負載線圈 的英文怎麼說

中文拼音 [zǎixiànjuān]
負載線圈 英文
ballast coil
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 圈名詞1. (養豬羊等牲畜的建築) pen; fold; sty 2. (姓氏) a surname
  • 負載 : [電學] load
  • 線圈 : [電學] coil
  1. Not all regions worldwide use loading coils

    並不是世界各地都使用負載線圈
  2. Loading coils - detection and location ( s )

    負載線圈檢測和定位。
  3. Again, if the analysis engine knows if loading coils are allowed, and, if so, how they may be present, algorithm complexity can be eased

    再次地,如果分析引擎知道是否允許負載線圈,如果有的話,他們是如何安裝的,即能降低演算法復雜性。
  4. Cnc took over glass cutting, pattern making, electrical discharge machining, steel - mill roll grinding, coordinate measuring, electron beam welding, tube bending, drafting, printed circuit manufacturing, coil winding, functional testing, robots, and many other processes

    從玻璃切割、樣式設計、發電機電流、鋼廠滾動打磨、坐標測量、電子束焊接、彎管製作、起草方案、印刷電路製造、纏繞、功能檢測到自動機械等許多過程都已由數字計算機控制系統控制完成。
  5. The voltage ir on core adopts semienclosed insert model. the current element adopts two - stage compensation to have wide load property. the whole plasticenclosed voltage coil. can withstand instantaneous large voltage impulse. the double jewels bearing or the magnetic - propelled bearing can ensure long lifetime. the bipolar aluminium nickel cobalt damping magnet steels have high coercivity, stable magmetic property. the electric function is in accordance with iec521 international standard

    :電壓鐵芯採用半封閉插入式,電流元件採用二級補償使表計具有寬的特性。全塑封的電壓能稱說瞬時大電壓沖擊。雙寶石軸承或磁推動軸承確保表計長壽命。
  6. Combined with researches on propagation characteristics, the micro - current sensor for on - line pd monitoring is developed and the effects of coil number, stray capacitance and loading resistance on pass - band and sensitivity are also studied

    同時,結合傳播特性,研究了局部放電在監測寬帶微電流傳感器,並就匝數、雜散電容和電阻等對傳感器通頻帶、靈敏度等性能參數的影響進行了分析。
  7. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空損耗損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  8. By close study on the average temperature rise, temperature distribution, and tune constant of the class f resin dry type power transformer ' s high voltage and low voltage winding under self - cooling and wind - cooling mode, we find out the connection between the variation of the load and the items, mentioned above. the results of the experiments can be reference to both thermal design optimization of dry type power transformer and the revision of current standards. meanwhile, we develop the software, which can predict the overload ability of the dry type power transformer

    本文對f級樹脂澆注式乾式變壓器的高、低的平均溫升,內部溫度分佈和時間常數在自冷和風冷,兩種冷卻方式下隨變化的規律進行了研究,得出了平均溫升、熱點溫升和時間常數隨變化的相互關系和有關計算用參數和公式,試驗結果可作為改進乾式電力變壓器的熱設計的依據和對現行標準進行修改的參考。
  9. To test the time parameter, namely, is to test the operate time, release time and bounce time when the relay ' s winding is put or removed the rated voltage. these parameters ( especially the bounce time ) are very essential to relay ' s rated load

    檢測時間參數的目的是檢查繼電器在施加或切除額定電壓時的動作、釋放、回跳及穩定時間,這些參數(特別是觸點回跳及穩定時間)對繼電器通過額定是很重要的。
  10. This paper also analyzes the errors of the algorithm with arc extinguishing coil and user load in the system, and explains its practicability and feasibility

    本文還分析了系統在帶有消弧和用戶時此種測距方法的誤差,並說明了此種方法的實用性和可行性。
分享友人