轉速發送器 的英文怎麼說

中文拼音 [zhuǎnsòng]
轉速發送器 英文
rotational speed sender
  • : 轉構詞成分。
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  • : 名詞(頭發) hair
  • : 動詞1 (運送; 傳送) deliver; carry 2 (贈送) give as a present; give 3 (伴送; 送別) see sb of...
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • 轉速 : speed; revolution; rotation rate; speed of revolution; rotating speed; rotational speed轉速指示器...
  1. This thesis focuses on the ingress process module of ctu, which translates c - 5 dcp format to rainier 4gs3. the specification analysis, architecture and logic design, functional simulation testbench design, synthesis report and testing result are discussed in this thesis. the research work mainly includes : the specification analysis and design requirements of ctu logic ; the architecture and logical design of ingress process module, which includes receive control fsm, send control fsm and cell position adjustment logic ; the performance improvement of ingress process module to receive and transmit data cell at the full line speed

    本論文的主要研究工作包括:通信協議換邏輯的功能分析和設計需求;通信協議換邏輯上行方向的系統分析及體系結構設計,包括上行接收狀態機、狀態機、信元內位元組位置調整機制等的設計;通信協議換邏輯上行方向的線設計,主要是上行接收的線設計,要使用流水設計技術;提出了高實現roundrobin調度策略的實現方法,並設計實現了桶式移位和優先級編碼電路;應用bfm模擬模型設計了上行處理各模塊的模擬testbench ,完成了各級模塊的模塊模擬和系統集成模擬。
  2. Directing against state of affairs at present, such as margin of type - selection parameters being selected comparatively large during design stage of air fans for boilers in thermal power plants, the opening degree of air fans in operation being often smaller ( for adjustment of inlet regulator ) or operation at lower revolution speed ( for speed - regulating operation mode ), and efficiency of air fans being lower etc., factors and corresponding measures having to pay attention in margin selection of air fan ' s parameters have been put forward through analysing practical example of retrofitting forced draft fans in one power plant, playing certain positive role for energy - saving and benefit - increasing in power plants

    摘要針對目前火力電廠鍋爐風機在設計選型時參數裕量選取較大,運行時風門開度較小(對入口調節調節)或低運行(調運行方式) ,風機效率較低的狀況,通過對某電廠風機改造實例的分析,提出了在風機參數選擇中的裕量選取需要注意的因素及相關對策,對電廠的節能增效有一定的積極作用。
  3. Finally to accomplish the development of air speed measure components being based upon above discussion, the paper chose rationally hardware equipments, such as the tiny pressure difference sensor, the data collection system, the industrial control computer etc, solved the communication interface problems of the hardware platform, compiled the system software of the air speed on - line monitor, and raveled out a series of technical problems about the signal real time conversion, transfer, modify, calculate, display and so on

    在此基礎上,對微差壓變、數據採集系統、計算機等硬體設備進行了合理選型,解決了硬體平臺的通訊介面問題。編制風監測系統軟體,解決信號實時換、傳遞、修正、計算、顯示等監測系統二次部分開的一系列技術問題。
  4. Abstract : the function of the wheel speed sensor is to transform the wheel speed into the alternative voltage signal and send it to the electronic control unit ( ecu ) which will send ont relevant instructions according to the signal

    文摘:車輪度傳感的作用是將車輪的變為交變的電壓信號,輸給電子控制系統( ecu ) ,並出相應的指令。
  5. In this paper, two 50t / h coal - fired boilers " burning control system of 26 # heating station was studied as its thesis, the primary pid controller was improved as its purpose, fuzzy control theory developed rapidly at present was applied as its means. the design scheme is that controlling transducers change rotate speed of supplying coal electromotor, fan, and blower using 8051 micro - controller. it realized computer control of burning process

    本文以26 ~ #供熱站的2臺50t / h燃煤鍋爐的燃燒控制為課題,以改進原有pid控制為目的,以當前展比較迅的模糊控制理論為手段,提出了採用8051單片機控制變頻改變給煤機、引風機和風機的設計方案,實現了燃燒過程的計算機控制。
  6. Capacity variation of two capacitance of measuring membrance is also proportion to pressure. by amplified circuit the would be linearly converted to 420 ma dc two wire system current voltage or digital hart output signal high - speed addressable remote sender data road

    測量膜片的兩電容固定極板的被放大電路線性地換成420ma dc的二線制電流電壓或數字hart高可尋址遠程數據公路輸出信號。
分享友人