起吊系統 的英文怎麼說

中文拼音 [diàotǒng]
起吊系統 英文
tackling system
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : hangsuspend
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. This thesis analyzes the development and application of vr technology and computer simulation technology all over the world, aims at meeting the specific requirements of the training of container bank crane operators ( cbc ) and other port crane operators in china, and presents to you design methods and plans as well as real operation examples of simulation systems for electric cbcs. furthermore, it even creates a tentative workable model of a lifting tackle for a cbc

    本文在分析了虛擬現實技術和計算機模擬技術在國內外發展及應用情況的基礎上,結合岸邊集裝箱重機和我國港口重機司機培訓的具體要求,分析和提出了岸邊集裝箱重機電控與操縱模擬的設計方法和設計方案,初步建立了集裝箱重機小車?的運動模型。
  2. We have advanced equipments in the world, whole set apparatus made in german, special tools used in jatta and audi vehicles, advanced testers, wrong readers, launch tester, inner peeper, advanced repairing machines, automatic lift shaft, wheel balancer and italy automatic lacquer baker, computer print reached ministry standard

    義大利全自動烤漆房,全自動電腦調漆設備,義大利全自動輪胎平衡機,全自動輪胎安拆機義大利重設備加拿大車身校正汽車電能試驗器廢氣分析儀電腦故障閱讀器空調冷媒測漏儀abs測試儀噴射測試儀機油壓力測試儀等。
  3. The whole system is supported by the main jack arrangement when concreting, placed at the front supporting bracket and the ( rear ) suspension gallows ? or on supporting brackets only at the start and expansion joint spans

    整個在混凝土澆注過程中由前牛腿及(后)架上主千斤頂支撐,在始段和伸縮縫處則在前後牛腿處支撐。
  4. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    分析了大跨度鋼桁架胎架整體滑移施工中的裝機具的選擇與布置、施工平面布置、桁架結構拼裝單元及滑移單元劃分、滑移施工方案及工藝流程、桁架的連接、拼裝運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引等諸多工藝問題。
  5. Improvements such as upgrading the sailing information display system, replacing the baggage handling cranes and refurbishing public toilet facilities are being made to the terminals

    兩個客運碼頭現正進行改善工程,包括改進航班資料顯示、更換行李重機,以及翻新公廁設施。
  6. The model is to plan quay - crane loading operation, to schedule yard - crane routing and to dispatch vehicles to containers, so as to minimize the totally idle time of the related equipment and yard - crane travel time

    模型對岸橋裝載規劃、堆場設備路徑選擇和集卡分配進行了的優化,其優化目標是相關設備的空閑和堆場設備空駛時間的最小化。
  7. Type lxg suspension over - rail crane is specially designed for use at coal, mill in power plant, it applies to hoisting the roller spare parts of coal mill and etc, it is also suitable for use of connecting the workshop and various site where it is needed

    Lxg型電動單梁懸掛過軌重機是為我國大型火力發電廠輸磨煤而設計的專用重設備,主要用於運磨輥及其它磨煤機部件,它還適用於連跨車間以及需要懸掛過軌的各種現場。
  8. The author gets these results by researching the method in construction technology : ( 1 ) from the common construction method of grid frame the paper summarizes the types of the sliding construction, the plan of for life - on construction, the seal method of the components, the grid frame assemble, the separating of the sliding unit, assemble in high altitude, and the sliding system

    從施工技術的角度對逐條滑移施工技術研究得到了如下成果: ( 1 )從網架一般施工方法入手,對網架滑移施工的分類、裝方案、構件的拼裝焊接、網架拼裝、滑移單元劃分、高空組對裝、滑移的構造、設置等工藝進行了整理、總結。
  9. Acnr for quay crane rmg rtg vecon - quay crane vecon - quay crane is an efficient and cost - effective product for enhancing container loading and unloading by verifying the container id numbers correctly and efficiently. container number recognition system for effective terminal management vecon - spreader vecon - spreader is a container number recognition and verification system for rtg and rmg operation

    用於港岸重機qc rmg rtg的acnr慧光岸邊集裝箱號碼自動識別vecon - quay crane是一個高效低費用的產品,通過正確和高效地辨識集裝箱號碼,提高了集裝箱碼頭的裝卸作業效率。
  10. This paper introduces the trolley - lifting load movement model and the revised model with damp for container crane operation simulator, works out swing angles of the load in different conditions by means of numerical analysis method and discusses effectiveness of the reducing swing by controlling trolley moving

    摘要給出了在港口集裝箱重機虛擬操作訓練中小車重的運動模型及加阻尼項后的修正模型,並採用數值計算方法求得了在不同工況下的重的擺動,且討論了控制小車運動時的重減搖效果。
  11. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引的承臺和基礎的附加應力,對加勁梁的架設影響大;懸結構未完體(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  12. It covers the actual collision between spreader and container in training simulator system, focusing on building up coordinate system, collision - check, determination to the collision conditions, judgement to movement condition after collision and loading

    摘要分析岸邊集裝箱重機模擬訓練具與集裝箱碰撞的實現,它包括坐標建立、碰撞檢測、碰撞狀態的確定、碰撞后的運動情況以及著箱判斷等內容。
分享友人