超載位準 的英文怎麼說

中文拼音 [chāozǎiwèizhǔn]
超載位準 英文
overload level
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 超載 : overload; excess freight; supercharge load(ing); overloading; superload
  1. In the positioning servo - system, which generally is configured by the d. c. pulse width modulator ( pwm ) velocity governing system and position servo - loop, the parameter perturbance of pwm velocity loop really exist by reason of such as the load behavior ; power voltage supply ; operating setting value, etc. 1, 2 , and it cannot be ignored. by using the identification technique to form the mathematical model of the system, authors have confirmed the facts. therefore, to design the discrete sliding mode controller ( dsmc ) of the positioning servo - system, the perturbed parameters value bounds of the pwm velocity loop, which is as the controlled plant of position servo - loop, should be accounted. consequently, the design principle of dsmc for accounting system with parameter perturbance is proposed by the authors. the proposed method can ensure the stability of system with parameter perturbance and the behavior of non - overshoot, fast precise positioning. in order to reveal the effects of the design method, the comparative research work is done by the authors. also, it has been tested in an industrial experiment, the results proved it is satisfactory

    由直流脈寬調速系統( pwm )和置環構成的定系統中,速度環的參數隨負特性;電網電壓;給定工況而攝動是不容忽視的.作者通過系統辨識建模也證實了這一事實1 , 2 .因此在設計置環的離散滑模控制時,必須針對速度環(即置環的控制對象)的參數攝動范圍採用「對象參數攝動離散滑模控制器的設計方法」 ,以確保系統在參數攝動時的穩定性和快速、無調、確定的優良動態品質.為剖析該設計方法的控制效果,本文作了對比性研究,並將該設計方法用於工業試驗中,取得了滿意的結果
  2. Answer : in the emeritus before personnel end 1992, if former unit shows to already closed, stop, and, turn, and branch of clinking stage director is mandatory ; or have an unit but cannot offer " emeritus examine and approve a watch " the retiree that waits for a data, think individual account is medium uninterrupted length of service and actual abhorrent, but by the individual " emeritus card " on the account of uninterrupted length of service of account belongs to orgnaization of area social security to declare to place, adjust via checking approval hind to will give, but should not exceed out to have a job to the fixed number of year during retiring

    答: 1992年底以前退休的人員中,如原單現已關、停、並、轉,且無上級主管部門託管的;或有單但無法提供《退休審批表》等資料的退休人員,認為個人賬戶中連續工齡與實際不一致的,可憑個人《退休證》上記的連續工齡記向所屬區社保機構申報、經核實批后將予以調整,但不應出自參加工作至退休期間的年限。
  3. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變約束的條件下,建立預應力鋼結構優化設計模型;提出多次預應力鋼結構優化設計方法和步驟,採用線性規劃和滿約束則相結合的優化方法,可優化設計出施加的每一級預應力的大小,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部布索的水平平行弦鋼桁架、整體布索的水平平行弦鋼桁架和局部布索的靜定鋼桁架等算例進行了優化設計,經濟效益明顯;對水平平行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸外,對索折點以外部分腹桿也起到卸作用,經濟效益好於局部布索。
  4. According to the study work of this paper, an automatic six - component strain gauge balance calibration system development scheme was put forwards : the system calibrates the balances in the ecs, and translates the loads to the bcs of the balances with measuring the balance ’ s position changes during the calibration

    本文根據1m高聲速風洞氣動力試驗的總體要求,提出了採用天平校荷地軸系全自動加、並通過天平空間移測量將校荷換算到天平體軸系( bcs )的六分量天平校系統總體研製方案,並確定了詳細的技術指標。
  5. Agrawal ' s theory model of soa ca n ' t simulate accurately the amplified signal pulse shape in soa when the pulse width is as short as several picosecond. so we simulate accurately the peak power, full width half maximum, rising time and falling time of amplified pulse after considering the gain compression, gain asymmetry, gain shift, gain variable with situation and time. with ultrahigh velocity dense wavelength division multiplexing ( dwdm ) and optical time division multiplexing ( otdm ) developing, we demand more and more short signal pulse and more signal channels

    但當信號脈沖的寬度只有幾個皮秒時, soa傳統的agrawal理論模型已經不能完全確地模擬soa對信號脈沖的放大情況,在此基礎上,我們在全面考慮soa的增益壓縮、增益非對稱和漂移、增益隨置和時間變化的流子壽命等物理機制的情況下,對皮秒短高斯信號光脈沖經soa放大后的脈沖的峰值功率、脈沖半值全寬度、脈沖的上升時間和下降時間等重要物理參量進行了確模擬和詳細研究。
分享友人