輔助礦井 的英文怎麼說
中文拼音 [fǔzhùkuàngjǐng]
輔助礦井
英文
service shaft- 輔 : Ⅰ動詞(輔助) assist; complement; help Ⅱ形容詞(輔助) subsidiary Ⅲ名詞1 (車輪外旁增縛夾轂的兩條...
- 助 : 動詞(幫助; 協助) help; assist; aid; support
- 礦 : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
- 井 : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
- 輔助 : 1. (從旁幫助) assist 2. (非主要的) supplementary; auxiliary; subsidiary
- 礦井 : [采礦工程] mine; pit; grube; groove; shaft; wheal; underground mine
-
Discussion on auxiliary trackless transport in coal mine
煤礦井下無軌輔助運輸Auxiliary ventilation for mining ; sheet airducts, with collars and loose flanges
礦井用輔助通風設備.帶卡圈和活動法蘭的鋼制通風管Auxiliary ventilation in mining ; flexible plastic air ducts for forced ventilation ; flat air ducts
礦井輔助通風設備.強制式通風設備的柔性塑料空氣導管Auxiliary ventilation for mining ; flanged sheet metal reducers
礦井輔助通風設備.帶法蘭的薄金屬板制異徑接頭Auxiliary ventilation for mining ; sheet metal reducers with flange and shoulder
礦井輔助通風設備.帶法蘭和凸緣的薄金屬板制異徑接頭Mathematical model for computer aided lectotype design of mine ventilator
礦井通風機計算機輔助選型設計的數學模型Auxiliary ventilation for mining ; cladding material for flexible airducts ; requirements, testing
礦井輔助通風設備.撓性通風管用包層材料.要求檢驗Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency
文摘:協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency
協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。Reformation of auxiliary haulage system in fully mechanized coal face of wutongzhuang coal mine
梧桐莊礦井綜采工作面輔助運輸系統的改進Coal well auxiliary coveyance use in bulianta coal mine
礦井輔助運輸在補連塔礦的應用Trackless continuous auxiliary haulage realized in the mine of great depth
在大埋深礦井條件下實現連續無軌化輔助運輸分享友人