起始時間 的英文怎麼說

中文拼音 [shǐshíjiān]
起始時間 英文
datum time
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : Ⅰ名詞1 (最初; 起頭) beginning; start 2 (姓氏) a surname Ⅱ動詞(開始) start; begin Ⅲ副詞[書面...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 起始 : origin; origination; parentage; germ; initiation
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. K - ar age of an illite from alteration rock in the contact zone around lianhuashan porphyry is 38. 6ma. with referencing to the main metallogenic period of yulong copper metallogenic zone and of ailaoshan gold metallogenic zone, it is suggested that the time of formation of deposits in the district studied is probably in a period of time from 38. 6ma at earliest to 20ma at latest. this time is equivalent to the origination time of two important tectonic events, i. e., lanping movement and the turning point when ailaoshan - red river fault turned from sinisteral into dextral

    獲得了蓮花山巖體周圍接觸帶蝕變巖中伊利石k - ar年齡38 . 6ma ,參考玉龍銅礦帶和哀牢山金礦帶的主要成礦期(分別為30ma左右及26ma ) ,釐定本礦集區成礦年齡下限為38 . 6ma ,上限為20ma ,與兩次重要的構造事件?蘭坪運動的起始時間及哀牢山?紅河斷裂由左旋轉為右旋的相當。
  2. When soil antecedent condition is dry and the initial rainfall intensity is high, peak surface runoff also considerably lag behind that of rainfall, because of the formation of temporary relative impermeable top layer ; b ) surface runoff is controlled primarily by infiltration - excess runoff mechanism under unsaturated condition ; the major fraction of surface runoff are dominated by saturated infiltration - excess runoff response, only a small fraction by return flow mechanism when soil is saturated ; c ) subsurface flow is dominated by saturated runoff mechanism, and the duration of subsurface post the rainfall end is dependent upon rather the soil properties than the rainfall characteristics ; d ) subsurface flow intensity in cultivated soil layer ( 0 ~ 20cm ) is high up to 35mm / h when rainfall intensity is up to 120mm / h, indicating the existing of macropores and pipe flow in cultivated layer

    2 )耕作制下紫色土的產流主要機制是: 1 )當雨前土壤含水量未達到飽和狀態,表面產流起始時間有明顯滯后現象,這與紫色土的快吸水性和較多非毛管孔隙密切相關;當雨前土壤較乾燥,降雨初期雨強較大,易形成臨相對不透水表層,表面產流峰也有明顯滯后現象。 2 )表面徑流的產流方式主要是超滲產流,當土壤達到飽和狀態后,有四川大學博士學位論文小部分回歸流發生,但主要是飽和超滲產流發生,因為紫色土的相對不透水層和其它透水障礙層不明顯。 3 )壤中流主要是飽和產流,與降雨過程有明顯的滯后,而且雨停后的壤中流產流歷與降雨特徵無關。
  3. For example, a log can provide the start and finish time for a package run

    例如,日誌可提供包運行的起始時間和結束
  4. The time evolution of wave functions is deterministic in the sense that, given a wavefunction at an initial time, it makes a definite prediction of what the wavefunction will be at any later time

    感覺上波函數的演化是確定的,在起始時間給出一個波函數,在以後的里就可以確定預報波函數。
  5. Time taken by exceptionhandler process process end time - process start time

    Exceptionhandler流程所需=流程終止-流程起始時間
  6. Total number of orders processed by the otmps process per hour number of orders processed process end time - process start time

    每小由otmps流程處理的定製的總數=處理的定製的數目/ (流程終止-流程起始時間
  7. 2 after the specified trial period and if no notice of termination is given the employee automatically becomes employed under the terms and conditions of this contract

    試用期自本合同簽署之日為三個月。在試用期,該員工受本合同全部條款所約束。
  8. B. domestic orders and delivery : please note that we can only process orders and payment for matches which are received more than ten business days in advance of the ticketed dates of the earliest match ordered

    B需要訂票遠程付款以及要求送票的國內用戶,請在預定所需場次比賽對應開10個工作日之前完成訂票,在比賽開前第10個工作日,我們將不再受理訂票。
  9. To measure a rtt sample is easy in theory. only using the value of time when ack is received subtracts the value of time when sent the segment

