足力計 的英文怎麼說

中文拼音 []
足力計 英文
kpododynamometer
  • : Ⅰ名詞1 (腳; 腿) foot; leg 2 (姓氏) a surname Ⅱ形容詞(充足; 足夠) sufficient; ample; enough;...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. Arcuated built - up system bridges are one of bridge structural styles, which are used extensively at present. on one hand, because of complexity and diversity of this kind of structure, current engineering experiences have not satisfied design requirements no longer. on the other hand, towards this kind of structural system traditional methods simplify complicated structures into planar structures, these methods neglect apparently spatial action among members, especially those primary bearing load members along lateral direction of bridges

    拱式組合體系橋梁是目前廣泛採用的一種橋梁結構形式,一方面由於拱式組合體系橋梁結構的復雜性和多樣性,現有的工程經驗已不能滿需求;另一方面對于這種結構體系過去的傳統做法是將復雜結構簡化成平面結構,這種做法顯然忽略了構件之間的空間作用,尤其是沿橋橫向存在主要承構件。
  2. In recent years, plentiful and substantial fruits achieved by the lb method in simulations of hydraulics, multiphase flows, flows in porous media and heat transfer as well as magnetohydrodynamics, have revealed a broad perspective of application of this method, it will become a powerful competitor to the conventional approaches. in order to absorb the recent achievement in theory and application of the lb method, explore new ways in hydraulic computation to promote the development of practice, some work is car ried out in this thesis, as following : advances in the theory research and application, deductive process of the d2q9 model and some other commonly used models of the lb method are summarized. based on the hydrodynamic and general boundary conditions, a new joint boundary condition is presented, it integrates advantage of the two conditions above and obtains very good results in dealing with all kinds of boundaries of flow fields

    為了消化和吸收近年來lb方法在理論和應用方面的新成果,探索在水算方面的新途徑以促進lb方法實用化的發展,本文進行了下列研究工作:綜述了lb方法在理論研究和實際應用方面的新進展,以及d2q9模型的推導過程和其他一些常用的模型;在水動邊界條件和通用邊界條件的基礎上提出了一種新的聯合邊界條件方法,它綜合了上述兩種邊界條件的優點,在流場的各種邊界處理中取得了非常好的效果,經過模塊化的處理以後這種邊界條件具有更好的實用性;針對均勻網格的lb方法算效率較低的不,提出了雙重網格的latticeboltzmann方法,通過二維poiseulle流動、后臺階流動和渠道方槽流動三個算例的模擬,證明這種方法能夠明顯地提高流場模擬的算效率;此外,根據復雜區域流場的特徵提出了latticeboltzmann方法的分塊-耦合演算法,利用lb方法的算特性實現塊與塊之間的數據交換,充分利用算資源提高算效率,通過對「 t 」型、 「十」型和「 x 」型分岔管道流場的模擬,展示了這種演算法的特徵和優點,以及它所具有的應用前景。
  3. Then hydraulic calculation of the most disadvantageous district in ramiform pipe system is carried out. the influences of different design forms on the choice of piping diameter and fire pumps are also discussed

    針對枝狀管道系統,對滿條件的幾種最不利區域形式進行了水算,討論了這幾種不同選擇形式對系統管道管徑的確定和水泵選擇的影響。
  4. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水算程序,使程序可以滿圍海工程復雜工況下(如考慮內港洪水、算時段的變化、多口門、多庫容、多水閘)的龍口水算,並進行大量方案的比較和分析,提出合理算方案;利用面向對象的可視化編程語言vb進行界面開發,使算過程有良好的人機界面,更直觀地對算結果進行分析和處理;算結果的后處理採用vb編程實現龍口水要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水算,為堵口合龍提供科學依據。
  5. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大橋成橋線形滿要求和成橋內控制在設容許范圍內為目的,運用現代控制理論的思想,引用神經網路基本原理,詳細介紹bp神經網路的研究過程,從而建立預應混凝土連續梁橋施工預拱度的神經網路模型,並詳細討論了模型的神經網路結點信息的提取,在工程實例的基礎上進行了數值武漢理工大學碩士學位論文算,數值表明,將神經網路應用於預應混凝土連續梁橋施工控制,獲得了滿意的結果,在預應混凝土連續梁橋施工控制技術研究方面,具有方便有效、精度高的優點,具有良好的應用前景。
  6. Puts forward an improved method based on the theory in which the enthalpy difference is considered as the driving force in heat transfer under wet cooling conditions and thinks that the method can halve the testing work, require less for the experiment devices and reach higher accuracy

    認為該方法遵循了焓差是濕工況下換熱推動的規律,試驗工作量減少一半以上,對試驗裝置的要求降低,由試驗數據整理出的公式用於表冷器熱算完全可以滿空調常用范圍內的要求。
  7. Through the calculating example results and the comparisons with other calculating theories, it is proved that the calculating formulas of the combined geometry curve theory is valid, practical and accurate. it can be used in the calculation of line shape at the preliminary design, and can meet the engineering need. ( 3 ) this thesis researches systemically on the calculating theory of the suspension bridge ’ s cable system, including calculating design line shape and internal force, erection line shape of cable and pre - displacement of saddle without loads, the fixed position for erecting cable and amendatory method of cable ’ s unstressed length

