軟水站 的英文怎麼說

中文拼音 [ruǎnshuǐzhàn]
軟水站 英文
water softening station
  • : Ⅰ形容詞1 (質地不硬) soft; flexible; supple; pliable 2 (柔和) soft; mild; gentle 3 (軟弱) we...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. This software can not only measure the real time data of hydroelectric plant, but also carry out the auto generate electricity on the hydroelectric plan t and ordinal startup - stop of the dynamotor. the software also carrys out the functions of alarm disposal, report forms, print and load curve

    體不僅實現了對內各種模擬參數和數字信號的實時監測功能,還實現了對的自動發電、機組順序啟停的控制,以及報警處理、報表列印、負荷曲線等功能。
  2. At the end of the dissertation, example calculation is given under multi - loading cases using the agc software of hydropower station based on dcpm - fga

    最後,運用所設計的廠內agc控制體對某電進行了多個功率點多工況條件下的實例計算。
  3. Design of drainage system for tailrace surge chamber and use of high strength pervious hose at ertan hydropower station

    二灘調壓室排系統設計及高強透管的應用
  4. The guizhou xishui power station ' s 135mw set are regareded as a example, the paper sets up a electric system ' s dynamic maths model, exploits a control configuration software basely on dcs power station simulator, and designs a software of simulator ' s logic protect ( include electric logic ) and control

    以貴州習電廠135mw機組模擬機的開發為實例,本文建立了以電氣系統為對象的動態數學模型,開發了一個基於dcs電模擬機的控制組態體,並應用該組態體設計了對象機組的邏輯保護(包括電氣邏輯)及控制部分的模擬體。
  5. Starting with the application of power plant simulator, and for purpose of solving the practical problems of discommodious ness 、 subjective test result in the test of simulator training, summarizing the experience in the research and apply of the scoring system software of the test of simulator training, a operating skill model is built and a design for universal scoring system for the test of simulator training is brought forward based on the operating knowledge of power plant equipment and simulator and the theory of expert system. and the scoring system is realized by programming

    本文從電模擬機的實際應用出發,以解決當前模擬機培訓考核中考核不方便、考核結果有失客觀性等實際問題為目的,總結目前關于模擬機培訓考核成績評定系統體的研究和應用的經驗,以電設備和模擬機的各種運行知識為基礎,並結合專家系統的理論,建立一個評價模擬機學員操作平的模型,提出了一種模擬機培訓自動評分系統的設計方法,並通過編程實現了這個成績評定系統。
  6. Ln power system full dynandc simulation, the electric - mechanical transient processes of dynamic elements of power system should be simulated in detail, and the detailed dynandc models of mid - term and long - term processes are necessary based on the research and analysis for the ndd - term and long - term models, the dynandc models, such as thermal power plant, hydraulic power plant, nuclear power plant and the automatic generation control ( agc ), which are necessary to power syst

    電力系統全過程動態模擬除了需要詳細模擬電力系統動態元件的機電暫態過程外,還要有詳細的中長期過程的模型。本文在綜合調查和分析的基礎上,研究了電力系統全過程動態模擬所需要的火電廠動力系統的數學模型、電廠動態模型、壓堆核電模型以及自動發電控制( agc )模型及其演算法,並在電力系統全過程動態模擬體中得到了實現。
  7. Therefore a physics - based conceptual model for forecasting in the cold zone of china is established, and the effectiveness of the model has been proved by practical operation in three basins of dunhua, changding and hengdaohezi. finally, for the purpose to popularize the presented model, a software system is completed and some new ideas are created in the system such as the interface design, selection of methods, option and integration of the procedures and so on. the system has been working very well in several basins in the north - east of china

    為使模型能夠得到推廣應用,使研究成果變為生產力,還建成了寒區文預報體系統,在系統的研建過程中,經過反復修改和完善,在界面設計、預報方法選擇、預報方案生成和串接、系統的維護擴展、庫防洪調度、報汛測的設置和變動等六個方面具有鮮明特色,使建成的系統具有實用性、通用性、友好性、可擴展性等優點,受到用戶的一致好評。
  8. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  9. At the same time, an old version of application system - - - - long - distance watch system for pumping station of wuhan city will be reformed according to the new construction system

    此外,還要利用新應用體體系結構來改造一套舊版應用程序系統? ?武漢市排遠程監測系統。
  10. In this scheme, ethernet is applied to infranet, and opc technology is used to data acquisition from local control unit. socket communication and java applet technology are used to realize real - time data exchange. according to the design project of hydro power remote monitoring and control system, a remote monitoring experiment system is designed in this thesis

    論文以自動化改造項目為背景,設計了中小型的遠程監控系統,提出了基於web的中小型遠程監控系統的具體硬體結構方案和體的整體設計思路,控制網路採用工業以太網,實現了控制網路與信息網路的融合,應用opc技術進行數據採集,使用javaapplet和socket通信技術解決遠程實時通信問題。
  11. In order to direct the water to the forebav of the pump station from the original canal, a channel long 135 m is designed. it crosses through the terrain top with a depth of more than 50 m. soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes

