跨路拉線 的英文怎麼說

中文拼音 [kuàxiàn]
跨路拉線 英文
override stay
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 拉構詞成分。
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 拉線 : backguy; gur; tie line; guy wire拉線板 strain plate; 拉線工 lineman; 拉線盒 terminal box; 拉線機 ...
  1. The double - deck lantau link consists of the tsing ma bridge linking tsing yi to ma wan ; a viaduct over ma wan ; and the cable - stayed kap shui mun bridge linking ma wan to lantau

    青嶼干採用雙層結構,其組成部分包括連接青衣與馬灣的青馬大橋、越馬灣的高架道,以及採用斜橋設計、連接馬灣與大嶼山的汲水門大橋。
  2. The lantau link comprises the cable - stayed kap shui mun bridge and, of course, the spectacular tsing ma bridge, the span of which measures 1, 377 m, that making it one of the longest suspension bridge in the world carrying both road and rail traffic

    青嶼干由斜索結構的汲水門橋及宏偉壯觀凈度為1 , 377米的青馬大橋組成。青馬大橋更是世界上最長的道兩用吊橋之一。
  3. It trace s one of the paths of the ancient silk road across the karakoram mountains through the khunjerab pass, the highest international border crossing in the world elevation 4, 693 m

    沿著古老絲其中一條而行,穿過紅其甫山口,橫越喀喇昆侖山,紅其甫山口是世界最高的國邊界關口,海拔四千六百九十三公尺。
  4. Making reference to the anqing changjiang river highway bridge construction and the construction control, firstly, this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically, and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis. then on the basis of introducing the construction process of the anqing changjiang river highway bridge, analysis the construction course fully, and analysis comparatively the result of each girder segment construction simulation, and study the variation philosophy of the line style of large cable - stayed bridge during construction

    本文緊密結合安慶長江公大橋的主梁施工及施工控制實踐,首先系統地分析了斜橋施工控制模擬計算的整體思,並重點分析探討了斜橋施工過程計算的理論:理想倒退分析和實時前進分析,然後在介紹安慶長江公大橋主橋施工過程的基礎上,全面地計算分析了全橋的施工過程,並且應用施工過程計算結果,對每一個梁段的施工模擬工況進行對比分析,研究了大度鋼斜橋在施工過程中的形變化規律。
  5. The construction space for gonghe cable - stayed bridge is not enough because it crosses over the main hada electric railway which is under reconstruction

    沈陽市公和斜橋橫主幹,加上哈大電氣化鐵改造等原因,導致橋下施工凈空不足。