超挖 的英文怎麼說
中文拼音 [chāowā]
超挖
英文
backbreak-
The company is providing the high - quality product oem processes ministrant at the same time, can also provide the product market fixed position consults, and according to customer of the homologous material, semi - processed goods in offering product, reasonable equipment in etc. in a material and cost control serves, the marketing plans related with super and worth kit in service, at that time a core for freely for customer providing latest color spreading fashion information, latest a material appearing on market information, technical and latest section in the color cosmetic result, brand value refines, cultural excavation in brand, the brand that try hard for customer gives the deep culture content
公司在提供優質產品oem加工服務的同時,還可根據客戶產品的市場定位提供相對應的原料半成品包材等合理配搭及成本控制服務產品市場定位分析咨詢服務營銷策劃服務等相關的超值配套服務odm ;免費為客戶提供最新色彩流行時尚趨勢分析;最新款包材的上市信息;彩妝技術的最新科研成果;品牌的核心價值提煉;品牌文化的挖掘,為客戶的品牌賦予深厚的文化內涵!Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel
特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。This test is based on homogeneous soil in foundation, and divided into two phases. the first is to stimulate the construction flow to excavate the pit ; the second phase is destructive test. because the pit is stable in the first phase and the research is point to the geometry shape of the failure surface, moreover, limited to the test condition, the effective surface force is applied to the pit
此次模擬試驗主要是針對簡單均質的基坑土層進行研究,試驗分為兩個階段,第一階段主要是以相似工況模擬基坑開挖,第二階段主要是破壞性試驗,即由於在第一階段基坑在開挖范圍內能夠自穩,為使基坑達到破壞狀態以研究滑面幾何形態,限於試驗條件,採用「等代面力」的方式施加超載。The article does some research of the full text retrieval technology. 1 、 the article summarize the development of the web search technology in the domestic country and aboard. it will refer to not only the common document retrieval in the web, but also the query of concept information, hypertext information, multimedia information and the data mining
本文對全文檢索技術進行了以下幾方面的研究: 1 、介紹了國內外檢索技術的發展過程,討論了普通文本檢索、概念信息檢索、超文本信息檢索、多媒體信息檢索、數據挖掘等的技術特點。Tensile stress field would appear in the proximity of arched vault after excavation, slacking of surrounding rock and subsequent dropping of blocks of rock from such area would possibly occur at any time in the context of extra - shallow depth. so i - steel arched support must be erected to provide against possible block dropping and be integrated into a ring with that of pilot tunnels on both sides
拱頂在核心土開挖后,在一定范圍內出現拉應力區,在超淺埋情況下極容易掉塊和發生圍巖松馳,因此核心土必須邊開挖邊架設工字鋼拱架,使之與左右導洞拱頂工字鋼形成整體。5 the director ' s prior approval shall be sought if the in - situ dredging volume exceeds 23, 500 m3
如果原址挖泥量超逾23 , 500立方米,須得到署長事先批準。Russia is resentful about its fall from superpower status, but it also seems reconciled to u. s. military dominance and more interested in tapping its massive oil and gas reserves than in rebuilding its decrepit military
俄羅斯對自己喪失超級大國的地位心存不滿,但是它並不願意挑戰美國的軍事優勢,它更感興趣的是挖掘自己豐富的油氣資源而非重建其江河日下的軍隊。The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well
摘要介紹了官地水電站場內環線道路黑水河溝隧道進口滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上進洞所發揮的作用。The results indicate that there is a strong to weak, then weak to strong evolution process for the total grassland desertification, middle desertification and slight desertification, which can be attributed to climate change and human activities, especially to the influence of climate change ; due to coal exploitation, the severe desertification is always distributing in " ? " around the mining land, and developing to the east quickly with the help of monsoon
