跨接線路 的英文怎麼說

中文拼音 [kuàjiēxiàn]
跨接線路 英文
across the line
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Possessing special feeder lines and a fleet of container trucks, we can receive export and import cargoes transported by reailway, and provide services as discharging, dispatching, distribution and transiting etc. in shanghai or to all places of china

    擁有鐵專用、集裝箱運輸車隊,可承辦鐵進出口貨物進站、交、裝車發運、分撥轉運等業務及進出口貨物的市內運輸和省市貨物的轉運。
  2. By integrating all the latest information and active form gateway technology, the project connected the wireless communicating network, telephone network and internet to realize the alete bonding of information and widening the service scope of application system based on internet, thus the farmer could get the information from internet more delicacy and effectively, which will solve the " the lastly one mile " problem of fruiter information transferring

    摘要本項目綜合運用各種最新的信息技術以及主動式網關技術,將無通訊網、固定電話網和網際網絡連在一起,實現信息的無縫,拓寬了網際網絡上應用系統的服務范圍,使得基層農戶能夠以靈活方便的形式獲得網際網絡上的信息,有效的解決了果樹信息傳遞的「最後一公里問題」 。
  3. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫新田東面主要排水道的單行車道橋,以連沿該主要排水道東面近車輛輪候區的現有未命名道與淳裕
  4. The alignment of hk - swc starts from the new reclamation in dongjiaotou at shekou where the boundary crossing facilities are located, stretches across the ecologically highly valued deep bay waters, lands at the north - western part of the new territories at ngau hom shek. the hk - swc connects to yuen long highway via deep bay link

    深港西部通道的走始於將設有口岸過境設施的蛇口東角頭新填海區,橫有高生態價值的后海灣而落點于新界西北區的鰲?石,然後經由后海灣干到元朗公
  5. For the foundation treatment of the experimental segment of the south shore expressway of the hangzhou bay cross sea bridge, the in situ monitoring has been conducted for more than two years by use of vacuum - surcharge preloading

    摘要結合杭州灣海大橋南岸高速公試驗段工程,對真空堆載聯合預壓技術處理的試驗斷面進行了長達兩年多的現場測試。
  6. Based on above views, by analyzing power structure and building power system theory model, many important summations have been made which they followed : the texture of fdi is an none liner, many circle - roads and complex giant system which is made up by economics factors, political factors, systematic factors and the investors " psychological factors

    以上述觀點為基礎,通過分析動力結構,建立國際直投資動力機制理論模型,得出如下重要結論:國際直投資地域結構是由經濟因素、政治因素、體制因素以及決策者的心理因素等共同作用下國際生產資本國流動動所形成的非性、多迴的復雜巨系統。
  7. It is bounded by the lion rock mountain ( sze chi shan ) and tate s cairn ( tai lo shan ) to the north ; the kowloon peak ( fei ngor shan ) to the east ; new clear water bay road and prince edward road east to the south ; and junction road and lion rock tunnel to the west

    北面以獅子山及大老山為界,東臨飛鵝山,南新清水灣道及太子道東,西連聯合道及獅子山隧道。本區現有三條區公、多條連區內各處的區域干和兩條行車隧道(指其南面的出入口而言) 。
  8. The double - deck lantau link consists of the tsing ma bridge linking tsing yi to ma wan ; a viaduct over ma wan ; and the cable - stayed kap shui mun bridge linking ma wan to lantau

    青嶼干採用雙層結構,其組成部分包括連青衣與馬灣的青馬大橋、越馬灣的高架道,以及採用斜拉橋設計、連馬灣與大嶼山的汲水門大橋。
  9. But traditional fieldbus has been widly used in factory field and will act an important part for a long time, so it is necessary that to realize fieldbus connect to office network, make it has the capability of inter - connection and inter - operation, and keep it ’ s architecture unchanged. the paper discusses a method to slove the problem. that is making use of ethernet / ip protocol which is one of industrial ethernet protocols, to design an embedded fieldbus gateway. the gateway mainly consists of s3c2410, a 32bit high performance microprocessor based on arm core, to realize interconnection devicenet network, controlnet to ethernet

    本文提出利用高性能、低功耗32位risc結構的arm處理器與armlinux嵌入式操作系統相結合,並利用ethernet / ip工業以太網協議構造嵌入式網關,實現設備的現場總與企業信息網無縫鏈,並保證了devicenet和controlnet兩種網的互操作性,構建一個可地域共享、便於實現高層次集中管理、監控和決策的新型嵌入式實時在監控網
  10. The conventional connection circuit as the figure shows for two - wired transmitter : handhold terminal palm computer and external communication interface or mainframe communication circuit cannot directly bridges in the ends of power source. but may either meet on field ends a and b or meet on the ends of load resistance b and c. in the above - mentioned case, the circuit are supplied by power source

