費用估計 的英文怎麼說

中文拼音 [yòng]
費用估計 英文
cost estimate
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 估構詞成分。
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 費用 : cost; expenses; outlay
  • 估計 : estimate; evaluate; take stock of; size up; calculate; appraise; reckon; estimation; forecast
  1. The medicare cost is estimated to be one billion dollars

    老年醫療保健費用估計為十億美元。
  2. The total cost is estimated at yen 500, 000, 000, 000

    全橋建設費用估計在5000億日元。
  3. This paper will discuss project feasibility study, investment estimating, operating costs estimating, selling income and tax, finical analysis of a high technical project - medical isotopic production reactor which was developed by nuclear power institute of china, using nuclear project feasibility study and economic analyses method

    本論文將利現有的核工程項目可行性研究和經濟分析的方法對中國核動力研究設院近期開發的高科技項目? ?醫同位素生產堆的項目可行性報告編制、項目投資算、項目生產成本算、項目銷售收入及稅金算、項目財務評價指標的算、項目財務評價的結論等情況進行研究和探討。
  4. Hunter had drawn the plans, calculated the cost and prepared the estimate.

    是亨特訂下劃,出價錢來的。
  5. Further, even if the offering is successful, the estimated costs of being public can range from $ 100, 000 to $ 250, 000 per year

    進一步說,即使募集成功,公司上市每年的費用估計也在10萬到25萬之間。
  6. The chapter of project planning is to characterize the main planning sequence of the project : the scope planning - the scope definition - the action definition - the resource planning - the action sequence definition - the action duration - the cost evaluation - the schedule definition - the cost budget - the project planning. in order to deploy the entire project planning, the secondary planning is necessary : the quality planning, the communication planning, the organization planning, the risk planning, and the purchasing planning

    項目劃介紹了按照范圍劃-范圍定義-活動定義-資源劃-活動排序-活動歷時-算-進度劃-預算-項目劃制定的主劃順序,結合質量劃、溝通劃、組織劃、風險劃、采購劃的輔助過程,完整地制定項目劃的過程。
  7. Project cost estimates for a software project

    一個軟體項目的項目費用估計
  8. We must figure in occasional expenses in the budget

    我們必須在預算中把臨時費用估計在內。
  9. Estimate of extinct time and cost in the stochastic epidemic model

    流行病滅絕時間和費用估計隨機模型
  10. The project cost is estimated to be around 8. 3 billion mod prices

    這個工程的費用估計大約為83億以付款日價格算。
  11. Development, design, and expenses estimation on new technologies and products

    企業項目對于新技術新產品的開發劃及費用估計
  12. This project will provide an additional 1, 390 places and will be completed in 2009 at a cost of hk $ 500 million

    建成后將多提供1 , 390個宿位,建造費用估計超過五億元。
  13. Cost estimates for the limited nmd system currently being tested range from 60 billion to 120 billion

    目前被測試的有限的國家導彈防禦系統費用估計在600億美元到1200億美元之間。
  14. " while detailed cost estimate is yet to be determined, we expect the two incinerators to cost a total of about 10 billion

    由於詳細的費用估計仍未決定,我們預料兩個有關焚化爐總約一百億元。
  15. On the basis of collecting and processing many datum and materials. firstly. this paper analyzes main activities and cost constitutions of each stage of the life cycle of a fcs, and lay a foundation for later analysis and evaluation of system lcc. secondly, a basis method and usage range for estimating the system lcc are introduced. a multivariate linear regression model of pcs development cost and cost driven factor is built by use of the parametric method and supplies the base of cost estimation of newly - developed systems. thirdly, combine actual examples and make statistical analysis of lcc of a certain pcs developed by our institute, predict unhappened usage and service cost with grey prediction method, obtain proportion of each constitute to the lcc. forthly, according to actual conditions, use the fuzzy theory to overall evaluate efficacy of the fcs, fifthly, combimng our actual conditions, investigate specific measures of how to implement the life cycle cost management in our institute and put forward a new conception of developing web - based flight control system lcc management information system with pdm as the platform. at last, investigate important factors such as reliability and maintainability that may affect the life cycle cost of the fcs in detail, and put forward specific methods of lowering the life cycle cost of the fcs

    論文在收集和整理大量資料的基礎上,首先深入分析了飛控系統壽命周期各階段的主要活動以及各階段的構成,為以後系統壽命周期的分析和評價奠定了基礎;其次,介紹了壽命周期算的基本方法和使范圍,並利參數法建立了飛控系統研製驅動因子的多元線性回歸模型,為新研系統的算提供了依據;第三,結合實例對我所研製的某型飛控系統的壽命周期進行統分析,運灰色預測方法對未發生的使及維修進行預測,得出了該系統的壽命周期以及各組成部分所佔比例;第四,根據實際情況,首次運模糊理論對飛控系統的系統效能進行了綜合評價,構造了飛控系統系統效能模糊綜合評價模型;第五,結合我所實際,探討了如何在本單位實施加強壽命周期管理的具體措施,提出以pdm為平臺,開發基於web的飛控系統lcc管理信息系統的新構思;最後,對影響飛控系統壽命周期的重要因素如可靠性和維修性等進行了詳細地研究,提出了降低飛控系統壽命周期的具體方法。
  16. On monday, iranian president mohammad khatami pledged to cover the cost of the surgery, estimated at around $ 300, 000

    本周一,伊朗總統哈塔米許諾將承擔伊朗連體姐妹分體手術的一切費用估計約30萬美元。
  17. 2 cost estimating ? developing an approximation ( estimate ) of the costs of the resources needed to complete project activities

    算編制完成項目工序所必須的資源
  18. " a feasibility study is being conducted on the development of the weif. the study addresses the engineering feasibility, environmental acceptability, health impacts, contract arrangement, site selection, preliminary design and cost estimates

    發言人補充:發展廢物焚化能源回收設施的可行性研究現正進行,研究內容包括工程上的可行程度,環保上的可接受程度、健康影響、合約安排、選址、初步設費用估計
  19. A spokesman for the planning, environment and lands bureau said today friday. " a feasibility study is being conducted on the development of the weif. the study addresses the engineering feasibility, environmental acceptability, health impacts, contract arrangement, site selection, preliminary design and cost estimates

    發言人補充:發展廢物焚化能源回收設施的可行性研究現正進行,研究內容包括工程上的可行程度,環保上的可接受程度健康影響合約安排選址初步設費用估計
  20. " while detailed cost estimate is yet to be determined, we expect the two incinerators to cost a total of about $ 10 billion

    由於詳細的費用估計仍未決定,我們預料兩個有關焚化爐總約一百億元。
分享友人