結果表明:受氣候變化、超載放牧、掏挖藥材以及墾荒等因素的影響,輕度荒漠化、中度荒漠化以及荒漠化總面積存在由強轉弱、再由弱變強的演變過程:受煤炭開發的影響,重度荒漠化草地多圍繞礦業建設用地呈「 ? 」狀分佈,並且受季風影響向礦業建設用地東側發展迅速。Sir james clark ross had obtained a sounding of over 2, 400 fathoms in 1839, but it was not until of deep soundings was obtained in the atlantic and the first samples were collected by dredging the bottom
1839年,詹姆斯.克拉克.羅斯爵士曾測得海水深度超過2 , 400英尋;但直到1869年,皇家學會用英國「豪豬」號艦艇進行了幾次巡航后,才在大西洋測得一個海水深度,同時能過挖掘海底,取得了研究海底的首批樣品。Construction method about superlength artificial digging hole pile
超長人工挖孔樁施工方法Analysis of stability about excavation and support of super - span road tunnel
超大跨公路隧道開挖與支護穩定性分析Abstract : the application of smoothwall blasting in crushed surrounding rock of no. 2 tunnel with crushed surrounding rock has obtained more satisfactory results through selecting rational blasting parameters, adopting right supporting method and controlling the overbreak or underbreak of the tunnel effectively, etc
文摘:在周家山2號隧道破碎圍巖施工中,應用光面爆破技術,通過選擇合理的爆破參數,正確的支護施工方法,有效地控制隧道的超欠挖,加快掘進速度,取得了較理想的效果。The application of smoothwall blasting in crushed surrounding rock of no. 2 tunnel with crushed surrounding rock has obtained more satisfactory results through selecting rational blasting parameters, adopting right supporting method and controlling the overbreak or underbreak of the tunnel effectively, etc
在周家山2號隧道破碎圍巖施工中,應用光面爆破技術,通過選擇合理的爆破參數,正確的支護施工方法,有效地控制隧道的超欠挖,加快掘進速度,取得了較理想的效果。New technique of control digging shaft
控制井筒過量超挖欠挖的新工藝On the basis of the practice on work of extra - insufficient control and the subsidence of vault and the earth ' s surface, cases of engineering surveying techniques applied in the construction supervision in tunnels are discussed
摘要通過超欠挖控制、拱頂下沉、地表下沉的工程實踐,討論在隧道施工監控量測中工程測量技術的應用情況。Abstract : in order to provide the reasonable parameters in the reliability analysis of tunnel structure and the criterion in the quality control of tunnel engineering, in this paper, the over - under - excavated values of the real - state outline of tunnel excavation are obtained by the near - field photographic method. by using mathematical statistic method, the figure features and probability distributions of the over - under - excavated values of the surrounding rock, including deferent positions of same cross section, are analyzed
文摘:採用近景攝影的方法,從隧道開挖毛洞中獲取圍巖超欠挖數據,通過數理統計的方法,分析各類圍巖超欠挖的數字特徵及概率分佈,同時得出各類圍巖超欠挖在隧道斷面不同部位的分佈規律,為隧道結構的可靠度研究提供可靠參數,也為隧道工程質量控制提供基準2. through studying the effect of the dredging length, found that it is not a linear relationship between the dredging length and the relatively reduced deposition, for example when dredging exceed a certain length, though the relatively reduced deposition still increase slowly, the depositing volumes begin to decrease
挖槽長度對挖槽效果的影響的試驗研究結果表明,河道相對減淤量的增加與挖河長度的增加並不成等比例線性關系,即挖河長度超過一定值后,雖然河道相對減淤量還有緩慢增加,但減淤效率開始減小。Fractal character of over - excavation of tunnel surrounding rock
隧道圍巖超挖的分形特徵研究Ground subsidence, rebound deformation and horizontal deflection were measured, displacements inside the excavated slope were monitored and ground cracks and failure modes caused by extra excavation were investigated
測試內容包括土體位移、地表沉降、基底隆起、地面裂縫及超挖引起的破壞形態。分享友人