迭式工作 的英文怎麼說

中文拼音 [diěshìgōngzuò]
迭式工作 英文
stacked job
  • : Ⅰ動詞(輪流; 替換) alternate; change Ⅱ副詞1 (屢次) repeatedly; again and again 2 (及) in tim...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. To meet the demands for large space and flexible compartmentation of buildings, laminated vierendeel trusses are adopted in high - position transfer story structures. first the bearing characteristics are analyzed, in which reasonable stiffness ratio of the upper chord, middle chord, and lower chord is derived. then combined with an actual engineering model ( 1 8 similar ratio ), the static loading and pseudo - dynamic tests of two models for laminated vierendeel truss used in transfer story structures are conducted, in which one model adopts reinforced concrete, and the other adopts prestressed concrete and shape steel concrete. seismic behaviors are analyzed, including inter - story displacement, base shear - displacement skeleton curves, and equivalent viscosity - damping curves. a program is programmed to carry out the elasto - plastic dynamic analysis, and displacement time - history curves of the two models are derived. the test and analysis results show that the laminated vierendeel truss with prestressed concrete and shape steel concrete has excellent seismic behaviors. it can solve the disadvantages of laminated vierendeel trusses used in transfer story structures. finally, some design suggestions are put forward, which can be referenced by similar engineering

    為滿足建築物大空間和靈活隔斷要求,在高位轉換層結構中採用層空腹桁架結構.首先分析了其受力性能,得出了空腹桁架各構件合理的截面剛度以及布局形.然後結合一實際程,進行了兩榀層空腹桁架轉換結構模型( 1 : 8相似比)的豎向荷載下靜力試驗以及擬動力試驗.其中一榀為普通混凝土層空腹桁架,另一榀配置了預應力和鋼骨混凝土,對比分析了兩模型的層間位移比、骨架曲線以及等效粘質阻力系數等抗震性能的比較,並進行了彈塑性動力分析.試驗和分析結果表明,配置預應力和型鋼混凝土的層空腹桁架轉換結構具有良好的抗震性能,可以成功地解決層空腹桁架為轉換層結構所產生的弊端問題,最後對這類轉換層結構提出了相應的設計建議
  2. Aim at ubiquitous parallel multi - reservoir structure in our country ' s basin, the universal objective function including coefficient bi embodying a spatial significance difference at different flood control points and variable ai denoting a selection of scheduling mode is established, which provide a valid intervenor interface for flood control consultation decision. according to the real - time requirement, a model of reservoir storage allocation is proposed, which embody basic idea of phasic compensation. passing the dynamic correction to cut down the disadvantageous influence that indetermination result in on the certain degree, joining together the step alternation solving method, this model can maximally consider bias of decision makers, ensure the rationality and practicability of the solutions

    針對我國流域中普遍存在的並聯庫群結構,論文提出包含不同防洪點重要性的系數_ i和選擇調度模的變量_ i的通用目標函數,為防洪會商決策,提供了有效的人干預介面,根據實時性要求提出動態分配防洪庫容的庫容分配方法,體現了相機補償的基本思想,通過動態修正在一定程度上可以削減不確定性造成的不利影響,結合分步代求解技術,能最大限度體現決策者的偏好,保障解的合理性和可操性。
  3. In the end, based on the experience of my software design practice in sichuan telecom operation and supporting system, some software application ( software architecture based on j2ee, iterative development and usecase - prioritizing, organizing requirement based on usecase, and round - trip engineering ) is recommended in detail with large numbers of example pictures

    最後根據本人參加的「四川省電信綜合營銷支撐系統」 (新97 )項目開發過程中進行分析設計的一些實踐感悟,重點探討了上述主要面向對象技術的實踐應用,包括集成case具的軟體開發環境、以用例為核心組織需求、開發與用例的優先級劃分、雙向程的應用和基於j2ee的系統軟體架構等項目實踐內容。
  4. ( 3 ) researches the cordic algorithm and its two work modes deeply and in system, implements iterated ( gate efficiently ) cordic processor and on - line ( high performance ) cordic processor

    ( 3 )對cordic演算法以及兩種,進行了較為深入和系統的研究。基於fpga ,實現了高資源利用率的代結構cordic處理器和高性能的在線cordic處理器。
  5. The solution formula of dwell time is deduced by using the pulse iteration method and the smoothing fourier transition method, and the formula can be simplified referring to workpiece shape. according to the anastomotic status of the tool and workpiece surface, we present the new model of the inherent relation among local pressure density, removal rate, convergence ratio and residual errors, and the corresponding formulas are given. the forming cause of the edge effect in the polishing process is analyzed, and the means which reduces the edge effect is put forward

