軸線水道 的英文怎麼說

中文拼音 [zhóuxiànshuǐdào]
軸線水道 英文
axial stream
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 軸線 : 1 [機械工程] axis; axle; [地質學] axial trace; axial cord; axis shaft line; shaft line 2 [紡織] s...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧潛在的主要地質災害(塌方、涌、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  2. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大平主應力方向與隧小角度相交,對隧圍巖穩定性有利;根據現場應力解除法測試結果,目前鷓鴣山隧尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  3. With regard to the second phase water supply pipe project of no. 4 dongguang waterworks, an introduction was given to the selection of pipe jacking system, measures for resistance alleviation, application of intermediate jacking room, and control of axes in jacking construction of long distance steel pipe with large caliber, these may provide the reference for the construction of resembling project

    摘要結合東莞市第四廠二期給工程過107國段的頂管施工,介紹了大口徑鋼管進行長距離頂進施工時頂管機的選型、減阻措施的選用、中繼間的運用、控制等問題,可供以後同類工程參考和借鑒。
  4. The use of the double eccentric structure in the butterfly plate so as to the horizontal valve shaft is lifted a little distance above the pipe central line, and it makes that the area of lower half part butterfly plate is bigger than upper part

    該閥採用雙便心閥板,平安裝的閥在管中心上抬高一定距離,使閥板下半部分迎面積大於上半部。
  5. The hotel in 1996 to conduct a comprehensive transformation, a five - star hotel by international standards redesigned by beijing chinese landscape garden design research center and the nanjing jin design engineering limited common design teacher, a french palace - style architecture of the main architectural style, from french garden plaza with axes, tanks, radiation shape and mould designs roads covered grass look green portfolio, the entire building full of euro customs groups, zhuhai rare indeed for the modern garden - style hotel

    該酒店於1996年進行全面改造,按國際五星級酒店標準重新設計,由北京中國風景園林規劃設計研究中心及南京金海設計工程有限公司的名師共同設計,建築主體採用法國宮廷式的建築風格,廣場借鑒法國宮苑,以池放射狀路及模紋綠毯草渾然組合,整個建築群體充滿了歐陸風情,確為珠海市不可多得的現代的園林式酒店。
  6. In this paper, an approach of the systematic artificial neutral net was introduced into the analysis on the ship - against - bridges probability with a computer programs. based on the basic data of the present 12 typical bridges as the sample, 4 chief influential factors as the input coefficient, such as the bridge span, the water flow rate, the incline angle between water flow direction and the direction normal to bridge axis, and the curve in the course near the bridge area, with the ship - against - bridge probability as the output coefficient, the intelligent judging system of the ship - against - bridges probability reflecting the influence of the above input parameters is obtained after training

    本文首次將人工神經網路系統方法引入了船撞橋概率的研究當中,編制了計算程序,成功地以現有12座典型橋梁的基礎數據為樣本,以橋梁跨徑、流流速、流方向與橋的夾角以及橋區航彎曲度等4個船撞橋主要影響因素為輸入參數,以船撞橋概率為輸出參數,經訓練得到了能較好地反映上述輸入參數影響的船撞橋概率判斷系統。
  7. The axial - flow turbine generator set is suitable for low head from 2m to 70. its feature is that the water flow passes through the runner axially. the axialflow turbine generator set can be classified into two forms according to the runner construction : one is fixed blades propeller for small variation of head and power, the other is movable blades kaplan for large variation of head and power

    貫流式輪發電機組是低頭大流量電站的較好機型,一般適用於頭2 ~ 15米,其特點是流從進口到尾出口都是向的,流基本上成直,因而貫流式輪發電機組具有流特性好,效率較高等特點。
  8. A flap vlave used in pumping station is a kind of hydraulic - operated automatic gate, which is similar to a hinged check vaive. because of their simple structure and reliability, being able to shorten the length of outlet passage and facilitate the starting of pumping system in comparison with siphonic vacuum - distroied cutoff scheme. so it is propitious to be used and save investment but at the same time, flap valves always show some disadvantage

    因拍門簡單、可靠,與虹吸真空破壞截流閉鎖方式相比,可以縮短出(流)長度,並利於泵系統起動,與快速閘門相比,拍門也有諸多優點,閘門門體易關閉不到位或卡住不能活動,因為門槽和?塊較孔容易殘留異物,閘門門體克服滑動阻力不僅無機械增益,且阻力和動力不在一直上,門體易傾斜而自鎖,而拍門的工作可靠性則遠高於快速閘門。
  9. 2. calculating and analyzing the scouring and filling up of engineering across section by using two - dimensions water and sand mathematics model which is put forward in this paper. the result provides foundation for engineering designing

    ( 2 )提出利用二維流、泥沙數學模型計算分析了在出現極端情下,工程過江斷面沖淤的情況,為隧穿越長江的設計提供了依據。
分享友人