    通過算例驗證了混合線形理論公式的實用性和正確性,並且與其它算理論的結果比較,證明公式有夠的精度,可用做初步設中主纜線形的算,能夠滿工程的需要; ( 3 )對自錨式懸索橋主纜系統算理論進行了系統研究,包括成橋線形和內算、空纜線形和內算、鞍座預偏量算、索夾安裝位置算和索鞍處主纜無應長度修正方法。
  8. The static and dynamic 3 - d finite element analysis for the intake tower shown that the stability and stress of the stucture satisfy the specification

    對進水塔結構進行靜、動算研究結果表明,其穩定、應均滿要求。
  9. Using piezoresistive accelerometers and magnetoresistance sensors measure the dynamic acceleration and geomagnetic field and through avr mcu software to calculate the attitude angular and azimuth. the fact of affecting the module is discussed in detail in this report and put forward the resolving scheme of key technology of digital filter, linear compensation, temperature compensation and magnetic field adjustment. the digital module has advantages of small size, light weight, low conception, high accuracy, all solid state and high reliability

    本課題採用壓阻式加速度和磁阻傳感器分別測量重加速度和地磁場,通過avrmcu軟體解算出姿態角和方位角,課題詳細分析了影響模塊性能指標的因素,就數字濾波、線性補償、溫度補償、磁場修正等關鍵的技術問題提出了可行的解決方案,研製的數字化模塊具有體積小、重量輕、低功耗、精度高、全固態、高可靠等特點,所有性能指標均滿要求,為姿態角測量提供了有效的手段。
  10. Practices show that the compressive strength, the modulus of elasticity, the permeability coefficient and the compactness of concrete obtained respectively by the compaction method, the unconfined compression static compaction method, the sand trenching and filling method, and nuclear densimeters meet the requirement of design, and the mixing proportion of concrete of the side - wall is reasonable

    實踐證明施工中用擊實法、無側限抗壓靜壓實法、挖坑灌砂法及核子密度儀分別檢測出的邊墻混凝土抗壓強度、彈性模量、滲透系數和密實度值均滿要求,邊墻混凝土配合比合理。
  11. Responsibility of factory capacity planning. come out feasible action plan to support loading

    負責工廠生產能劃,提供可行性方案,以確保夠生產能
  12. The optimization of water networks must meet the hydraulic constrains. so it is necessary to combine the optimization of water networks with the hydraulic analysis, and the performance of hydraulic analysis affects the optimization of water networks directly

    城市給水管網優化必須滿各種水約束條件,故在應用遺傳演算法對城市給水管網進行優化的過程中必須結合管網的水算,水算結果的好壞直接影響到優化結果的好壞。
  13. The main problem won1d be whether tenslle stregth conld sallsfy the demand of truck - 20 and trailer - 100. after calculating internal forces. it is confirmed that the t - shaped beams with 16. 8m per span can meet the demand, while the ones with 22

    通過內算,跨徑16 . 8mt梁能夠滿新的荷載條件下的各項標準,跨徑22 . 2mt梁採用更換預應鋼筋砼t梁方式解決。
  14. When the frame - tube structure is not so strong, the refuge story and facility story and the reasonable horizontal cantilever should be considered to form the high - rise building having rigid strengthened story. the big horizontal cantilever may be between the tube and frame

    框架-核心筒結構當抗側剛度不能滿要求時,可考慮沿豎向利用建築避難層、設備層空間,設置適宜的水平伸臂構件,構成帶剛性加強層的高層建築結構。
  15. Based on the tests, the advised formula of normal section bearing capacity and inclined section bearing capacity of high strengthen concrete frame columns are put forward, and the limit of axial compressive ratio and the minimum stirrup ratio in the encrypted region which meet ductility requirement to c60 concrete frame columns are given

    在試驗研究的基礎上,提出高強混凝土框架柱正截面和斜截面承載算的建議公式,且給出了滿延性要求的c60混凝土框架柱軸壓比限值和箍筋加密區箍筋的最小體積配箍率。
  16. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索、主梁線形、主梁關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿期望值的要求,滿橋梁施工范圍的要求,大橋主梁線形流暢,斜拉索、主梁和索塔三大體系的受狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  17. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性算方法; ( 6 )分別對本工程中的危巖體進行了穩定性算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核算,滿要求。
  18. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電站34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機試驗站絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從原材料進產,到成品出產的各項電器性能測試均能滿要求。
  19. The further research in port engineering pile foundation is considered to be important of such as behavior and bearing capacity of laterally loaded single piles and pile groups, and the functional mode of wharf foundation pile under flood tide torrent, and load - deflection curve, and negative skin friction along the pile, et al. the bearing capacity and the negative skin friction of port engineering piles are analyzed, to satisfy port engineering development demand better

    在港口樁基工程領域,港口工程水平承載(群)樁的工作性狀以及承載算方法,漲潮急流等動態荷載作用條件下碼頭基樁的受性狀,樁的作用荷載與變位趨勢關系、樁的負摩擦等問題都要求作進一步的研究。本文致於以港口工程樁基為主要研究對象,對港口工程(群)樁基水平承載和負摩擦進行研究,以更好地滿港口工程建設需要。
  20. The stress analysis and the fatigue life loss calculation of steam drum are carried out in this article. a simplification formula is proponed to calculate the main stress and is used in configuration of dcs. the rain - flow method is used to count the fatigue cycle, which can satisfy the need of on - line monitoring

    本文對其進行了應分析和疲勞壽命損耗的算,並提出主應算的簡化公式用於dcs組態,採用雨流法作為在線算的疲勞數方法,滿了壽命損耗在線監測的要求。
分享友人