資料剔除 的英文怎麼說

中文拼音 [liàochú]
資料剔除 英文
data rejection
  • : Ⅰ名詞1 (錢財; 費用) money; wealth; expenses 2 (資質) intelligence; endowment 3 (資格) quali...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • : Ⅰ動詞1 (從骨頭上刮肉) scrape meat off bone 2 (從縫隙里往外挑) pick out 3 (剔除) pick out an...
  • : Ⅰ動詞1 (去掉) get rid of; eliminate; remove 2 [數學] (用一個數把另一個數分成若干等份) divide:...
  • 資料 : 1. (生產或生活的必需品) means 2. (依據的材料) data; material
  • 剔除 : reject; get rid of
  1. According to characteristics of the seismic data from the low snr region with complex surface, this paper is started from solving the static correction problem and reasonable eliminating all kinds of disturbance in the seismic data from the low snr region with complex surface. through the whole process of seismic data processing which includes a series of processing methods that are suitable for the low snr region, namely, from the choosing of the floating base - level, the static correction in the field and indoors, the eliminating of all kinds of noise before and after stacking, the velocity analysis with high - resolution, the reasonable techniques of deconvolution before stacking and wavelet processing after stacking, to the method choosing of the high - resolution stacking and the reasonable and accurate offset imaging, a set of the complete and effective flow for processing seismic data from the low snr region with complex surface are finally formed, which can meet the need of explo

    本文針對復雜地表低信噪比地區地震的特點,以解決復雜地表低信噪比地區地震靜校正問題及合理各類干擾為出發點,在整個地震處理過程中,從浮動基準面的選取、野外及室內靜校正、疊前疊后各類噪音的去、高精度速度分析、合理的疊前反褶積及疊后子波處理技術、到選用高精度的疊加技術及合理準確的偏移成像方法等一系列適合於復雜地表低信噪比地區的處理方法,最終形成一套較完整且有效的針對復雜地表低信噪比地區地震的處理流程。
  2. Results show that a three - stepwise weight function correction method is effective and applicable and can be spread in other basins. it can eliminate the outlier of rainfall data and improve the accuracy of flood forecast

    計算結果表明,採用雨量觀測誤差三步權函數修正法是有效的,能準確雨量的粗差,改善雨量的合理性,提高洪水預報的精度。
  3. Observations obtained from overseas sources as well as from local networks are decoded and quality - checked for doubtful or erroneous data. short - range forecast fields i. e. 3 - hour forecast from 20 - km inner model and 6 - hour forecast from 60 - km outer model from the previous model run are used as first - guess or background in assimilating the latest observational data. objective analyses are then carried out and currently a three - dimensional optimal interpolation method is used to prepare the initial fields for the model forecast

    天文臺從海外及本地網路取得觀測,經過譯碼后,便會進行質量控制檢查,把可疑和錯誤的數據,然後利用上一次模式運行所得出的短期預報場,即20公里內模式的3小時預報及60公裡外模式的6小時預報,作為初估背景場,再注入最新觀測數據,進行客觀分析,以得出模式預報的初始場。
  4. A uniform state ion chamber with double layers has been developed for distinct measurement in various n + y mixed fields in the fast neutron reactor. the cavity material is 6lif + 7lif. the inner wall material is 6lif and the outer wall material is 7lif

    根據let效應因子的測量結果和快中子堆y譜、中子譜等基本,以及~ 6lif和~ 7lif對中子響應靈敏度有較大差異這一特點,研製了以~ 6lif + ~ 7lif為空腔、 ~ 6lif為外壁、 ~ 7lif為內壁的具有雙層室壁結構的均勻固體電離室,並將其用於快中子脈沖堆n 、混合場區分測量,徹底了熱中子的干擾。
  5. The main steps are extracting and analyzing different types of attributes, preprocessing the extracted attributes, rejecting attribute anomalous values and filtering, seeking and selecting the sensitive attributes combined with drilling and oil extraction data, descending the optimal seismic attributes through k - l changes, and using the synthetic analysis technology with linearity and nonlinearity on reservoir prediction

    其主要步驟為:不同種類的屬性提取和分析;屬性的預處理,即異常值並進行濾波等處理;結合鉆井、採油尋找和篩選敏感屬性;利用k - l變換來對優選出的地震屬性進行降維處理;利用線性、非線性等綜合分析技術進行儲層預測。
  6. The main contents are as follows : 1 ) 3 eliminate error criterion method and step wise regression analysis method is used to analyze the errors of observation date. in the stepwise regression analysis, aging, loading and temperature which bulkily affects the dam ' s vertical deformation are selected as the regression factors, then regression equation and curve of each point are worked out

    運用3準則誤差法和逐步回歸分析法對茅坪壩的觀測進行誤差分析,在逐步回歸分析中,選用對壩體豎向變形影響較大的時效、施工加載和溫度作為回歸因子,求出各測點的回歸方程和擬合曲線。
  7. The committee are seriously concerned that because of the confidentiality provisions in the general conditions of contract for the bridge contracts concerned, the director of audit has to exclude from his report the relevant information, i. e. detailed information relating to the contractors, the dispute resolution processes and the settlement sums, thereby causing unnecessary delay in the committee s work and reducing the overall usefulness and timeliness of the director of audit s report

    委員會深切關注到,基於有關橋梁合約的合約一般章程所戴的保密條文,審計署署長須在其報告書內有關,即關于承建商、解決爭議過程及和解金額的詳情,以致委員會的工作出現不必要的阻延,並減低了審計署署長報告書的整體效用及在時間上的適切性。
  8. Researchers pooled data from three of the four studies, excluding the lowest - quality study from the statistical analysis

    研究人員將四項研究中的三項的研究集合起來,並了統計學分析中質量最低的一項研究。
分享友人