    東深供工程金湖泵位於塘廈鎮東面,屬低山、殘丘地貌,地面高程22 60m ;泵前池進渠橫切山脊,連接原東深供河,設計開挖1條長135m的進渠,坡高50多米,邊坡土質為強風化的粉砂質泥巖,網狀裂隙發育,結構面基本與坡面重合;坡體土質中含有較多的粘土礦物,具有遇化的特性。
  12. The aim of this research project is to supply the technical preparation for the nuclear power station domestalization and autonomous design, to improve the design quality and level, to ensure the reliability of the sealing system in the advanced pressurized water reactor vessel, to ensure the nuclear safety, and to raise the design software level of the nuclear vessel sealing system to the advanced world class

    本課題研究的目的是為核電國產化及自主設計提供技術準備,提高設計質量和設計平,確保先進壓堆核容器密封系統設計的可靠性,確保核安全,使核容器密封設計體達到世界先進平。
  13. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩的設計方案,對輪機調節系統,按長引管道復雜引系統、彈性擊、調速器為pid調節規律,在小波動情況下,對包括引道、調壓井、尾管、輪機、發電機、調速器在內的輪機調節系統建立數學模型,並計及引管道力摩阻損失,對輪機、調速器考慮了其中的非線性,利用功能強大的matlab體編制了源程序進行計算機模擬計算。
  14. Introduce the theory and development of gis and the popular software of webgis. analyze the present status of hydrologic network ' s information and bring forward the necessity of applying webgis to management of the information of hydrologic network

    Gis基本理論、 webgis發展狀況及主要webgis體產品;分析了網信息管理的現狀,提出了應用webgis技術管理網信息的必要性; 2
  15. These simulations include the stability analysis, and dynamic variety while the influent and the feedback coefficient are variety. 5. an auto - control system project used in wastewater treatment plant based on ethernet and plc is introduced ; and for the pumping station, using dynamic programming ideology, builds a model with the least running - time optimization goal, and introduces the software realization using plc

    以作者負責的一個項目為例,詳細的介紹了如何基於工業以太網和plc實現污處理廠的全廠實時自動監控系統;同時,對污處理廠的重要環節?污,應用動態規劃思想,建立以泵組使用時間最短為優化目標的數學模型,並介紹了該模型基於plc的體實現。
  16. This text takes hydropower station of hunan town of wuxijiang river as an example, introduce hydro - generator unit operation parameter survey principle and method of the operation parameters online monitoring system for hydro - generator unit in detail, and carry on certain analysis by disposition and composition of hardware to system, design and realizing going on intact description of the software especially, make introduction of a certain degree to involve about database and communication technology at the same time

    本文以烏溪江力發電廠湖南鎮電為例,詳細介紹了輪發電機組效率監測系統所監測參數的測定原理和方法,並對系統硬體的配置和構成進行了一定的分析,重點對體的設計和實現進行了完整的描述,同時對涉及到的有關數據庫和通信技術都做了一定程度的介紹。
  17. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山抽蓄能電地下廠房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區邊界上的位移場,藉助州sys有限元分析體,獲取模型邊界節點的坐標信息,然後通過ansys體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  18. Then it presents the control scheme. the whole control system composes of supplying water subsystem, purifying water subsystem, life sewage water subsystem, disposing waste water subsystem and rainwater pump room subsystem. every subsystem is a suit of absolute plc control system

    整個控制系統由鍋爐補給系統、凈系統、生活污系統、工業廢系統和雨泵房系統五個子系統組成,每個子系統都是一套獨立的plc控制系統,各個子系統的控製程序均採用modicon公司的concept2 . 5編程體編制。
  19. The paper is written by way of background as remote monitor system in tianshi pump station as well as my own factual labor fruit, in order to carry on discussing about research and construction of remote monitor system for large - scale pumping station. the paper mainly deals with five aspects : 1. describing problems existed now and trend in the future on remote monitor system for large - scale pumping station. 2. providing network integration project of constructing remote monitor system for large - scale pumping station

    本文是以田市抽遠程監控系統為背景,結合筆者實際工作成果所撰寫的,旨在對大型泵監控系統的建設進行研究與探討,全文主要涉及到以下五個方面: 1 、論述了大型泵監控系統目前存在的問題和今後發展趨勢; 2 、提出了組建大型泵監控系統的網路集成方案; 3 、提出了利用com 、 dcom 、 activex 、 opc組件技術實現各種監控系統之間的集成方案,並在田市抽實現閉路視頻監控網路、配網自動化網路和機組控制網路的無縫集成; 4 、進行監控系統通訊體分析與開發,實現監控系統與第三方設備通訊; 5 、結合大型泵一般特點,引入聚類融合控制,實現田市抽的機組優化控制。
  20. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )收集整理漫灣大壩運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大壩的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經網路非線性映射功能,建立了神經網路時間序列預測模型; 3 )以ansys體為平臺,開發了漫灣砼重力壩運行狀態評價模塊,結合荷載效應分析、參數反演分析、參數預測分析三個模塊組成漫灣砼重力壩運行狀態分析系統;實現了對漫灣運行狀態的動態「反演-預測」分析; 4 )利用漫灣砼重力壩運行狀態分析系統,在漫灣大壩實測資料分析、大壩砼特性參數反分析、大壩砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩運行狀態。
分享友人