路程問題 的英文怎麼說

中文拼音 [chéngwèn]
路程問題 英文
path problem
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : Ⅰ動詞1 (請人解答) ask; inquire 2 (詢問; 慰問) question; ask about [after]; inquire about [aft...
  • : Ⅰ名詞1. (題目) subject; title; topic; problem 2. (姓氏) a surname Ⅱ動詞(寫上) inscribe; write
  • 路程 : distance travelled; journey
  • 問題 : 1 (需回答的題目) question; problem 2 (需研究解決的矛盾等) problem; matter 3 (事故或意外) tr...
  1. Be familiar with the technical process of breadboard and handling with different types of issues of projects

    經過將近一年的學習與實踐,熟悉線板工藝流以及對各類工的處理。
  2. In power system full dynandc simulation software, the adndttance matrixes of fault branches are adopted in the fault models to simulate arbitrary symmetrical and unsymmetrical faults, by use of contraction technique for adndttance matrix the multi - faults and the randomly occurred faults can be processed. the feature of this method is that the arbitrary multi - fault occurred in a branch can be simulated without any additional branches or buses to be added, thereby, the ca1culation efficiency and the expedience of usage are improved

    本文提出採用故障支導納陣處理復故障計算,該演算法可以對一條支發生任意重故障進行處理,而不需要增加支或節點,克服了目前常用的電力系統機電暫態序在處理復故障時,一般要按照事先預想的故障類型以及故障和操作發生的位置增加新的節點和小開關支
  3. Chen, jimmy xueming and danny wu. 1998. “ the problems and prospects of hot lane implementation in los angeles county. ” published on the 1998 ite annual meeting / trb hov meeting proceedings, toronto, canada

    陳雪明和吳曼宇, 「洛杉磯郡共乘車道專用收費公和前景」 ,發表在1998年《美國交通工師協會和交通研究暑專業會議論文集》上。
  4. A new systematic method for rock engineering design - mechanism pathway analysis is presented. it is pointed out that, by way of studying the internal mechanism network in rock engineering system, it is able to forcast the systems general behaviour characteristics so as to provide a reliable policy - making basis for the optimization design of the rock engineering of underground mines

    介紹用於巖石工設計的新系統方法? ?機理徑分析方法,指出通過研究巖石工系統內部的機理網,能夠預測系統的總的行為特性,能夠為地下礦山巖石工的優化設計提供可靠的決策依據。
  5. Unfortunately, the problem of finding multicast routing with qos constrained is a np - complete problem. so we can not solve the problem with the classical shortest path first algorithms such as bellman - ford and dijstra

    然而研究表明,由於qos組播由帶有多個qos約束參數,因此qos組播是一個np完全,這使得它與傳統的由過不同,難以用經典的最短徑優先演算法求解。
  6. Geoctechnical engineering in hydraulic engineering and highway engineering selection of soft ground treatment methods. optimization of design plans. and methods of field monitoring

    對水運、公項目的巖土工進行咨詢,就軟基加固方案選取、設計方案優化、監測方法等提供咨詢。
  7. It possesses not only the self - learning ability and adaptability, but also the function of self - adjusting factors. based on fuzzy set, neural network theory, the fuzzy control model and fuzzy neural network control model of multi variable system are presented. based on the automatic core - welding line of shop floor control system in yangzhou radiator plant computer integrated manufacturing system ( ys - cims / sfcs ), the fuzzy logic theory was applied to the controlling device and established the main heating room fuzzy temperature controller and finally was put into practical use

    本文採用了基於神經網技術的智能pid控制策略,設計了一類具有自學習和自調整比例因子功能的神經元網自適應pid控制器的結構及演算法;為解決結構不確定性的復雜多變量系統的控制,基於模糊集及模糊系統、神經網理論,建立了多變量系統的模糊控制模型及模糊神經網控制模型;針對揚州水箱廠計算機集成製造系統車間管理與控制系統( ys - cims sfcs )中的實際工,設計和開發了散熱器芯子烘焊自動線主烘腔溫度模糊控制器,解決了生產中長期存在的老大難,提高了產品質量,降低了單產能耗。
  8. Concretely we discuss the application of the shortest path problem, traveling salesman problerm and project management method on the touring itinerary improvement of travel agency. furthermore, we explore the use of minimum spanning tree problem, overlaid problerm and maximum flow problerm on the touring itinerary improvement of scenic spots. and also enclosed detailed spreadsheet solutions

    具體的,討論了最短、旅行商和排在旅行社線優化中的應用;討論了最小支撐樹、覆蓋和最大流在旅遊景區線優化中的運用,並在附錄中給出了詳細的電子表格解法。
  9. The builder bravely made an attempt to a series of unfavorable geological feature, complex geologic structure, and bad mountainous working region

