起重橫梁 的英文怎麼說
中文拼音 [qǐzhònghéngliáng]
起重橫梁
英文
lifting beam- 起 : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
- 重 : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
- 橫 : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
- 梁 : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
- 起重 : jack up起重臂 jib loading boom; cargo boom; erector arm; jibboom; 起重車 carriage hoist; crane ca...
-
The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time
無骨架體系的主要承重構件是密肋夾芯板(包括樓板和墻板) ,縱、橫墻相交處設鋼筋混凝土構造(連接)柱,墻板和樓板相交處設連系(圈)梁,連系梁和柱主要起連接和傳遞荷載作用,也承擔少部分荷載。The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated
採用大型三維有限元軟體ansys對該起重機以及小車架等進行了建模、應用apdl語言編寫加載程序、進行非線性計算,再現龍門橫梁與起重機副梁碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出起重機橋架主梁、副梁、端梁的變形以及其內部的應力分佈情況。Case teaching in management, which emphasizing the interaction between the teacher and the students, attaching importance to training students ' ability of autonomous learning, cooperative learning, innovation, healthy personality and team awareness, will build up a bridge between management theory and practice and is bound to becoming the major trend of teaching with strong vital force in the teaching of management
摘要管理案例教學強調師生互動,注重學生自主學習、合作學習與創新能力、思維能力以及健全人格、團隊意識的培養,在橫亙于管理理論與實踐之間的溝壑上架起一座橋梁,必將發展成為管理教學中生命力極強的主流教學模式。Reasons : firstly, sectional dimension is so little that torsional stiffness of single - beam is n ' t enough. secondly, protective layer thickness is too thin to protect concrete reinforced bar and reduce durability. lastly, each main beam is joined by cross girder and the more rigid of cross girder the more entirety of bridge
橋梁局部損壞較嚴重,主要原因是主梁截面尺寸過小、肋板過于薄弱,造成單梁抗扭剛度不足;保護層厚度不夠導致鋼筋外露引起銹蝕,降低了橋梁的耐久性;各主梁採用橫隔梁連接成整體,橫隔梁的剛度越大,橋梁的整體性越好,但調查結果顯示,實際情況中並不能達到理想的整體剛度。There are two methods for welding radial stiffeners to bias - rail box girder : welded all around and open at tensile flange
摘要起重機偏軌箱形梁橫向加強板有加強板四周均焊和在受拉翼緣處空開2種焊接方式。Wan zhou yangtze river bridge is the establishing large span steel truss bridge now, and the property of it is the lower stiffness of the main girder. when the speed is high, the analyses and the vibration control of vehicles and bridge are very important, especially the dynamic lateral response of the system
萬州長江大橋是目前在建的大跨度鋼桁架拱橋,其特點是主梁結構剛度較小,在高速行車速度下,對起車橋耦合振動分析及其控制尤其是車橋系統橫向動力響應研究則尤為重要。A machine for hoisting and moving heavy objects, consisting of a movable boom equipped with cables and pulleys and connected to the base of an upright stationary beam
懸臂起重機提升和移動重物的機器,它由一個帶有纜繩和滑輪的可移動的、並與一根由向上靜止橫梁的底座連接的起重桿組成Combining the lifting and transversal transportation scheme of the precast beams for a hid section of zhongjiang expressway project, this paper investigates the ay of safe and efficient intermediate lifting and transportation of beams and slabs, serving as a reference for similar projects
摘要通過介紹中江高速公路某標段的預制梁起重與橫移運輸方案,探討如何安全、高效地完成梁板的中間起重運輸,為類似工程提供借鑒經驗。Bottom blocks for lifting appliances ; cross pieces ; unmachined parts
起重機的底座.第1部分:橫梁毛坯Bottom blocks for lifting appliances ; cross pieces ; finished parts
起重機的底座.第2部分:橫梁成品According to different mechanisms, there exist several types of resonance, including the bridge resonance induced by the periodical actions of moving load series of the weights, centrifugal forces and lateral winds of vehicles, the bridge resonance induced by the loading rates of moving load series of vehicles, the bridge resonance induced by the periodical loading of train vehicles excited by rail irregularities, wheel flats and hunting movements, and the vehicle resonance induced by periodical actions of the regular arrangement of bridge spans and their deflections
根據發生機理的不同,車橋系統可能發生幾種不同形式的共振,包括由車輛重量、離心力、橫向平均風荷載等形成移動荷載列的周期性動力作用引起的橋梁共振,由移動荷載列加載速率引起的橋梁共振,由軌道不平順、車輪扁疤、輪對蛇行等周期性加載引起的橋梁共振;由橋跨的規則性排列及其撓度的影響,對移動車輛形成周期性動力作用使車輛出現的共振。分享友人