    對兩制變送器來說,傳統的連如圖所示:手持終端掌上電腦和外通訊介面或主機通訊電不能直在電源兩端,但既可于現場兩端a , b上,也可在負載電阻兩端b , c ,兩種情況下,電都要通過電源來供電, hart規范允許負載電阻為2301100 。
  11. It can undertake the construction of building for civil use ( below 6 story ) and industry workshop ( within 18m span ), and deal with other business, such as decoration, elecinstallment, equipment installment, paint anticorrosion, and boiler clean

    能承六層以下民用和18米度以內的工業廠房建築工程,同時還可承攬與建築相配套的內外裝修,電力、電纜、安裝,機電設備安裝,金屬結構製作安裝,油漆防腐,鍋爐清洗維修等工程。
  12. The tsing lung bridge, connecting tsing lung tau and north lantau, will be a landmark structure on the north lantau to yuen long highway section of route 10

    青龍大橋連青龍頭和大嶼山北部,是十號干北大嶼山至元朗公段最矚目的部分。青龍大橋的主
  13. The aluminum - alloy insulating strain clamps type nll nxj nxl, the jcb high - low - pressure insulating puncture paralleled clamps, 1kv 10kv 35kv cold - heat shrinkable cable terminals, cable joints, power transformer shields and 500kv line fittings produced by the company can meet the needs of upgrading urban and rural power grids and realize the span of fittings products from low voltage to high voltage

    為滿足城鄉兩網改造需要,公司生產的nll nxj nxl鋁合金絕緣耐張夾, jcb高低壓絕緣穿刺並溝夾, 1kv 10kv 35kv冷熱縮電纜終端,電纜中間頭,電力變壓器防護罩以及500kv金具,實現金具產品由低壓向高壓越。
  14. Notwithstanding the recommendations of the stage 1 study, this study concludes that the four roads in the crosslinks project ( dbl, tmpe, tmsb and dbcr ) are feasible and could be built without causing unacceptable environmental impacts, the only exception being the dbcr where it will be difficult to provide on - site or off - site mitigation for the residual ecological impacts. consideration should be given to an alternative route such as the tuen mun western bypass

    1盡管研究的第一階段已就計劃提出建議,但本研究結果顯示,新界通道工程項目(后海灣干、屯門港口快速公、屯門南繞道和后海灣海岸公)是可行的,並不會引致無法受的環境影響,唯后海灣海岸公除外,該公會帶來剩餘生態影響,若要在地盤以內或以外採取緩解措施,將遇到困難,因此須考慮如屯門西繞道等其他
  15. In the fourth chapter, a fourth - order chebyshev low - pass filter employs new low voltage, highly linear, wide inputting range transconductor is proposed, then we presents a new circuit to tune gm value of transconductor accurately, which employs a new switched - capacitor circuit to change the bias current of transconductor, a third order elliptical function low - pass filter with accurate tunable frequency has been designed using transconductor that is not only with voltage common - mode negative feedback, but also with varying bias - triode transistors which can improve the linearity of this circuit

    第四章:提出了一種新的低電壓、高性度、寬輸入范圍導,並由此設計實現了四階切比雪夫( chebyshev )低通濾波器,著提出了一種寬輸入范圍且具有電壓共模負反饋的全差分導,並採用一種新的開關電容電實現導值gm精確可調,從而可以設計得到高性能具有精確截止頻率的導-電容三階橢圓函數濾波器。
  16. By then, lo wu overcrowding would be well beyond the tolerable limit. " regarding the tunnel option, the spokesman said long valley is located very close to the existing east rail alignment

    有關隧道方案,發言人指?原與現有東鐵非常近,支由東鐵分叉伸出,必須架空過現有的東鐵軌。
  17. Without additional rail lines congestion was forecast on some sections of the tung chung line, the tsuen wan line, across the harbour and across the boundary with shenzhen

    倘若沒有新增客運,預料東涌、荃灣、過海及連深圳的界鐵均會局部出現擁擠情況。
  18. Change the appearance of the lines that connect network diagram boxes and prevent network diagram boxes from crossing page breaks

    更改鏈「網圖」方框的直的外觀並防止「網圖」方框過分頁符。
  19. The seven items are : ( 1 ) welding in the long - rail foundation

    一次性鋪設區間無縫的七個主要的作業項目為: ( 1 )長軌基地焊
分享友人