    該條公在建設中遇到了諸多復雜的工,針對一系列不良地質水文情況,復雜的地質構造,惡劣的山區築環境,公建設者進行了大膽的嘗試。
  10. Research on paths between sources and flows becomes pressing and important during the development process of modern electric network

    現代電力系統快速發展過中出現的許多亟待解決的新的難點熱點使得電力網源流的研究變得十分緊迫和重要。
  11. Reactive tabu search algorithm for time - dependent vehicle routing problem with backhauls

    適應性禁忌搜索演算法求解帶回的時變速度車輛
  12. E. w. dijkstra. 1959. a note on two problems on conneion with graphs. numer. math. 1, 395 - 412

    陳慧琪,時間相依最短演算方法之研究,國立交通大學運輸工與管理學系碩士論文, 2000年。
  13. L. fu. 2001. an adaptive routing for in - vehicle route guidance system with real - time information, transportation research part b, 35, 749 - 765

    陳慧琪,時間相依最短演算方法之研究,國立交通大學運輸工與管理學系碩士論文, 2000年。
  14. The mathematical model of non - linear transient magnetic field excited by voltage source is established in this paper. it coupled with electric circuit equation and mechanical motion equation, could solve the transient problem excited by voltage source, and the effect of the eddy currents, non - linearity in magnetic materials and mechanical motion of medium is taken into account

    文中建立了電壓源激磁下的非線性瞬態磁場的數學模型,通過把瞬態磁場方、電及機械運動方耦合在一起,得出求解電壓源激磁下,考慮鐵磁材料的非線性、導電媒質的渦流及媒質機械運動等條件下的瞬態過
  15. The quality - of - service requirements for the timely delivery of multimedia information over mpls networks raise new challenge to current technology. one of key issues is traffic engineering. the goal of traffic engineering is two folds : guaranteeing the end - to - end service quality over differentiated service network and achieving global efficiency in resource utilization

    但是,即便是已經採用mpls技術的骨幹網,要提供高質量的傳輸服務仍舊面臨很多急需解決的,其中最具代表性的是流量工,即:如何有效分佈網負載,以在確保端到端服務質量的前提下充分利用網資源。
  16. According to the question of foundation engineering from test section ( lko + 900 to lk1 + 000 ) of xichang - - panzhihuang express highway, this paper put up important systems analysis and study on the deformation of roadbed which is filled by special stratum on site - - xigeda stratum

    本論文結合西攀高速公試驗段( lk0 + 900 lk1 + 000 )的地基工,重點對該區的特殊地層? ?昔格達地層填築堤的變形進行了分析和研究。
  17. To guarantee the feasibility of the rolling plan and improve the efficiency of the scheduling, a vehicle route problem model is proposed to model the problem and a hybrid optimization approach is developed to solve the problem

    摘要為了保證軋制調度計劃的可行性,提高排的效率,根據熱軋生產模式和軋制計劃的特點,利用車輛模型來建模軋制調度,並用一種基於離散人工免疫演算法的混合優化演算法來解決這一
  18. This paper, beginning with the world - famous erp software sap r / 3, studies the business process of erp software, clarifies the three characteristics of erp software, and discusses how to construct the business process system of the software and how the system be connected with enterprise entity. with regard to the carrying out of erp, the thesis provides two methods of basic data collecting which are compensation to each other. as to the phenomenon that erp are commonly carried out with low success rate in china, the paper makes a deep research into bpr which is closely associated with the operation of erp, and proposes the suggestion that a proper bpr route should be chosen according to the practical conditions of the enterprise

    本文從關心民族erp軟體應如何發展和中國實施erp成功率不高的角度出發,從一流erp軟體sapr 3著手研究了erp軟體中的業務流,構造了erp軟體如何與企業的業務流相映射和如何規劃企業業務流的一套體系;討論了erp實施中的基礎數據收集,給出了兩條互為補充的基礎數據收集方法;結合前人的研究結果和筆者在企業的實習經歷,討論了在中國的環境下與erp相結合的bpr的兩條徑。
  19. In this paper, the influence of construction error on super high - rise steel structure performance is analyzed with satwe and etabs based on an actual project, aim to provide some references for the similar projects

    本文結合實際工,利用satwe和etabs兩種不同的軟體就施工偏差對高層鋼結構結構性能的影響進行了深入的分析和總結,為類似工的解決提供思和參考。
  20. For short tunnel diffilut to lay wire, it was a kind of effective means to adopt the form of unite arch tunnel. and now unite arch tunnels have been constructed in many highways

    對于那些布線困難的短地段,採用聯拱隧道形式,是一種解決工的有效手段,現已在許多高速公上修建了聯拱隧道。
分享友人