    在理論上,測定一個往返樣本是很簡單的,只需把收到確認信息的值減去發送這個報文段的起始時間值即可。
  10. The relationship between the market clearing price and generation capacity adequacy is represented as a nonlinear function. based on the loads forecasted and the estimated maintenance schedules of generation companies, the market clearing price can be obtained

    模擬了現貨市場電價與系統發電容量充裕度之的函數關系,依據對其它發電公司檢修起始時間的概率估計和負荷預測結果,求得發電容量充裕度、進而現貨市場的電價。
  11. Under start time, enter the time of day to run the nightly build

    在「起始時間」下輸入每夜運行生成的
  12. Western blot analysis showed that rhpk - 5 ( recombinant human plasminogen kringle 5, rhpk - 5 ) protein was recognized by mab same as native hpk - 5. the result suggested that we obtained correct gene sequence of hpk - 5 and got the purified rhpk - 5. section ii : construction of pbv220 / hpk - 5 vector for obtaining high - level hpk - 5 expression system, the hpk - 5 gene was recombined with plasmid pbv220 to construct the vector of pbv / hpk - 5

    Coli )作為宿主,經sds - page分析,篩選表達量最高的菌株作為發酵用工程菌株;用western - blot方法鑒定hpk - 5因子的免疫學活性;用搖瓶發酵的方法,研究發酵培養基的體積(溶解氧) 、組成成份及誘導起始時間和誘導持續對目的蛋白表達量的影響,優化hpk - 5基因工程菌的表達條件。
  13. The land of new take over for use, farmland is belonged to before commandeer or be not farmland according to its, the initiative time of royalities of pay town land also differs somewhat

    新徵用的土地,根據其徵用前屬于耕地還是非耕地,繳納城鎮土地使用稅的起始時間也有所不同。
  14. A progress window that lists the start time of a package and its tasks, their execution state, and any warnings and error messages

    列出包及其任務的起始時間、它們的執行狀態以及所有警告和錯誤消息的進度窗口。
  15. It is always a paradox to improve the performance of tracking initialization and to reduce its time cost, through tracking initializationhas been divided into different ranks to which we have different treatment, initializing fleetly for high rank, waiting to the next one or two step to initialize for lower ranks, non - initializing for the lowest ranks. the result of simulation shows that this method accelerates the average initialization velocity with certain probability of initialization and false initialization

    航跡質量與航跡起始時間的矛盾一直是難以解決的問題,通過引入航跡等級化的方法,不同等級的航跡區別對待,等級高的航跡快速,等級較低的航跡延遲一步(或兩步后),等級最低的航跡暫。模擬結果表明,此方法在保證一定航跡概率與虛假航跡概率的情況下,加快了平均速度。
  16. In this thesis the problem of controlling the start up of heating plant in domestic buildings is considered and the need for a self - tuning start control scheme is explained

    設計出了較為先進的基於溫度預測模型的熱源系統最佳起始時間自調節控制器。通過matlab和simulink進行了模擬實驗。
  17. Scientists have dated the site, which is located in england, to around 3000 bc

    科學家已經鑒定出了這處位於英格蘭的遺址的起始時間,大概是公元前3000年左右。
  18. Context : the timing of initiation of hormone therapy may influence its effect on cardioascular disease

    內容:激素治療起始時間可能影響其對心血管病的作用。
  19. The service duration begins upon the interpreters arrival at the customers premises and ends when he or she leaves, including the break and lunch hours

    翻譯工作的計算以到達客戶工作地為起始時間,離開工作地為最終包括中的休息及午餐
  20. He therefore gave his models a series of decade - long tests beginning with the real climatic conditions ( level of solar radiation, ocean temperature and so on ) on 80 different start dates from 1982 to 2001

    於是,他就對自己的模型進行了一系列十年期的試驗,這些試驗開於從1982年到2001年的80個不同的起始時間的真實氣候條件(太陽輻射程度、海洋溫度等等) 。
分享友人