軸心鐵 的英文怎麼說
中文拼音 [zhóuxīntiě]
軸心鐵
英文
rynd-
Therefore, in december 2000 the bureau of transportation of taipei city government completed a feasibility study for an lrt system in the taipei shin - yi district. this study recommended the adoption of an lrt system with a standard track gauge, power supply from overhead wires, two or three cars per train, a length of 90m for platforms, a certificate system for fare payment, consideration of the possibility of using electronic sensor ticketing systems, type b right - of - way for at grade sections, and signaling control for passing priority at the intersections. the study also proposed an initial lrt line of 9. 6 kilometers in length with 9 stations
現代化輕軌運輸系統之運輸效能已較電車系統大幅提升,以一般採用b型路權為主,少部分a與c型路權之系統而言,每小時單向運能達到5 , 000至15 , 000人次,介乎高運量捷運與公車系統之間,適合擔負都會地區市郊與市中心區的聯絡路線、市中心區集散路線、鐵路與捷運系統接駁路線、都市周邊環狀線、特定區間(新市鎮)聯絡線、都會區次要運輸走廊運輸主軸等服務類型。I fancy d i could make all but the wheel, but that i had no notion of, neither did i know how to go about it ; besides i had no possible way to make the iron gudgeons for the spindle or axis of the wheel to run in, so i gave it over, and so for carrying away the earth which i dug out of the cave, i made me a thing like a hodd, which the labourers carry morter in, when they serve the bricklayers
可做輪子卻不那麼容易,我簡直不知從何處著手。此外,我也無法做一個鐵的輪子軸心,使輪子能轉動。因此,我決定放棄做輪子的念頭,而做一個灰斗似的東西-就是小工替泥水匠運泥灰用的灰斗,這樣就可把石洞里挖出來的泥土運出來。The straight transverse axis shall be parallel with the present crooked jianshe avenue ( qingnian road - hanxi section ), connect to nanniwan avenue in the west and form the along - river traffic system parallel to yangtze river and hanjiang river ; the road shall pass through the core of wangjiadun cbd, connect with entry and exit of subway station, underground parking lot and basements of high - rise buildings, to form the comprehensive underground space ; the road section close to hanxi shall be connected to the tunnel of nanniwan avenue via through cut, therefore integrating the western residential zone in space
橫軸對建設大道(青年路-漢西段)裁彎取直,西與南泥灣大道相接,形成與長江、漢水平行的順江交通系統;該道路貫穿王家墩商務核心區,與地鐵出入站、地下停車庫以及高層建築地下層相銜接,形成綜合地下空間;靠近漢西路段以路塹形式與南泥灣大道隧道相接,在空間上使西部居住區形成整體。According to the train of thought of strengthening the center, radiating around an axis, carrying the work forward gradiently, then driving the whole province forward, we can make an overall distribution, and create a metropolitan area with the core of nanchang, with an axis of developing the towns along the line of jing - jiu and zhe - gan railways and with a secondary axis of developing the towns along the line of no. 105, no. 206 and no. 323 national road
按照「強化中心、軸線輻射,梯度推進、帶動全省」的思路進行總體布局,使之基本形成以南昌為核心的大都市區,京九鐵路和浙贛鐵路沿線的城鎮發展為主軸帶,及沿105 、 206 、 323國道城鎮發展為次軸帶的發展態勢。Report back in the exhibit schedule : march 8, 2006 - 10 days am09 : march 10, 2006 - 12 days remove time : march 12, 2006 exhibitors range : car, car, motorcycle, light truck bearings, railway bearings, magnetic bearing spindle ; aviation aerospace marine bearings, rocket and satellite bearings ; industrial robot bearings, machining center and machine spindle bearings, textile machine bearings, motor bearings, and farm machinery bearings, paper machine bearings, bearings press, bearing mill, metallurgical mining, petrochemical machinery bearings, bearings sporting goods, marine rig bearing ; bearings, bearings gyroscope, high - precision bearings, high - speed bearings, linear motion bearings, needle roller bearings, thrust bearings, ultra - low - temperature bearings, special bearings, ceramic ball bearings, spherical with trophies bearing miniature bearings, quiet motor bearings, ball bearings, roller bearings, lubricating bearings corrosion resistant bearings, bearing joints ; bearing ring blank refinement, precision ball and roller crown, with nails cage
