推公式;針對機器人負載參數辨識必須在線、實時的特點提出了基於腕力傳感器的負載參數在線識別方法,給出了負載參數識別的步驟。The software system provides the switch with the ability to support each user monopolize lombps bandwidth, through which the user can use vod, voip and other digital services, and it also allows the switch to support multicasting, trunk, and traffic isolation. this thesis consists of five parts. the first chapter introduces ethernet access technologies and requirements for the switches
通過軟體系統的配置,接入交換機能夠使用戶獨享10mbps帶寬,使用視頻點播、 voip等實時業務,支持組播以提高網路帶寬的利用率,支持鏈路聚合,在互連交換機的多條可用的物理鏈路間實現自動的負載均衡。It was difficult to measure the load voltage directly between inner and outer conductor of cable induced by shield current under low flux x ray. this paper introduces a measurement, pouring a current, which was same as cable approximately photocurrent in x ray test, into the shield of cable with a triocoaxial system, and the load voltage was got. finally the measured result of typical cable and comparison with the calculation was given with a special load
在簡要介紹屏蔽電纜的轉移阻抗和轉移導納耦合的基礎上,描述了利用三同軸系統對雙電纜和等效負載組成的電纜系統進行電流注入,模擬電纜屏蔽層發射電流,測量芯線等效負載感應信號的實驗,給出實驗結果及分析,並對理論結果與實驗進行了比較。4. to get the motor ' s performance by calculation with known formulas, as a result an adjustment for the motor ' s configuration can be practised. when a combined method of altering the length of armature, the number of turns in the winding and the dimension of permanent magnet is used. 5. to get the motor ' s performance when it is driven by the power converter. finally, the calculated data are compared with the experimental measurements, so as to verify the rationality and reliability of the method
Q採用數值分析直軸負載磁場和交軸電樞反應磁場的方法來計算,得到較為準確的結果;根據電機工作特性的計算公式計算電機性能,由計算結果調整電機的結構,而調整工作使用改變電機鐵心長度、繞組匝數和永磁體尺寸相結合的方法,這樣可以得到較為理想的結果;對變頻電源供電時電機的工作特性進行計算,以檢驗其變頻時的性能。Security through https ssl by using the web test viewer, you can view and debug your web tests for verification
如果測試計劃允許,還可以在負載測試中將web測試與單元測試進行組合。For the cantilever beam, the theoretical stiffness and limited capacity are slightly less than the test ones if considering only the steel beam and the reinforced bars in the negative moment zone with the concrete in the tension zone ignored
結果表明:簡支組合扁梁,忽略彈性中和軸以下受拉的混凝土的影響,採用等效換算截面方法計算所得的剛度和極限承載力與試驗結果比較吻合;懸臂梁只考慮混凝土板中配置的負彎矩鋼筋,忽略混凝土,計算所得的剛度和極限承載力比試驗結果略微偏小,但相差不大。Cranes - design principles for loads and load combinations
起重機.負載和負載組合的設計原則With the application background of the development of pbc dalian branch " disposal information s ervice system ", the decision supporting subsystem of dalian international cooperating group information system and china life insurance company dalian branch " estimate and planning of market the decision supporting system ", paper applies itself to resolve the above conflict and problem, in order to enhance the self - adaptive of dw system, to implement integration optimization within dw and measure the users compatibility, and to get a self - adaptive dw system. during the process, it uses dw technology, dw quality, corba structure and agent technology. the content is below : ( 1 ) in order to decrease the development cost, to improve the multiplexing of components and to realize load balance and distributional calculation in larger range, paper studies and realizes the self - adaptive architecture of dw with the corba technology, agent technology and java programming language. as a result, the dw architecture get the ability of initiative, permanence and intelligence
鑒於此,本文以數據倉庫系統面臨的問題與矛盾為研究背景,以中國人民銀行大連資金清算中心清分信息服務系統、大連國際合作集團決策支持系統、中國人壽保險公司大連分公司營銷決策支持系統評估與規劃等三個項目為應用背景,以強化數據倉庫系統的自適應性、在數據倉庫系統中進行聚集優化和度量數據倉庫用戶適用度,得到一個自適應的數據倉庫系統為目的,利用數據倉庫技術、數據倉庫質量、 corba結構以及agent技術,重點研究了以下內容: ( 1 )為達到降低軟體系統開發成本、提高組件重用性、在較大范圍內實現平衡負載與分佈運算的目的,賦予數據倉庫體系結構主動性、持久性、智能性的能力,本文利用corba技術、 agent技術與java編程語言,研究並實現了數據倉庫自適應體系結構。Avm is essentially a precision array film attenuator, which has a big diameter, high power load, continuous adjustment. the gain of each beam of the main amplifiers is controlled independently by the adjusting the angle of each cell of avm
Avm實質上是大口徑、高功率負載、透過率連續可調的組合式精密薄膜衰減器,通過調節avm各單元偏轉角度大小來獨立控制住放大器各路的增益。In the load test wizard, you choose networks to add to the initial scenario
可以以後在「負載測試編輯器」中更改方案的網路組合。In the load test wizard, you choose browsers to add to the initial scenario
使用「負載測試編輯器」可以在以後更改方案的瀏覽器組合。Direct synthesis of dimethyl carbonate over rare earth oxides supported catalysts
稀土氧化物負載雙組分催化劑用於直接合成碳酸二甲酯This suit of algorithm constitutes two parts : one is the bandwidth allocation algorithm against t - cont, which is executed in olt ; the other is the bandwidth utilization algorithm against t - cont, which is executed in onu
該套演算法由兩大部分組成:一是olt端針對t - cont的帶寬分配演算法,其功能是依據各個t - cont的擁塞報告,結合網路整體負載狀態,完成四種類型帶寬在不同類型、不同擁塞狀態的t - cont之間的分配;一是onu端針對t - cont的填充演算法。1 the combination of a test mix, a load profile, and a simulated environment for a load or a stress test
( 1 )測試組合、負載配置文件和用於負載或壓力測試的模擬環境的組合。分享友人