超孔隙壓力 的英文怎麼說

中文拼音 [chāokǒng]
超孔隙壓力 英文
excess pore pressure
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • : 壓構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 孔隙 : small opening; hole; [冶金學] pore; aperture gap; pore space; ventage; void
  1. The paper can concern the soil ' s instantaneous fallout, soil ' s main settlement due to concretion, and the coactions of soil and pile by applying the contact surface to simulate the coactions. the paper can analyze the service behavior of reuniting foundation and the effect of the pile ' s intensity, length and distance. the paper is concerned with the stressing of pile and the arrangement of pile for the smaller cost to fit the subsidence of throughway

    通過有限元計算,分析了復合地基樁土工作性狀,分析了樁的剛度,長度,樁距對地基沉降及的影響,並根據復合地基中樁的受特點,提出合理的樁的布置方式,在滿足高速公路路面沉降要求的前提下,節省工程投資,加快建設進度。
  2. Liquefaction resistance defined by excess pore water pressure rise is approximately independent of the initial confining pressure

    同時也說明了由定義的抗液化強度與初始有效平均正應無關。
  3. Through analyzing the in - situ data such as total settlement, layered settlement and pore water pressure, the actual deformation behavior of soft foundation are mastered. after summarizing the methods of predicting settlement of soft foundation and bring forward a method to predict the post construction settlement of the surcharge preloading soft foundation. and the engineering application of the predicting foundation settlement based on “ law of massaction ” and the traditional predicting methods are compared, the results shows that the model is useable and it deserves more validation in more projects

    本文以深圳灣軟基處理工程試驗區為背景,通過對淺層沉降、分層沉降、等資料的分析,掌握了軟基變形的實際性狀;在總結軟基路堤沉降預測方法的基礎上,探討了軟基載預工后沉降預測的參數反演法;並對地基沉降預測的「質量作用定律」模型的工程應用與傳統的預測方法進行了對比,驗證這種方法是可行的,得出了一些有用的結論。
  4. When earth pressures are calculated by the shear strength parameters of cu, the way water - soil calculating separately is best, which should involve the influences of excess pore water pressure through the total stress unloading strength parameters of cu

    當採用固結不排水抗剪強度指標計算土時,最好採用水土分算的計算方法,計算時可以通過三軸固結不排水總應強度指標將的影響考慮在其中,但此時最好採用卸載強度指標。
  5. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性靜、動有限元分析程序對圍壩的4個典型剖面進行了靜、動模擬模擬,模擬計算了壩體自填築至蓄水運行和發生7地震各階段壩體及壩基的變形以及應分佈,地震應響應和地震引起的靜振動分佈以及永久變形。判斷了壩體和壩基中出現裂縫、塑性區以及地震液化的可能性。
  6. Harm of and treatment for excess pore water pressure resulted from pile driving

    沉樁引起的危害與處治
  7. Inflence of excess pore water pressure during pile driving in saturated soft soil

    飽和軟土地基中沉樁引起的的影響
  8. The reason for the failure of loosely residual soil slopes triggered by rainfall is that the contractive failure caused by the penetration of rainfall, giving rise to a high excess pore pressure which reduces shear strength of the soil. the soil is prone to flow slide after failure under the action of gravity due to its high moistu re content

    蔣家溝地區坡殘積土斜坡在暴雨條件下的破壞是由於降雨入滲導致土體發生剪縮破壞,破壞後土體的升高形成、土體強度降低、破壞迅速擴展所致,因而大多數斜坡呈流滑型破壞並具有突然性破壞特點。
  9. Based on the consolidation mechanism analysis of the warping clay under osmotic pressure, a finite strain osmotic pressure consolidation equation, of which the excess pore - pressure or void ratio was selected as dependent variable, was derived

    首先,通過分析滲作用下的淤填粘土的固結機理,推導出以比為控制變量的有限應變滲固結微分方程。
  10. The corresponding programs in matlab language were presented for various operating mode computations. thus, the excess pore - pressure and void ratio distribution along space - time could be derived. the degree of consolidation, which could be expressed by excess pore - pressure or deformation, was derived for various operating mode and its ’ characteristics along space - time showed rules of warping soil consolidation under osmotic pressure