撤展時間: 2006年03月12日參展范圍:轎車汽車摩托車輕型車軸承鐵路軸承磁懸浮軸承電主軸航空航天航海軸承火箭及人造衛星軸承工業機器人軸承加工中心及機床主軸軸承紡織機軸承電機軸承農機軸承造紙機軸承印刷機軸承軋機軸承冶金礦山石油化工機械軸承體育用品軸承海洋鉆機軸承組合軸承陀螺儀軸承高精軸承高速軸承直線運動軸承滾針軸承推力軸承超低溫軸承特種專用軸承陶瓷球軸承帶座外球面軸承微型軸承靜音電機軸承球軸承滾子軸承潤滑軸承耐腐蝕軸承關節軸承軸承套圈精化毛坯精密鋼球凸度滾子帶釘保持架軸承滾動體等軸承部件。4. to get the motor ' s performance by calculation with known formulas, as a result an adjustment for the motor ' s configuration can be practised. when a combined method of altering the length of armature, the number of turns in the winding and the dimension of permanent magnet is used. 5. to get the motor ' s performance when it is driven by the power converter. finally, the calculated data are compared with the experimental measurements, so as to verify the rationality and reliability of the method
Q採用數值分析直軸負載磁場和交軸電樞反應磁場的方法來計算,得到較為準確的結果;根據電機工作特性的計算公式計算電機性能,由計算結果調整電機的結構,而調整工作使用改變電機鐵心長度、繞組匝數和永磁體尺寸相結合的方法,這樣可以得到較為理想的結果;對變頻電源供電時電機的工作特性進行計算,以檢驗其變頻時的性能。The beijing - tianjin inter - city passenger rail will serve as an axis in the regional rail network, to meet the soaring demand of travel between the cities
京津城際客運列車也將作為該區鐵路運營的軸心,滿足兩城之間日趨緊張的鐵路運輸的需要。Information on the enterprise beijing zhongtian ruihua scientific trade co., ltd. and their services, like rehabilitation and collect on one hand and thigh and control technology on the other, is available in the firm profile
公司專業從事積蓄、收集、聚集、身體復原、恢復以及軸頸、腿、柱、 (量角器的)臂、鐵心、彎管、曲柄、邊腳、 (角焊縫的)焊腳和控制技術學業務。Standard specification for roller, bearing, needle ferrous, solid, spherical end
球端實心針式鐵類滾柱軸承的標準規范From a transportation point of view, a modernized light rail rapid transit system is more efficient than streetcars. most lrt systems adopt type b right - of - way regulations. few have used types a or c. their capacity stands between heavy rail rapid transit systems and bus systems, in that they can carry between 5, 000 and 15, 000 passengers per hour in a single direction
現代化輕軌運輸系統之運輸效能已較電車系統大幅提升,以一般採用b型路權為主,少部分a與c型路權之系統而言,每小時單向運能達到5 , 000至15 , 000人次,介乎高運量捷運與公車系統之間,適合擔負都會地區市郊與市中心區的聯絡路線、市中心區集散路線、鐵路與捷運系統接駁路線、都市周邊環狀線、特定區間(新市鎮)聯絡線、都會區次要運輸走廊運輸主軸等服務類型。Ps : the oblique surface of talfon is the ball contacting surface ; ball and spindle shall be matched correctly
鐵氟龍斜度面為球珠接觸面;球珠與軸心配對位置必須載放正確。Dismantle distributor lid, rotate shaft to make casing 1 of touch off gear to point to the iron core center of hall sensor. at this time distribution head is positioned at casing 1 of distributor
拆下分電器蓋,轉動轉動軸,使觸發輪1缸缸口正對霍爾傳感器鐵芯中心,此時分火頭在分電器1缸位置處;Finally, a compact uwb pulse source composed of pzt95 / 5 ferroelectric ceramic, a 50 coaxial transmission line charged by a pulse transformer, a peaking - chopping switch, a coaxial matched load and a pulse diagnostic system was built and tested, which can produce pulse voltage on a matched 50 load with peaking voltage of 100kv, rising time of 870ps, falling time of 670ps, and fwhm of 1. 410ns
在上述工作的基礎上,我們研製了一臺以pzt95 5鐵電陶瓷沖擊去極化為能源的新型緊湊型脈沖發生器。該發生器由pzt9515爆電能源、空心脈沖變壓器、單同軸脈沖形成線、 pc開關、同軸匹配負載和脈沖診斷系統組成,能產生100kv 、上升前沿870ps 、后沿670ps 、脈寬1 4us的超寬帶脈沖。D. clean the slots of o - rings, talfon slots, body spindle and spherical surface intensively
形環溝槽,鐵氟溝槽,主體軸心孔及球面加強清洗。Landscape area prominent personality, is the main axis of space design node ; entrance plaza, sports park plaza and the mtr to form secondary nodes
中心景觀區突出個性,是軸線空間的主要設計節點;入口廣場、體育公園和地鐵廣場形成次要節點。分享友人