    2 、針對計算機控制光學表面成形( ccos )的加、誤差收斂特點,研製了去除函數呈高斯分佈的雙轉子結構研拋模;採用脈沖代法、平滑因子傅立葉變換法推導出駐留時間的演算法,求解過程中根據件面形的特點了各種形的簡化;提出了件表面和研拋模的吻合誤差與局部壓強、材料去除率、收斂比之間內在關系的數學模型,並推導出相應的計算公;分析了邊緣效應產生的原因,在加過程中採用相對壓力因子對去除函數進行修正,可以消除邊緣效應的影響。
  6. In the chapter three, the iterative incremental architecture - centric and use case driven development process is introduced. and afterwards, the whole software system named n2010 is analyzed and designed with detailed models, according to the process and in term of the criteria and requirements of uml

    在第三章中,主要介紹了的、增量的、以體系結構為中心的、用況驅動的開發過程,並根據此開發過程和uml的規范和要求,對n2010色譜站進行了詳細的建模設計。
  7. Thirdly, subspace iterative method is adopted in the paper, and natural periods and modes of preceding fifteen steps of zhongshan no. one bridge are solved, dynamic characteristics of this kind of structural system are obtained, inherent link between dynamic characteristics and structural rigidity is discussed deep, the viewpoint is provided that dynamic characteristics of a structure are considered as important basis whether structural scheme is rational ; in addition, the author brings out some own views and opinions about calculational methods of prestress value of different sorts of tie rods, simulation of local rigidity region, foundation of a local finite element model of a node

    另外,提出在施階段中某些構件的應力有可能比成橋狀態的應力還大,需防止在施狀態中構件因強度不足而破壞;再次,採用于空間代法,求解了拱組合體系橋梁的自振周期和振型,得出該種結構體系的動力特性,深入探討了動力特性和結構剛度之間的內在聯系,提出了把結構的動力特性為判斷結構方案是否合理的重要依據。此外,本文還就系桿預應力值的確定方法、局部剛度區域的模擬、節點局部有限元分析提出了者的見解和看法,對解決類似問題得出了一些有參考意義的結論。
  8. M there are considerable number of research concendng finie elemen method on contat problem and lot of techniques such as iteraion methd, mathematics propoming, penalty method, langrange multiplier and so on hav been developed, it is not easy to popularize the presemed methods to engineering. " field due to their complicate techniques. ms prompts the author to develop an wash that is simpler in techniques and can be @ plied to geotecilllital problems iv with less difficulty

    雖然目前接觸問題有限元計算已有大量的研究成果,所提出的求解方法也很多,如直接代法、數學規劃法、罰函數、 langrange乘子法等,但其求解技巧普遍比較復雜而不易在程領域推廣應用,在巖土程中的應用則更少,因此,本文的主要是建立一種比較簡單、方便、能夠用於程問題的接觸問題的計算方法,而其關鍵是相應的有限元計算公的建立。
  9. The direct solution for u ~ u and u ~ p form, the stagger solution for u ~ p form are compared in the convergency, stability and efficiency, from which it is concluded that the first solution used not widely before is characterized with weakly ill - conditioned stiffness and comparatively high efficiency. the finite element methods based on these three solving procedures are numerically implemented. the seabed soil under wave pressure with small amplitude can be viewed as elastic material

    詳細比較廣義biot理論u u形直接解法、 u p形直接解法與交叉代法求解彈性、彈塑性問題的收斂性、穩定性與計算效率,認為以往較少應用的u u形直接解法剛度陣病態性弱,求解效率高,更適合土問題的數值模擬,小風浪用下海床的動力響應特性可視為彈性的。
  10. ( 3 ) based on the working performance and mutual influence of the system of pcc pile - soil - cushion, pcc pile composite foundation is discussed in elastic method. a new calculation method of composite modulus of the pcc pile composite foundation is developed. furthermore, pile - soil stress ratio and settlement can be derived from the proposed method in this paper

    ( 3 )基於pcc樁?土?墊層所組成的一個體系,綜合考慮各部分的特性及相互影響,對pcc樁進行整體分析,建立樁體平衡方程,考慮pcc樁在褥墊層及下臥層中的上、下刺入量對復合模量的影響,並通過代的方法最後確定樁體模量發揮系數,提出了一種求解pcc樁復合地基模量的計算方法,進而得到pcc樁復合地基的沉降計算和樁土應力比公
分享友人