路面拱度 的英文怎麼說

中文拼音 [miàngǒng]
路面拱度 英文
camber of paving
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 路面 : road surface; pavement; roadbed路面板 road deck; roadway slab; 路面標高 grade elevation; 路面標線...
  1. Strategically located at the gateway of zhuhai, the grand bay view hotel is a luxurious 5 - star business hotel with unsurpassed accommodations. the grand bay view hotel is the ideal address and a perfect choice for business or leisure

    珠海海灣大酒店座落於珠海北情侶南,背靠蒼翠欲滴的將軍山,臨碧波浩蕩的南中海無論是商務公幹還是休閑假,海灣大酒店必然是你的首要之選。
  2. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大橋成橋線形滿足設計要求和成橋內力控制在設計容許范圍內為目的,運用現代控制理論的思想,引用神經網基本原理,詳細介紹bp神經網的研究過程,從而建立預應力混凝土連續梁橋施工預的神經網模型,並詳細討論了模型的神經網結點信息的提取,在工程實例的基礎上進行了數值計武漢理工大學碩士學位論文算,數值表明,將神經網應用於預應力混凝土連續梁橋施工控制,獲得了滿意的結果,在預應力混凝土連續梁橋施工控制技術研究方,具有方便有效、精高的優點,具有良好的應用前景。
  3. Taking the 4th binhai road bridge in the development zone of dalian city as an example, this paper presents the key points of the overall design, plane and spatial static analysis, stability analysis and construction technology of long span half - through concrete filled steel tube arch bridge

    摘要以大連市開發區濱海四號橋為例,介紹大跨中承式鋼管混凝土橋的總體設計、平靜力分析、空間靜力分析、穩定分析和施工工藝的要點。
  4. A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given

    建立施工預的數學模型,根據施工時的預應力張拉后等工況橋實測標高與設計值的差異,用bp神經網識別預模型的參數,確定有關各截的預值。
分享友人