軋制鋼軌 的英文怎麼說

中文拼音 [zhìgāngguǐ]
軋制鋼軌 英文
roll out steel rail
  • : 軋動詞[方言]1 (擠) press hard against each other; push against2 (結交) associate with; make f...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1. (路軌;軌道) rail; track 2. (比喻辦法、規矩、秩序等) rut; path; course Ⅱ動詞[書面語] (遵循; 依循) follow
  • 鋼軌 : rail; metals; steel rail; railroad rail鋼軌間隙 dilatation joint; 鋼軌聯接板 joint bar; splice ba...
  1. Iron and steel products. hod - rolled. 46 kg m flat bottom ralway rail and fishplate

    鐵產品.熱.每米46kg重平底和魚尾板
  2. Iron and steel products. hod - rolled. 55 kg m flat bottom railway rail and fishplate

    鐵產品.熱.每米55kg重平底和魚尾板
  3. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包廠精整車間吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、動桿件斷裂、吊車啃等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接吊車樑上部區域疲勞破壞的機理,分析了重級工作吊車梁出現疲勞裂縫的原因,定了初廠精整車間破損吊車梁的加固方案;最後就重級工作吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  4. In order to be more typical and practical, the theses pays more attention to analyzing the quality control of the rail - girder factory of panzhihua steel - iron company. the factory is a highly automatic and mechanized heavy rolling mill. it has been practicing a relatively effective quality control for about 20 years

    為使文章更具代表性和實用性,本文著重分析了攀梁廠的質量控,攀梁廠作為一家機械化、自動化程度較高的大型廠其質量控工作已經開展了20多年,應該說是比較成熟的。
  5. Specification for tyres for crane rail wheels - forged or rolled steel double flanged rail wheels and tyres metric units

    起重機輪用輪箍規范.第2部分:鍛雙法蘭輪與輪箍
  6. Fishplates for railway rails - specification for rolled steel fishplates

    鐵路用魚尾板.第1部分:魚尾板規范
  7. Test method for sampling and testing for ash and total iron in steel mill dispersions of rolling oils

    油懸浮液中灰分及總鐵量的取樣及測試的試驗方法
  8. Iron and steel products. hot - rolled. 30 kg m flat bottom railway rails and fishplates

    鐵產品.熱.每米30kg重平底和魚尾板
  9. The results show that the bottom area of the steel rail is rolled severely during rolling process, and thus resulted in the local plastic deformation, hardening and concentration of inclusions in the bottom area, leading to the premature fracture of the steel rail

    分析認為:過程中道底部區域收到嚴重碾壓,產生了局部塑性變形和硬化,局部區域夾雜物集中,導致斷裂。
分享友人