超負荷能量 的英文怎麼說
中文拼音 [chāofùhénéngliáng]
超負荷能量
英文
overload capacity- 超 : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
- 負 : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
- 荷 : 荷名詞(蓮) lotus
- 能 : 能名詞(姓氏) a surname
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 負荷 : [電學] load; charge; weight
- 能量 : 1 [物理學] energy; amount of energy 2 (能力) capabilities; capacity; 能量不滅 conservation of e...
-
It shows that the injection quantity and the difference of temperature distribute as a parabola which is at the same load, and the minimum of the parabola corresponds to the optimum quantity of injection ( g ). under the condition that the quantity of injected mass, the air speed and the heat quantity is respectively g, v and q, the research demonstrates that the pentium iv chip ' s temperature variation can be controlled under 40c and work normally when the wind speed overpass 1. 5m / s and the power dissipation of the chip is 60w. otherwise this paper calculates the flooding limit of thermosiphon with several different methods
對其充灌量、散熱量、電子元件( cpu模擬晶元)表面與環境溫度之差及通風、流速的影響進行了系統的測試,發現充液量與溫差的關系在負荷不變時呈拋物線分佈,其極小值點對應的充液量是最佳充液量g 。在充液量為g時,對風速v 、散熱量q進行的研究表明,當風速超過1 . 5m / s后,奔騰晶元在60w發熱條件下晶元溫度小於40 ,能滿足長期正常工作。Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district
鼎湖區主要依靠廣東省大電網供電,全區擁有4個11萬伏輸變電站和一家首期容量3000千瓦的火力發電廠,總供電能力超過7500萬千瓦,日負荷達1 . 5萬千瓦時。區內代電網路齊全,供民線路覆蓋城鄉。The load on the platform must not exceed the indicated capacity
平臺的負荷不能超過所指示的負載量。 (不允許超重。 )The possible reasons are as follows ; discharge valve damage or over load operation of diesel engine, or leakage of nozzle, or the incomplete combustion in the cylinder because not enough fresh air was pumped
可能的原因如下;排氣閥損壞或柴油機超負荷運轉,或油嘴漏泄,或由於進氣量不足導致燃燒不完全,等等。It includes : solving " excess attempt " and " defective attempt " of agc by load prediction in extraordinary shot time, that is preceding control technique ; ( 2 ) enhancing the regulating capacity and speed of agc of chongqing network by 5 measure ; analyzing the policymaking that chongqing network could achieve criterion now or after three gorges power station running, discussing the managing measure how to enhance regulating capability of agc of chongqing network
其中包括:利用超短期負荷預報解決agc 「過調」和「欠調」問題的超前控制技術;以5種實現方式提高重慶電網agc可調量和調節速度;探討了當前和在三峽電站投運后重慶電網達到考核標準的對策,討論了從管理上提高重慶電網agc調節性能的辦法和措施。With the adjustment of our economic structure, the speedy developing steps of coastal cities " economy and the implementing of the strategy of exploiting western area, lianyungang port witnesses its yearly increase of container cargo volume. as a result, its present fundamental facilities have to overworked severely, which breaks the balance between its fundamental facilities and throughput capacities, and hinders a much stronger momentums of cargo quantity increase
隨著我國經濟結構的調整,沿海城市的經濟發展步驟進一步加快,國家「西部大開發」戰略的實施,使進出連雲港港的集裝箱貨運量逐年增加,使連雲港港現有的碼頭基礎設施嚴重的超負荷運作,打破了港口的基礎設施與港口吞吐能力之間的平衡,也阻礙了貨運量的更快速的增長。Along with the development of power system, more and more generators and ehv transmission systems are put into operation. there come many new situations, such as the lengthening transmission distance, the heavier load, the increasing transient elements during the transient process. these new conditions influence the correct working of relay protections
隨著電力系統的不斷發展,大容量發電機組和超高壓輸電系統的相繼投入運行,系統中出現了許多新的情況,如輸電距離增大、負荷加重、故障暫態過程中的暫態分量大大增加、持續時間變長等,這些情況對目前常用的各種繼電保護方法的正確動作會產生許多不利的影響,甚至不能正常運行。The scale, facility, setup mode and the topper application are increasing, but the network management system still adopts a centralizing structure based on manager / agent model. in the centralizing structure, the network management system can ’ t change with the scale and complexity, which made the system bigger and bigger. all management logic is computing in one workstation, that will occupy too many bandwidth, depress performance and made the workstation become the weakest part, if the workstation overrun or dead, agent can ’ t come back because it must wait manager ’ s command
目前,我國電信網路正處于高速發展中,網路的規模越來越大,設備種類越來越多,組網方式越來越多樣化,應用越來越復雜,但是網路管理系統仍然普遍採用管理員/代理的集中式管理方法,在集中式網路管理模式中,網管系統不能隨著網路規模和復雜度的變化而變化,致使網管系統越來越龐大;網路管理邏輯全部集中在一個管理工作站中計算,需要佔用大量的帶寬來傳輸設備數據,有效性差,同時管理工作站是系統中最脆弱的部分,一旦管理方超負荷或死機,代理方因為必須等待管理方的指令而無法恢復系統,導致系統崩潰。Exercise could lead to remodeling of icn, of which normal exercise load might lead to proportional increase of cardiac and icn, adapting oneself ot transmit of contractility between myocardial bundles and cardiac muscle cell ( cmc ) under conditions of myocardial hypertrophy ; and exercise overload might lead to increase of a large number of different collagen among myocardial bundles, cmc, arteriole and capillary, that could lead to increase of stiffness and descent of systolic and diastolic function of heart
運動可引起心肌間質膠原網路結構的重塑,一般運動負荷可使心肌與間質膠原網路同步增長,以適應心肌細胞肥大收縮力增加從而保證肌束間及心肌細胞間力的傳遞;運動超負荷可使心肌束間、心肌細胞間以及小動脈和毛細血管間不同類型膠原大量蓄積增生,導致心臟的僵硬度增加,舒縮功能降低。503 service unavailable the request was not completed. the server is temporarily overloading or down
請求未能完成。服務器承載量超負荷。With the development of computer, multimedia and network technologies, the amount of visual information available in the digital format has grown exponentially recently, which has resulted in information explosion and has exceeded the limit of human ’ s acceptability
隨著多媒體技術、計算機技術和網路技術的發展,各種數字化的視覺信息迅速增加,信息的快速增長促進了社會的發展,但由於信息膨脹給人類帶來的海量信息超過了人們的負荷能力。分享友人