越江隧道 的英文怎麼說

中文拼音 [yuèjiāngsuìdào]
越江隧道 英文
cross-river tunnel
  • : Ⅰ動詞1 (跨過; 跳過) get over; jump over 2 (超出) exceed; overstep 3 (昂揚) (of one s voice...
  • : 名詞1. (大河) (large) river 2. (指長江) the changjiang [yangtze] river 3. (姓氏) a surname
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. With the actual example of luojiang tunnel ' s crossing - over engineering, this paper probes into the design of smooth blasting in tunnel construction and some concrete methods for the tunnel support construction to provide the reference for the similar construction

    通過化州(羅穿工程實例,探討了施工光面爆破設計和支護施工的具體方法,為類似工程的施工提供參考。
  2. Guangzhou metro line 1 starts from guangzhou east railway station via tianhe sports center, along zhongshan road westward to zhongshan qilu and then turns southward, extends through zhujian channel and liwan districts and other old city areas

    廣州地鐵一號線由天河火車東站起,經天河體育中心,沿中山路向西,至中山七路折向南面,穿過珠,沿花地大直至西朗站,橫跨秀、荔灣等老城區。
  3. The bund sight - seeing tunnel is china ' s first cross - river pedestrian tunnel dug by hi - tech means

    外灘觀光是我國第一條運用了高科技手段的行人
  4. Cross - river tunnel

    越江隧道
  5. Longitudinal analytic equation is convenient for predicting and computing the concentration distributions of air pollutants in river - crossing roadway tunnels

    摘要從縱向通風內空氣質量模式的解析解出發,縱向解析模式可方便地預測計算公路越江隧道內空氣污染物濃度的分佈。
  6. Based on the project of the chenglingji tunnel acres the changjiang river, with adopting the drill - blasting method of constructing, the construction characteristics, construction principle, key construction technology and safety measures are introduced

    摘要結合城陵磯長穿工程的工程實例,介紹了在越江隧道鉆爆法施工中,越江隧道工程的施工特點報和施工原則、關鍵施工技術以及安全措施。
  7. Through lab tests on melted and common dark green silty soil of the passway in shanghai fuxing east road tunnel by using the typical triaxial test machine - ckc, their dynamic stress and stress - strain relations with different frequencies were studied

    摘要以上海復興東路越江隧道底旁通凍結施工中的原狀和凍融作用后的暗綠色粉質粘土為研究對象,運用ckc循環三軸儀,採用不同的頻率來摸擬行車荷載進行室內動三軸試驗。
  8. Water control measures for drilling and blasting construction of tunnel cutting through yangtze river

    鉆爆法施工長穿的防水措施
  9. Taking in such sights as the central police station, the fringe club and the former french mission building, architect hosts will point out the special characteristics that make each structure unique as well as discussing its relevant history

    行程中,身為建築師的講者更會為您細說這些建築物的獨特之處,與您一同穿時光,分享這些建築物的故事,緬懷昔日香歲月。
  10. This paper studys some key technical problems produced by the inter - influence and inter - restrict between the tunnel travering engineering and changjiang river

    本文針對穿工程與長的相互影響,相互制約的關系而產生的幾個關鍵性問題進行了研究。
  11. 2. calculating and analyzing the scouring and filling up of engineering across section by using two - dimensions water and sand mathematics model which is put forward in this paper. the result provides foundation for engineering designing

    ( 2 )提出利用二維水流、泥沙數學模型計算分析了在出現極端水情下,工程過斷面沖淤的情況,為穿的軸線設計提供了依據。
分享友人