    應用matlab語言編制計算程序對各種工況的消散、比隨時間和空間的變化進行了求解,對各種計算工況得到的以和變形表示的固結度的變化規律進行分析,說明滲體積作用下淤填粘土的固結隨時間和空間的非線性分佈特性。
  11. Because of the clay and aggregation in the soil, which induces the permeability to be bad, excessive pore water pressure produced in the process of dynamic consolidation does not dissipate quickly ; it will lead to the deformation and the failure of the soil

    世紀花園高飽和度地基土由於存在粘粒及集聚體,強夯后使土的滲透性變差,超孔隙壓力難以快速消散,致使土發生變形破壞。
  12. Results of calculation show that dissipation of excess pore water pressure due to squeezing effect of concrete - cored sand - gravel piles is faster than that of the ordinary cfg piles

    算例表明,成樁后的混凝土芯砂石樁,其擠土效應產生的的消散,遠快于常用的水泥粉煤灰碎石樁( cfg樁) 。
  13. Elastic - plastic analysis for soil around anchor jacked pile in this paper, the course of penetration is regarded as expansion of cylindrical cavity in infinite soil mass. combining with the knowledge of elastic mechanics and plastic mechanics, we can make analysis for soil around pile. finally, we can educe the cylindrical cavity pressure, radius of plastic zone, radical displacement in elastic zone, excess pore water pressure in soil around pile and spherical cavity pressure at the end of pile

    錨桿靜樁樁周土體的彈塑性分析該部分是文章的主要工作所在,本文把樁過程樁周土體的本構關系看作是水平面的平面應變小擴張問題,利用小擴張原理,結合彈性學以及塑性學的知識,對樁後土體的性狀作出分析,得出樁對土的擠擴作用、樁周土體塑性半徑、彈性區的位移,樁完成瞬時樁周土體彈性區和塑性區的以及樁端球形擴張的擴張
  14. Abstract : the excess pore water pressure of saturated soft clay foundation caused by pile pushing is obvious. the method for calculating squeezing stress and excess pore pressure by elastic - plastic theory is deduced in this paper, and furthermore, the reasonable pile spacing by regarding the influence of both squeezing stress and excess water pressure is given

    文摘:飽和軟粘土地基沉樁過程中樁土擠所引起的樁周土體效應是非常顯的.本文從彈塑性理論出發推導出沉樁過程中樁周土體擠的計算公式,給出了考慮擠影響因素的合理打樁間距的確定方法
  15. A model test was designed to simulate the consolidation process of warping soil, the validity of theoretical equation and the solution methods presented in this study. actual measurements for excess pore - pressure, void ratio and settlement - time curves all showed good agreement with the corresponding computed values

    將理論計算的比、沉降-時間曲線和根據實測數據計算的這些量進行比較分析,說明文中建立的滲作用下的有限應變固結理論模型及求解方法的合理性。
  16. A quantitative evaluation for excess pore pressure and wellbore stress around a cased well under steam injection

    熱采過程中地層超孔隙壓力與井眼應的定量評價
  17. Excess pore water pressure caused by an installing pile in soft foundation

    軟土地基中單樁施工引起的
  18. Prediction of excess pore water pressure resulted from static pressed pile and time - dependent pile ultimate bearing capacity

    樁引起的及單樁極限承載預測
  19. Two modes have been identified in the earthquake induced damage to soil structures and foundations associated with excess pore water pressure rise in saturated sand

    對于在地震中由於飽和砂土的上升而導致的土工構築物和土工基礎的破壞的機理有兩種認識。
  20. By analyzing data of in - situ and laboratory in a certain project, the foundation stability is calculated with considering structural shear strength and meanwhile the foundation stability is also calculated with apparent strength increase total stress and the effective stress method considering the over - static water pressure ; and then the result could be gained : conventional method is conservatism

    結合具體的工程實例,對各種原位和室內試驗進行統計分析,對地基土進行考慮結構強度增長的總應法穩定性計算,並與考慮表觀強度增長的總應法和考慮的有效應法地基穩定性計算進行對比。
分享友人